iHow this transcript is madeUnGovr transcribes the official recording with automated speech-to-text, separates speakers by voice, and matches voices to the seated roster. Names and attributions are AI estimates and may contain errors.Verify any quote yourself: click anywhere in the transcript and the official video jumps to that exact moment, so you can check any quote against the recording.
  1. PendingQueued for transcription.
  2. AIYou are hereAuto-transcribed and summarized; not yet human-verified.
  3. VerifiedReviewed and corrected by a person.

0:13 – 0:1921 turns

UnidentifiedUnidentified speaker 1Proposed13:40

Good morning and welcome to

UnidentifiedUnidentified speaker 2Proposed13:41

the June 25th, 2025 meeting of Santa Barbara County Associations of Government.

Pledge of Allegianceceremonial · click to expand · ≈9s recited, not transcribed
UnidentifiedChairProposed · by role14:00

Call to order our meeting for today here in Santa Maria and we have also available at the remote location in Santa Barbara where we have a couple of our directors there as well. If you would all please stand and join me in pledging allegiance to our flag. Ready, begin.

I pledge allegiance to the flag of the

CommentDirector BrownProposed · by introduction14:23

United States of America

UnidentifiedChairProposed · by role14:33

And

UnidentifiedChairProposed · by role14:34

I forgot roll call here so, Madam Clerk will you please call the roll.

Roll call — called by Unidentified speaker 5
Show transcript
Director Rouse? Here. Director Peroti? Here. Director Patino? Here Director Mosby? Here Director Mead? Here Director Lee? Here Here Director Lavagnino? Here Director Julian? Here Director Hartman? Here Director Clark? Here And Chair Nelson. Here,

all right so let's see 10 members or is that? All right now this is the time of the meeting for public comment this is for items that are not on our agenda. Madam Clerk are there any items of public comment today?

UnidentifiedUnidentified speaker 3Proposed15:24

If there are any members of the public on Zoom who wish to speak would you please use a raise hand feature and I will call upon you. There was one written comment submitted by Doreen White which was provided to the board and placed online as part of the agenda packet, and there are no attendees on Zoom who wish to speak.

UnidentifiedChairProposed · by role15:41

All right i'll go ahead and close public comment this time. Next item in business is our consent calendar. Are there any items that have been pulled by directors or by the public? Okay, so we have 4C that's been pulled by Supervisor Lee. Are there any other items? Anybody up here? Are there any members of the public pulling any items?

UnidentifiedUnidentified speaker 3Proposed16:08

If there are any members of the public on Zoom who wish to speak to the consent calendar would you please use the raise hand feature and I will call upon you. And there are no attendees who wish to speak.

UnidentifiedChairProposed · by role16:19

Okay, so this time we'll take a motion to approve The balance of the administrative agenda which are the consent agenda I believe that's a through T for A through T with the exception of C if I can get that motion.

UnidentifiedUnidentified speaker 1Proposed16:31

So moved.

UnidentifiedChairProposed · by role16:32

Second. Okay got a motion by Santa Maria and a second by Guadalupe. Let's go ahead and get any further comment on that? Seeing none or is it in there's no public comment on those items let's go ahead and get a roll call vote.

Roll-call vote Passed 4–0 motion by Santa Maria and a second by Guadalupe. Let's go ahead and get any further comment on that? Seeing none or is it in there's no publ
Show transcript
Director Rouse Director Perotti, aye. Director Patino, aye. Director Mosby, aye. Director Mead, aye
UnidentifiedUnidentified speaker 6Proposed16:56

with the abstention of the minutes since I was not at the last meeting please.

Roll-call vote Passed 7–0
Show transcript
Director Lee, aye Director Lavagnino, aye Director Julian, aye Director Hartman, aye Director Clark, aye Director Kaps absent. Director Brown, aye and Chair Nelson, aye
UnidentifiedUnidentified speaker 3Proposed17:18

All in favor except for the extension of the minutes.

UnidentifiedChairProposed · by role17:23

Perfect all right we'll go ahead and read item 4C into the record.

UnidentifiedUnidentified speaker 3Proposed17:27

Item 4C Highway 101 Carpentria to Santa Barbara segments for D&E public information services.

UnidentifiedChairProposed · by role17:35

Alright this items been pulled by Super sorry Director Lee. Yes.

UnidentifiedUnidentified speaker 4Proposed17:40

Thank you Chair Kaps. I was wondering, I want to ask Director Kearns to present on why we need to spend $715,000 on a PR firm?

UnidentifiedUnidentified speaker 8Proposed17:53

I'll bring Fred Luna of our staff to come up and answer that question. Thank you.

UnidentifiedUnidentified speaker 9Proposed18:03

Okay, so the Highway 101 project is covering the remaining work is about still $200 million worth of work out there. And so we still have two to three years of construction left on the primary interchange at Cabrillo and We're maintaining the same level of public information that we've had throughout the corridor since the inception, and that's proven successful in our relationship with the community.

What we've actually done is actually try to be a bit more efficient with that number if it sounds like there's a lot of inquiries that we field and working with the public and trying to be proactive We're going to be talking about the detours. It's not always easy when you closing ramps and then you have to let them know and create the materials that adequately inform them so We were actually spending at a much higher level if you can believe that and we're trying to reduce those costs because we're finishing the corridor. And so, we're looking at cost savings measures with our limited local funds. And so, we feel that's an appropriate level of effort for the work that still remains.

And I'd answer any further questions.

UnidentifiedUnidentified speaker 4Proposed19:31

Good. I have a couple of follow-up questions.

UnidentifiedChairProposed · by role19:34

Yes please, Resley.

UnidentifiedUnidentified speaker 4Proposed19:35

Thank you. So doesn't Caltrans have a PIO already?

0:19 – 0:2926 turns

UnidentifiedUnidentified speaker 9Proposed19:40

Yeah, yes they do. Caltrans has a public information office. They have about three or four staff that cover the entire of District 5 when we started the Highway 101 project which is a very large project for the district. We reached an agreement I would say to on how we were going to split services and that it was important to be able to provide an adequate and necessary level of service for the community, to be able to convey the construction and for this. And it wasn't something that their office could handle to that degree.

UnidentifiedUnidentified speaker 4Proposed20:22

Okay so you're saying their PIO cannot handle the PR needed or can they?

UnidentifiedUnidentified speaker 9Proposed20:31

They they have indicated that it's they cannot over the years and I think it's something that you know based on the level of materials and information that and other projects that the district handles across the entire, you know all the way from Santa Barbara up to San Benito in Monterey counties.

UnidentifiedUnidentified speaker 4Proposed20:52

Okay so the way I see is this is a tremendous amount for PR that I feel we don't need because everything is decided and planned. The community knows exactly what's happening so to spend more money, $715,000 of it for something that the community knows what's happening, I believe that money should go towards our local roads north and south. So those are my questions for now. I want to see if any other directors have any questions or comments. Thank

UnidentifiedChairProposed · by role21:21

you. Director Lee. Director Hartman?

UnidentifiedUnidentified speaker 10Proposed21:26

Well, I can't really comment on the amount but I know that Caltrans has closed Santa Rosa Road and they didn't reach out to businesses and residents. And so the heat is on our office to try to resolve this. So I really appreciate getting PR and making sure that the detours and that people understand They can communicate with their customers so again I can't comment on the amount but that the fact it's necessary I can attest to.

UnidentifiedUnidentified speaker 8Proposed22:02

Let's

UnidentifiedChairProposed · by role22:03

go to Director Brown and then Director Kern has a

CommentOjai TrailProposed22:10

Mr. Luna, what were the other bids that you received for this endeavor or were

UnidentifiedUnidentified speaker 9Proposed22:16

there other bids? So in the staff report we've kind of described the provide some situational awareness on where we're at with our current contractor. We couldn't reach an agreement because we wanted to like I mentioned before be effective with our local dollars And so we're going to be putting it out to bid and we're in the middle of that process right now because construction is ongoing, and we need to have those services provided.

We don't have a board meeting next week. We're asking the Board to delegate authority at that not-to-exceed mount. I imagine we've already had a pre-proposal conference. We'll have a number of people submit We're looking at hiring a firm that's going to be able to meet their qualifications for selection. We'll conduct interviews and we'll select the firm in the next couple of weeks to make that transition over.

We feel with our with the Caltrans team, we know this quarter we know what's important to communicate to the community and And so if that met your question, it's the budget $715,000 with that includes a contingency amount for the year. And that's at a level less than what we've spent in previous years that have come to the board.

UnidentifiedChairProposed · by role23:36

I'll go to Director Slavenino and then I'll come over to Director Gardner.

UnidentifiedUnidentified speaker 7Proposed23:39

Thank you Mr. Chair. So I can understand what Director Lee is talking about but I also see staffs point as well. We could be also sending out. I think it's a little bit different than when we started this thing because we started how long ago 6, 7 years ago people had no idea what was going on and there was very complicated project still is but I think now the community is a lot more bought in and understand what's happening.

I personally would leave this up to South County directors You know, I mean if it's important to them that they keep notifying their public about ongoing or they'd rather direct the money somewhere else. Personally, I don't have a stake in it and I probably should have gone to maybe go to the South County Subregional first.

UnidentifiedUnidentified speaker 8Proposed24:36

Yes, I just want to let the board know that this is a requirement of our cooperative agreement with Caltrans that we provide this service through the project and we did see the change in scope as Fred Luna indicated. It was actually twice as much or more budget per year and that's why we couldn't come up to an agreement with the current contractor because she, that agency thought it should be at the higher level And so we do provide a lot of information and this is a new community. We're going through the Santa Barbara segment now which is new, these folks haven't had to deal with it I mean unless they were going further south and it is a very complicated piece.

We are closing off ramps and moving traffic. I think it happened last week and so getting the information out about what is happening on the road and we're sending out updates every other week?

UnidentifiedUnidentified speaker 9Proposed25:36

Yeah, every two.

UnidentifiedUnidentified speaker 8Proposed25:37

So it is a pretty high intensive public information campaign that happens and it has been happening throughout the quarter but in this last segment is probably the most complicated out of all the segments because of the tight with the segment of this and all the different movement moving parts and closing roads and going closing roads City roads as well going under Cabrillo. So it is a high level of communication and the businesses in the area so we do feel that this is necessary, but it is at a half the rate. So we saw the reduction in scope because we're not you know, we're just doing construction now. We're not doing the planning and the permit asking for permits and going through boards. So and ended its requirement of our cooperative agreement with Caltrans.

So I'll pass it back over to the chair.

UnidentifiedUnidentified speaker 11Proposed26:30

All right director Mosey So I guess something that concerns me is you set a dollar value out and then go up for the RFP. If I were the contractor, that's the dollar I would hit. It just gets concerning and it sounds like you've already picked somebody

UnidentifiedUnidentified speaker 8Proposed26:44

No, we have not at all. The budgets based on the scope of work and a basic based on what we've experienced over the last 10 years of public information with the current contractor and we've basically cut that scope of work in half so that's where we came up with that number and yes it is we have to have a budget number in your action Because that is part of the authority that you're giving me as the Executive Director of this agency. But in the RFP, it could be anything and we could get numbers that are double this and then we might have to go back out to bid and do a different scope.

UnidentifiedUnidentified speaker 11Proposed27:20

I'm just saying if you got out the RFP and see what the numbers were, it just seems like you're a little bit cart before the horse here. Is that because?

UnidentifiedUnidentified speaker 8Proposed27:25

Yes, we are the cart before the horse because you don't have a July meeting. Because of the need to get this contract on board, we're asking ahead of time to ask for permission to authorize this contract because again I know we're bouncing between Susan back and forth. Because of the timing of this, we were trying to negotiate with the existing contractor. She said no like two months ago so we hurried up and created this RFP and got this on this board agenda normally we would be coming back to you to award the contract that has been gone out to the RFP. So thank you for pointing that out we didn't point that out in our report. That's kind of my concern

UnidentifiedUnidentified speaker 11Proposed28:09

I've

UnidentifiedUnidentified speaker 8Proposed28:09

noticed

UnidentifiedUnidentified speaker 11Proposed28:10

contractors seem to hit a number when you

UnidentifiedUnidentified speaker 8Proposed28:11

put one, give them a

UnidentifiedUnidentified speaker 11Proposed28:13

target.

UnidentifiedUnidentified speaker 8Proposed28:14

That definitely happens and that's yeah going out for RFP that's pros and cons on both sides if you put out a number you're gonna get five bids at $199.999 below that number, so that's part of the process.

UnidentifiedUnidentified speaker 2Proposed28:33

Director Rouse? Yeah thank you Mr. Chair yeah I have been in the middle of it right now and it's a very very complex project and I know what the contracts have been back in the past and I've always it's always raised eyebrows for me to however I've gone to a number of the public outreaches And the granularity and the knowledge and the specific things that were brought out were very valuable in terms of what we did around Montecito with all the roundabouts and the different bridges. And now, the thing we're doing is the most complicated part of all.

And so, and that thing with Hermosillo and all that really took a lot of complicated public outreach Yeah, and Caltrans understands it but they don't have the local granular knowledge that these consultants had. So I don't know about how the new company is going to do but when we did the, we used the same, we use theirs for also for the mission bridge over Cabrillo, the Mission Creek Bridge.

And that was a really long, nasty hard fought thing with the property owners businesses and the public. All the businesses on the pier and what not we needed a front man and that's exactly what we had and that worked out really well so it was actually I thought very much worth all the money we spent.

0:29 – 0:3820 turns

UnidentifiedChairProposed · by role29:47

Alright other comments from different directors?

UnidentifiedUnidentified speaker 6Proposed29:50

I just wanted to ask a clarifying question. You said that this is a required agreement with Caltrans, so we have to hire a PIO is what you're saying? So no matter what the number is, this contract is going to happen with someone. Okay. I just wanted to make sure I understood. Thank you.

UnidentifiedChairProposed · by role30:09

Yeah, I got a question real quick Director Lee before you hop back in is if that's okay. So just a few questions. You said the scope of work is half of what it was before? Is that what it is? So what was the scope of work before and what is it now?

UnidentifiedUnidentified speaker 9Proposed30:24

Yeah, I can answer that. So maybe this kind of wraps up some of the other questions that directors were asking so we did our own estimate of the scope based on our knowledge and knowing what we've done as far as level of service for the community but the scope is essentially because we have fewer projects than we need to manage right now you know? So we're really narrowing it down. We have about We're going to have less than a year left on the Montecito segment in the southern part of Santa Barbara. But then we have, like Director Rouse was indicating, the most complicated segment at Cabrillo, Santa Barbara North and that's just commencing so it's somewhat of an unknown on how many inquiries we've closed down all the ramps at Cabrillo now and so the detours are fairly complicated And just being able to convey that during summer seasons and other types of events, you know we're just we've planned for that in an allotted for that.

And so that's kind of the scope is still doing the same base things for construction but for fewer projects. And then we've kind of ratcheted back that a little bit about 30% just based on the knowledge base that we feel as we can So that's kind of how we've come to the an agreement recently on the scope.

not transcribed≈22s of audible speech the AI couldn’t make out▸ listen
UnidentifiedChairProposed · by role32:01

So I guess I'm confused. So how does landscaping fit into a PR contract?

UnidentifiedUnidentified speaker 9Proposed32:07

Landscaping projects require closures at times and notification.

UnidentifiedChairProposed · by role32:13

They'll send out the press releases

UnidentifiedUnidentified speaker 9Proposed32:14

on

UnidentifiedChairProposed · by role32:15

those?

UnidentifiedUnidentified speaker 9Proposed32:16

Press release or notifications that maybe shoulders are closed, or even ramps have been closed at times when we're doing some landscaping and so those require the public to be informed on that.

UnidentifiedChairProposed · by role32:27

So they get informed by a press release is that how that's done?

UnidentifiedUnidentified speaker 9Proposed32:30

either a press release or some type of notice on that bi-weekly construction update.

UnidentifiedChairProposed · by role32:36

Okay, so it comes in the construction update that comes from like a traffic management company that helps us with that right? So all the complicated stuff is done by a traffic management company right? No. So this company actually designs the rerouting?

UnidentifiedUnidentified speaker 9Proposed32:51

They take the information that's provided and then they convey that in terms that the public can understand versus a lane closure chart that maybe nobody can interpret. Yeah, you know an engineering plan so they describe those in words and then they they convey that and then they answer all the questions that we get when people have why did you close the ramp?

UnidentifiedChairProposed · by role33:17

How many inquiries have we gotten over the last year?

UnidentifiedUnidentified speaker 9Proposed33:22

We average... Yeah, we have phone calls. We have a hotline for phone calls. We have info emails and then we get direct messaging.

UnidentifiedChairProposed · by role33:36

I'm sure we have all that. I just am looking for numbers. What I'm trying to understand is the scope because there aren't any numbers here you know and by the numbers I'm hearing or reading There's a bi-weekly update. They interpret stuff coming from a traffic management company and they send that out bi-weekly, and for that bi-weekly report we paid them according to this $25,000.

UnidentifiedUnidentified speaker 12Proposed33:55

Right. Yeah, so I just want to clarify we do have several different things but I would say our previous contract involved working with planning commissions design review committees with the public it was a lot of activity and so yeah that's why reduced in scope and it's less than 1% of the cost of the entire project as a whole We have a hotline we have an e-mail we have a website that's contracted out that stand up for all of this. We have an annual ish construction brochure that goes out to that's mailed the U.S. Postal Service in English and Spanish So it is a really detailed scope. We look forward to seeing what proposals do come in. We're hoping that they're under budget. We scoped it out so that we can get some really good assessments here that are coming back and we don't have those numbers yet because the RFP process hasn't closed So we're off.

We're asking for authorization of up to this amount and we are going to look to see what comes in on those beds and so we have a couple thousand people on our cotton construction update and we have measurements in place that that do come in so when we close the southbound off ramp at Cabrillo, we can get And then the biweekly construction update I just want to be clear too we have we're working with granite They are also trying to meet timelines and deadlines. And we have commitments with our transit partners, our first responders to give two week notices of any closures when we close Cabrillo Boulevard under Highway 101. Our first responders have to know when those closures and where they can move in access. And so we have two week commitments to do that.

Our PR person does handle those commitments And in order to make that, she also has to go out to our residents. Yeah the consultant has to go out to our resident engineers ask them what's happening get the information and things change quickly in the project team so having somebody full-time is really important too.

not transcribed≈11s of audible speech the AI couldn’t make out▸ listen
UnidentifiedChairProposed · by role36:25

I don't doubt somebody full time but this is $650,000 is probably about three people's full time I'm on, you know what we look at when we have our own employees. I mean might make sense to have this actually in-house for this amount of money might be another alternative that we might be wanting to look at it seems like a lot of money and you know there's a lot of scrutiny on on taxpayer dollars and so when people see that you know rating $650,000 for PR that I hear out in the community a lot of people aren't happy with the level PR and I know 1% in government terms we go it's only 1% entire project. Well, what's a billion dollar projects? That's $10 million. It's a lot of money if you go out to the public especially on the South Coast and say we spent 10 million dollars on PR on this project do you feel like you were you know, got a good value for that?

Probably the answer is probably going to be no. And so again and that's the and we're this the stink test on that here and people um you know this is really late in the project I really appreciate Supervisor Lee bringing it up because I'm it seems like a high number maybe it's something we should bring internally to handle those tasks on behalf and maybe have a less cost here but I'll send it back to Supervisor Lee. I know he was the one that originally pulled this item. Supervisor Lee or sorry Director Lee. Thank

UnidentifiedUnidentified speaker 4Proposed37:34

you Chair. So The way I want to approach it is that we throw this item, that we ask Marjorie to renegotiate with Caltrans about the requirement and see if we can take this in-house. It looks like Lauren's doing a good job that she knows all the information. Why can't we do it in-house and have to spend this amount of money on? That money should go towards paving roads in the South County, North County Central.

That should be our priority. I get it but we have to start doing what we promised our communities, paving our roads so To me this is a waste of money. It could, it has to go towards something better and that's our pavement so that's my suggestion.

0:38 – 0:5217 turns

UnidentifiedUnidentified speaker 9Proposed38:24

Just on that last point the money that we're using is measuring money specifically earmarked for the Highway 101 project so...

UnidentifiedChairProposed · by role38:33

So we're not going over on that at all? No, no. Okay

UnidentifiedUnidentified speaker 9Proposed38:38

that was why staff

UnidentifiedChairProposed · by role38:39

had brought this recommendation back. What if there are excess funds in the for the 101? What happens to that? We go under.

UnidentifiedUnidentified speaker 8Proposed38:47

It would follow our cost savings policy which says it would stay in the pot and this is a standalone pot

UnidentifiedChairProposed · by role38:53

yeah

UnidentifiedUnidentified speaker 8Proposed38:53

so it would you know.

UnidentifiedChairProposed · by role38:55

Then the board would just have a new policy and reallocated some other direction like Supervisor or Director Lee's suggesting okay Well, very healthy discussion about these costs. Some different ideas out there. I'm open to suggestions or a motion on this.

UnidentifiedUnidentified speaker 10Proposed39:16

I'm willing to put forward staff recommendation. I think there's a lot involved here that we're not fully absorbing yet and I think staff has had a lot of experience, I know in Carpinteria when we first started this how many, I mean we were deluged by people reaching out to us and I don't think, I think this is kind of a one After the 101, this isn't a regular thing. So I don't think we want to bring this in-house at this point towards the end so I'll move staff recommendation.

UnidentifiedUnidentified speaker 2Proposed39:50

Now I'll second it with reiteration that I've seen first you know firsthand the value of it in in the Santa Barbara area and if you guys remember what we went through with the roundabouts and the idea with the coastal development permits and sound walls and all things have gone on in the past having that front person that is I just want to say thank you to all of our board members.

UnidentifiedChairProposed · by role40:28

Well, I think it was a healthy debate about this. I'm not going to support the motion and I appreciate Supervisor Lee bringing it up. I think that it's the scrutiny that we do receive on this type of stuff and maybe it's late. Maybe we've probably approved bigger ones over the years past but I really appreciate Director Lee's attention on this because I do think that this is a lot of money and that you know that members of the public out there One, we want to see this money throughout the state of California and locally get deployed in a more efficient manner. And I think sometimes we get caught up and get used to things just being expensive.

And that's why even just directing this to Director Kern for her you know she already understands what this looks like I think. And so she's going to authorize something that I think the general public might think was gross. The amount that we're paying for this type of stuff and I think that's unfortunate that we kind of get here with these types of deals. It seems like whenever somebody goes out for an RFP in the government, they add a zero to their proposals because they know that there's not as much scrutiny on these things or that people are just used to paying more so understand why some people want to move forward but also understand the reason why maybe not. So I'll go ahead and call for the question.

Roll call on the vote.

Roll-call vote 6–5 move forward but also understand the reason why maybe not. So I'll go ahead and call for the question. Roll call
Show transcript
Director Rouse, aye. Director Parodi, aye. Director Patino, aye. Director Mosby, no. Director Mead, no Director Lee, no Director Lavagnino, aye Director Julian, aye Director Hartman, aye Director Clark, no Director Brown, And Chair Nelson? No.
UnidentifiedUnidentified speaker 3Proposed42:20

Seven yeses and five nos.

UnidentifiedChairProposed · by role42:23

Okay the motion passes and that concludes our consent agenda this

next item of business is our discussion items or other discussion items and the first item up is a department item 5a the San Ynez Valley Railroad Trail

UnidentifiedUnidentified speaker 3Proposed42:45

And the recommended action on that item is one, receive a presentation from staff on startup activities related to the San Ynez Valley Trail project and the next steps in the coming months. Particularly regarding public outreach opportunities to approve and authorize the executive director to execute a memorandum of understanding similar to the attached And based upon review and approval by legal counsel with the signing as ban of too much Indians to receive funding awarded to S Y B C I from the Federal Highway Administration in the amount of $1,426,000 from the active transportation infrastructure investment program for the purposes on advancing work on the project. 3. Approve and authorize the executive director to execute an agreement similar to that attached and based on review and approval by legal counsel with the FHWA to be designated the primary recipient of the $1,426,000 in the ATIP funds and responsible for reporting and administrative requirements 4.

Provide direction on the staff's proposal to use ATIP funding to advance key project work and augment the existing contract with SOMAS which will be subject to future board action

UnidentifiedChairProposed · by role43:53

That's a mouthful for agenda item, gosh. Are we done? Mr. Luna please.

UnidentifiedUnidentified speaker 9Proposed43:59

Okay I know exactly thank you Chair Nelson and Board Directors this morning so I'm excited to be here to talk about the St. Ignace Trail Projects and it's something that we came in January Mike Becker and Tom presented an item to get our contractor on board. This is our first presentation and update to the Board on the work that we've done today, so we're hoping to both tell you what we've done but also what's on the future as far This project is I from the project delivery division and then Mike and Tom from the planning division with Tom being the project manager. And Tom will collaborate with me on the presentation today.

So our intent today is to kind of for the board members that aren't that familiar with this project just do a quick overview of the project description, and then give the board an update on what we've accomplished over the last six months but Also talk about those planned activities that we have coming down the line. And then specifically the recommendations speak to an opportunity that's just come up as we're working through to bring some more money to this project regarding a federal highway administration grant that was originally awarded to the San Ynez Chumash tribe and now they've We're concluding that process to transfer that over to SB CAG as the primary recipient. And so we're going to be asking the board to delegate authority to sign certain MOUs and agreements that allow us to do that.

So the project just for orientation. This is just kind of a Google snapshot overview if you look on the left there, the product starts in the city built-in at park called Riverview Park And it'll go in portions along the river or near the river and then out towards the east, ultimately ending at the intersection or near the intersection of 246 and Highway 154.

It approximately about 9 miles in length and then the I'll get into this a little bit we have funding for different components that has different scope associated so that was part of our implementation strategy structuring how we go about moving the project forward. We have some requirements to based on a grant that we have through state parks at the city built in was was granted to deliver a construction ready project in a couple years What you see there in the middle there is really key outcomes that we intend from the project. So we're looking at what we call a multi-use trail, peds and bikes. We're still trying to figure out that equestrian component in certain areas. We know that's something that might be needed or would be used. We're just trying to figure that out because it's somewhat of a complicating factor both from a design standpoint We're also working with the San Diego County Board of Directors to make sure that we have adequate funding and funding so but will work in that out.

Connecting communities, that's a big part in the sand in his Valley, you know across the entire valley this provide will And then in the future recreational opportunities. We see that, you know as enhancing that and the ability not just for people to use the trail itself but it could promote other burgeoning recreational activities in adjacent areas and then fostering economic development, you know We're going to be looking at making giving something some some of the people that are already visiting the San Andes Valley another option to use and promote and then and ride to different events and things like that they don't have to get in their car to go 2 miles.

The project objectives so this is really near-term Identify a preferred alignment and so that's key in the city of built-in. It's pretty much laid out we they the city has done a great job over the years to set aside easements for the trail and we're refining that and using that to the maximum capability that we can but in other areas, it's a little bit less defined and so That'll be part of our outreach process that will commence and really talk to the public and figure out which is the best alternatives For the remainder of the corridor as you head further east We're looking at areas that are either on tribal lands or on the state highway and we're working with Caltrans to make sure that we can accommodate those out to 154. And then as I mentioned previously, we have a commitment in the city of Bulton through the grant requirements to have a construction ready project within a couple years and so that's what our consultant team is working on.

We have a two-year window to get that delivered And then that will put us in a good position to apply for active transportation program funds in 2028. Lastly, with that federal highways grant which is called the Active Transportation Investment and Infrastructure Program. We intend on completing design up to 30%. That's the allowable use of that federal planning dollars so we can get design drawings, engineering preliminary engineering defined and do all our environmental studies through the remaining seven miles of the corridor. So that's really a big win for that federal money that we're intending on using To manage the project, we've set it up to deliver these two silos of working groups that we've set up primarily kind of related to how the funding has come in but also how the work products that we intend on accomplishing through each.

And so I mentioned in the city of built-in that's defined as segment a right now we have a project development team comprised of the city and Caltrans and the county as well because they're neighboring agency and responsible agency. to that and then and then SP CAG leading that team. And so our objectives there are to finish that like I mentioned before a construction ready document. So we're starting that alignment studies, we'll have environmental and Tom will get into this as he goes through the schedule. We'll have environmental studies and then get into the detailed design all within the next year or so.

On the right side, we have grant funding for planning. So we're going to be doing quite a bit of outreach. This is the areas where the alignment's not quite defined yet and so we really need to go out and talk to the community and figure out which one is really endorsed by those community groups and stakeholders. We're working with both the City of Solvang, the county, and the tribe primarily. And then as we get further east, Caltrans.

So I'll hand it over to Tom and he'll really talk about how we're going to launch our engagement approach starting this summer.

not transcribed≈19s of audible speech the AI couldn’t make out▸ listen
not transcribed≈9s of audible speech the AI couldn’t make out▸ listen
not transcribed≈10s of audible speech the AI couldn’t make out▸ listen

0:52 – 1:013 turns

CommentTom VoProposedself-stated52:07

All right, thank you Fred. Good morning Chair Nelson and Directors my name is Tom Vo from the Planning Division at SBCCAC in the next several slides I'll be walking you through an update on the recent and upcoming activities with a focus on public engagement for a project as this scale and complexity we have and will be engaging with many key stakeholders interested parties local partners and most importantly the residents through social media platforms and community events We will also leverage other ongoing efforts such as the county's Recreation Master Plan, the Chumash Development and Camp 4, the Highway 246 Alamo-Pentado Creek Bridge Replacement Project, the City of Bilton General Plan Update Process and Solvang Recreation Master Plan.

By leveraging these efforts, it will help the project to identify and be consistent with potential access points evacuation routes or future active transportation projects. In terms of the recent activities, we started the project back in January with a consultant team led by SOMAS. Since then, we have accomplished a number of things including the coordination and data collection with local partners to prep for the existing conditions and constraints analysis report.

To support this effort, we have been doing site visits with local staff to better understand the physical conditions of the study area We have also created a study area map to identify opportunities and constraints which will support the environmental analysis portion of the study. Through the working groups, we have developed the public engagement plan as this is a living document and last but not least working closely with the Chumash and Federal Highway Administration on the federal grant that Fred just mentioned On top of that, we have been meeting with various stakeholders and providing updates to local jurisdictions as requests.

We have several exciting activities coming up for the project. This slide provides a high-level schedule of the major activities from now until next year. Since the segment within the City of Bilton is more defined, most activities will be focused on the segment within Bilton. There are three key takeaways from this schedule. First we will start the public engagement process next month.

Second We will have the preliminary trail alignments in Bilton available by this fall and on the remainder of the corridor available by next summer. And third, we will start the environmental analysis and design work on the built-in segment this fall. To have a meaningful public engagement process, we need to have a comprehensive public engagement plan starting with clear goals and objectives.

The first goal is to build awareness. The second goal is to gather input and the third goal is to maintain transparency. We have identified tools and key performance indicators to make sure these goals can be achieved at a certain standard. For instance, we're developing a dedicated project website and a fact sheet to promote and gather input from the public.

We'll also be providing regular updates through community and tribal events as well as the news media. To support the public outreach activities, we've created a project logo and name to be used in all communication materials such as the website and fact sheets. Here are some major public events we have identified for the rest of the year, such as these Sovang Danish Days in the summer, the Chumash Intertribal Powwow in the fall and the Bilton Winterfest in the winter.

Please let us know if we missed anything here. And with that I'm going to pass it back to Fred to continue the presentation. Thank you. Okay,

UnidentifiedUnidentified speaker 9Proposed56:23

I'll just bring it home. We just have a few more slides so our intent here was to describe and as I mentioned earlier the way we're Implementing this project in different segments. So based on the either the community or the funding that we have really makes sense you can see on the left there segment AI just I mentioned that earlier is the city of built-in and so that really has its own requirements based on the funding and timeline requirements. The rest of the funding has been some of it is for the entire corridor like we have a Caltrans planning grant That's for the entire corridor and then the federal federal grant that I mentioned from the from the two matches also across the entire quarter. And so trying to fit how the funding fits with the scope that we're trying to get done is been kind of a little puzzle for us, but we're glad to do that.

And you can see there in the City of Solvang that's a Segment C. That has a bigger area, steady area because they're considering a number of routes within the City of Solvang and so we want to make sure that that's included as part of the outreach process. Similarly the area between Buellton and Solvag is unincorporated and kind of farmland so there's a few options there that are available to the team.

And then as you get further east those dashed lines D through F, you're getting into a more built environment. We have an existing class 1 facility that runs along Highway 246 that goes to the high school, Santa Ynez High School and so that is going to be part of the overall network we're trying to establish and then continuing that out to the east And then this slide really talks about in general terms the funding that we have and how it's going to meet the scope objectives. We have a total of about $2.6 million right now for planning, design, outreach and all the environmental and technical studies needed to advance the project and then in the city of Buelton as I mentioned to do the detailed design for that project. And so Segment A, the Buellton you can see there that specifically some of those funds are being used in both segments or both work packages or areas.

And then we have local contribution from the City of Solvang that will be used in their area and the state parks grant that the city of Buellton granted is going to be used in their segment, Segment A. Our overall $2.6 million right now I think the big picture, I know local funds from the county and Director Hartman's office were trying to we're actually with the federal grant that we have right now we're able to kind of reserve that director Hartman and keep that available for leveraging future funds or advancing the design when we get to that point further so that was another win came out of getting enough federal money.

As far as next steps, and Tom touched on these will be conducting our outreach starting this summer and fall. We are continuing to work on those agreements both with the tribe and FHWA getting close on those in fact the one with the tribes And then the continuing work with project teams to include that additional scope that we're talking about with the federal work. We had an initial discussion with our project working groups on Monday and they seem to concur with how we're planning on using And then developing initial documents and to identify constraints so that we just be ready with all the material to go out to the public.

So the recommendations before the board today are to approve and authorize the MOU with the San Ynez Chumash Indians. Approve and authorize an agreement with FHWA as currently presented, and it's in draft form so that would need a final legal counsel review but we'll conduct those and then provide any comments that you have in direction as both on the outreach going forward and anything else that what you want to let us know at this point in time as we're launching this project.

UnidentifiedChairProposed · by role1:00:53

All right, thank you Mr. Luna questions from the board start there with Director Hartman and then Director Rouse

1:01 – 1:0617 turns

UnidentifiedUnidentified speaker 10Proposed1:01:04

I just wanted to give a little more background. In my mind, I think of this as the Khan-Cohen cross valley connector. It really took the tribe and Sam Cohen to translate what was kind of a dream into grant proposals and identifying what the grant opportunities were. The city of Buellton, the city of Solvang joining in with the county Applying for these and we got initially from Congressman Hart the $425,000. Then we got the federal grant but that was dicey for a while and then we got the sustainability grant but we applied for many many grants and as I say it's kind of like the dog that caught the car what were we going to do with it because we couldn't implement it And so fortunately, SB CAG and Mike Becker has been involved in this for a long time and brought Fred in.

But they were willing to take this on because it is a tremendously complex project. So I just want to make sure we honor the people who really worked hard on this. Sam Cohen has left but He applied, we must have applied for 10-20 grants till we finally got enough to keep going. And Greg Hart his faith in this got us launched and that will get us our first constructed part so this is a dream come true It will define the valley like the Ojai Trail does up there. It'll connect people, many of the tourists won't have to get in their car they'll be able to go on bikes to various destinations along so it's tremendous.

UnidentifiedChairProposed · by role1:03:03

Thank you Director Hartman. Director Rouse?

UnidentifiedUnidentified speaker 2Proposed1:03:05

So Fred, you mentioned earlier about some of the easements and whatnot. Are there more easements to attain? And is there a financial component with that or is that something that's just negotiable? What's the outlook on that?

UnidentifiedUnidentified speaker 9Proposed1:03:19

I'm going to go ahead and open it up for questions. If you're familiar with the area between Bealton and Solvang, that's kind of open horse farms and ranch lands. And so the idea as Tom mentioned it in his is collaborating through the county's efforts on the rec master plan they have some ways of working with property owners on that.

not transcribed≈15s of audible speech the AI couldn’t make out▸ listen
UnidentifiedUnidentified speaker 2Proposed1:03:59

And then you mentioned that it's a multimodal trail, but you also mentioned potentially equestrian as well. So is that speak to different materials or how what's the construction actually made of?

UnidentifiedUnidentified speaker 9Proposed1:04:12

Yeah, that's part and that's part of the issue is that equestrians usually like softer material native ground or even some type of You know straw or something like that and so that's hard to maintain hard to maybe it may be even not not able to get certain type of funding you know for that component and so. That will be what we need to look at exactly

UnidentifiedUnidentified speaker 2Proposed1:04:40

because I would say you're talking about bicycles and what also the U.S.

UnidentifiedUnidentified speaker 9Proposed1:04:43

and

UnidentifiedUnidentified speaker 2Proposed1:04:43

kind of hardscape and then something That

UnidentifiedUnidentified speaker 9Proposed1:04:46

would be a

UnidentifiedUnidentified speaker 2Proposed1:04:46

horse

UnidentifiedUnidentified speaker 9Proposed1:04:46

trail. Yeah, Director Hartman referenced the Ojai Trail and so that is a hard surface separated by a soft surface and they have some railing there but in general you hear from equestrians that they don't like to be in proximate vicinity with bikes and so that's something that is really prominent about the outreach that we're going to be doing with the equestrian community I'm going to go ahead and open it up for questions. Thank you. Director Brown, the director party.

CommentOjai TrailProposed1:05:36

with RE-ART because you called it a what class one?

UnidentifiedUnidentified speaker 9Proposed1:05:39

Yeah, there's an existing Class 1 bikeway from Alamo Pintado Road out to St. Hans High School yeah.

CommentOjai TrailProposed1:05:48

Will that also require additional environmental

UnidentifiedUnidentified speaker 9Proposed1:05:52

studies and things of that nature? We haven't done that, but I imagine we'll do a screening level document that will indicate there are portions by the high school then you know need to be somewhat completed. You know and we have to make sure that the connections work. I mean that's it that's going to be a key connection at Alamo Pintado and 246 and how heads and bikes in whether there's any subtle improvements. I'll just put it that way that are needed to modify that intersection so but I can't see Based on, you know your assessment as well is that that will be a very intensive environmental effort. I also

CommentOjai TrailProposed1:06:27

want to share with the board that you know solving we're trying to decide which windmill we want to go by so it's not we can't come with and there's a lot of moving parts going on in solving right now with Thank you. Thank you, Director Brown.

1:07 – 1:128 turns

UnidentifiedUnidentified speaker 13Proposed1:07:05

Thank you, Chair. Well this is exciting being a longtime advocate for all modes of transportation and having this trail finally actually looking at being done and completed so and it's great to see so many letters of support as well So people are waiting and watching. I do have a couple questions on this project. Are, I'm not exactly 100% sure where it will be but will it be in any locations along the route that would be close to schools other than the high school so that you could maybe possibly you know safe routes of school grant if it does help Families get to school, I'm not sure if that works here or not.

UnidentifiedUnidentified speaker 9Proposed1:07:59

And perhaps in the city of Solvang there are and as we get out to San Yanez, I think there's some that's definitely a concern. Especially the tribe was very much championed as Director Hartman said one of the reasons was that we have that class 1 trail that comes from the east. I mean the West but from the East when actual reservation I'm sure that could be facilitated or the track trail

not transcribed≈16s of audible speech the AI couldn’t make out▸ listen
UnidentifiedUnidentified speaker 13Proposed1:08:44

Great, as well as looking at different areas where folks that are on the trail might be actually getting off the trail to access a business or another location and making sure that there's some kind of accessibility to get across the highway. You're looking at all that?

UnidentifiedUnidentified speaker 9Proposed1:09:04

Yeah, that's it. That's exciting them in our initial outreach and you know not to get into details but I think it's appropriate to in response to the question is that Caltrans has some projects as well that they've informed us on and there oh they've indicated some openness to those types of We're going to be looking at ways that we can improve access from crossings because that will improve access from communities that don't have to cross the highway or want to access that. That's another key component

UnidentifiedUnidentified speaker 13Proposed1:09:38

And one last comment on your outreach. I think it's really great that you're setting up a website, but you need to make sure that people know about that website in all kinds of ways. But I would also suggest maybe getting the schools involved and knowing about it and having them spread the word as well. And also the cities and that are involved, you know have something on there in the county on their website. So it comes so otherwise, it's great. Thank you so much.

UnidentifiedChairProposed · by role1:10:14

All right, Director Mosby.

UnidentifiedUnidentified speaker 11Proposed1:10:20

So bike trails. Yeah, you know where I'm going with this? I just got a photo from a camp that established on one of our bike trails in Lompoc. We spend hundreds of thousands of dollars every year cleaning up on wrong our trails and patrolling them. It's all sounds great in the perfect world. Awesome. You know But in our community, and it'll happen everywhere else too.

People are afraid to use the bike trail now because you got guys down there living with guns and they got dogs and these areas are open as such to allow that so when you're designing this think about how you're going to maintain this and keep it safe and keep people out of where they shouldn't be because you're introducing people potentially into environments they shouldn't. We put lights up on the trail to Hancock guess what happened?

Stole all the wires. So now we have light poles but no lights so just understand it all sounds rosy and great and people can go from ABCD all the way to F. Just make sure they can be safe to get there, and it's not something that's going to cost you more every year to clean up and maintain. And make sure they're safe once they find out they're not safe. People aren't going to use them anymore.

I think that goes to something actually we've been wrestling with the county.

UnidentifiedChairProposed · by role1:12:03

Senator Levy Trail was including ongoing enforcement as part of the project. That's actually the reason why Supervisor Labadino ended up supporting that, was having that as a part of the project description so I think what Director Mosby is bringing up is actually an important point and I think for a project this size of the Santa Maria River levee trail where you're talking like on that

not transcribed≈16s of audible speech the AI couldn’t make out▸ listen

1:12 – 1:1922 turns

UnidentifiedUnidentified speaker 7Proposed1:12:45

I mean, I'm retiring soon. I would love the job. It just makes people feel safer and people know that there's somebody out there it is going to derail a lot of folks that are and I think it just you know, it's part of the project. It has to be otherwise if you build it and just leave it alone like Director Mosby says it's just a it's just an invite for problems

UnidentifiedChairProposed · by role1:13:14

I've got another question. I saw Director Hartman probably wants to speak to this, so did

UnidentifiedUnidentified speaker 10Proposed1:13:19

you? Sure. I just wanted to say the Buellton section is informal trails already that people use equestrians, hikers. I don't know that I've seen bikes down there. It's really the section between Buellton and Solving that still has to be figured out But there are property owners who are quite eager to get some benefit if they will give an easement. Some have even said they're willing to construct the trail by their property, so and then the solving part will be quite probably more urban although we hope we can go by the Mission Trail there that would be More beautiful and then the existing class one trail. It probably has to go along the highway 246 out to 154 so different segments have different issues, but the least urban sections already are trails just not formalized

UnidentifiedChairProposed · by role1:14:23

Thank you, Director Hartman. Director Meadows do you want to make a comment? I'm going to let you jump in this is partly for your district.

UnidentifiedUnidentified speaker 6Proposed1:14:28

Yes thank you so much. I appreciate all the concern that you're bringing up about safety and patrols that's very appreciated and I will take that back to my council and our staff as well but I just wanted to say as someone who's generally new to the Valley something like this I know has been in the works for a very very long time And I just wanted to thank the staff, thanks Supervisor Hartman, Greg Hart, the tribe, all of the county directors here.

Mayor Brown, this is something that as someone who's very new to government you think is never going to happen and that's probably how you felt when this occurred. So, I just appreciate all the support and I'm very excited that built in basically gets to kick off this trail. Um, I also just met with our planning department the other day and because of this trail they've been very conscientious about getting easements as new developments and new properties of coming in so I wanted to recognize their hard work and effort because without those easements this trail can't be built. And so I feel like I'm getting, I'm getting the party and didn't have to do any of the planning. So I appreciate that very much from all of you and I'm very excited to move forward with this and I'm very grateful to the tribe for their cooperation on this as well as the county as well as the city of solving.

I think this is going to be great Welcome to the party. Thank you. I love the invitation.

not transcribed≈22s of audible speech the AI couldn’t make out▸ listen
UnidentifiedChairProposed · by role1:16:05

My question actually comes after the last item we just had on engagement. This seems like a lot more robust engagement than even that we're gonna have to be doing it over there at the 101 for one year, so what's the cost on this for engagement here? When I saw that

UnidentifiedUnidentified speaker 9Proposed1:16:22

slide, I was thinking about

UnidentifiedChairProposed · by role1:16:23

you. Yeah,

UnidentifiedUnidentified speaker 9Proposed1:16:26

so some of it's required as part of our planning efforts. So in your grant, you have to meet a certain type of engagement outreach, you know, so in order to get a child transplanting grant, you're required and in this particular case when we really don't have defined alternatives and there's been some controversy in the past about through studies, I think it's well worth We're going out and telling people that you know now where we have funding to move this forward and so we need to make decisions and so which is going to work best. And so that's really going to require a concerted effort on that. So what are the money? What are

UnidentifiedChairProposed · by role1:17:03

we budgeting for

UnidentifiedUnidentified speaker 9Proposed1:17:04

this? I think it's about, I'm just shooting off about two to three hundred thousand of the total. So that's about 10 percent of the 2.6. Why don't

UnidentifiedChairProposed · by role1:17:13

we go back and hire that person to go do They do it at a cheaper rate.

UnidentifiedUnidentified speaker 9Proposed1:17:19

Well, it's a lot of different work.

UnidentifiedUnidentified speaker 8Proposed1:17:21

It's actually 10% of the total grant

UnidentifiedUnidentified speaker 9Proposed1:17:26

versus 1% of the construction works.

UnidentifiedChairProposed · by role1:17:30

Yeah, we really should start get away from using percentages of projects for outreach cost guys and that's a really bad metrics It's it's horrible. You should be time and material basically is what the cost should be, and I think it's

UnidentifiedUnidentified speaker 9Proposed1:17:43

just a way of understanding but like I said well we have that conversation. You

UnidentifiedChairProposed · by role1:17:48

guys need to make sure you guys squeeze that down to something that's more appropriate not a gift of public funds to some of these contractors. All right Supervisor Hartman?

UnidentifiedUnidentified speaker 10Proposed1:17:57

Yeah, I just wanted to put a flag on one other issue and that is we hope that you will be exploring at least through solving whether this could be an alternative evacuation route in some way. That typically hasn't happened with trails but solving is in really dire straight if there's a fire and how you can just be stuck on 246 with nowhere to go. So we're trying to explore that again, it would be the first of its kind that I know of but it would go a long way to generating more public support in solving. All

UnidentifiedChairProposed · by role1:18:39

right thank you Director Hartman are there any comments down in Santa Barbara Director Lee or Director Clark? No, all right. Okay I'm sorry do we have any public comment on this item?

UnidentifiedUnidentified speaker 3Proposed1:18:55

There are any members of the public on Zoom who wish to speak would you please use the raise hand feature and I will call upon you. I will note there were 11 written comments received and they were provided to the board and incorporated into the record and there are no attendees on zoom who wish to speak on this. My apologies there is someone in Santa Barbara we have a request to speak from MOVE Santa Barbara Sarah Earoni

UnidentifiedChairProposed · by role1:19:20

All right.

1:19 – 1:2814 turns

PresenterSarah IannaroneMove Santa Barbara CountyProposedself-stated1:19:27

Is that on? Thank you, thank you for the opportunity to speak. My name is Sarah Iannarone and I am the Executive Director of Move Santa Barbara County. We're here to make sure that people who walk, bike, roll and use public transportation have the same freedom and liberty as everyone else in the community. We are highly supportive of this project we want to thank the tribe for their investment they've been leading this work for millennia across this land And no one builds these projects better than them, so we're grateful for their investment. And thanks to our regional governance because at the end of the day these multi-stakeholder processes are complex and SB CAGS work with the tribe to pull us all together on this I think is incredibly powerful and is going to get us through this project.

I do want to make some comments though on engagement at the front end, and Mayor Mosby raised this and it's actually what I came here to talk about. I do think there's a gap at this front end. It has to do with public safety and access and multi-stakeholder engagement there. What we're seeing in this sector of active transportation is increasing demand and competitiveness on these multi-use pathways as community needs are increasingly complex. We have public safety issues, ADA issues. We need to bring law enforcement business tourism e-mobility there's a lot of talk about e-bikes and e-conveyances climate mitigation intense weather like shade or rain that we need to control for and personal safety along these pathways and in fact we need to get this stakeholder engagement right on the front end so that the money that we use toward the design and construction is can mitigate the concerns of the community.

So we'd like to see something like a public safety and access stakeholder working group that helped bring all the various groups together, including law enforcement, including people who bike to talk about this from the very front end so that we have these relationships, we have these lines of communication open and then those can help us maintain the pathways in good condition because honestly Mayor Mosby is right that if we don't have these plans in place and these agreements in place about maintenance after we build if certain segments of the population can't use them, whether that's a mom with a stroller or someone with a walker or someone with an e-bike trying to commute to work. Our investment is not the highest and best use that it could be.

I also think we want to make sure that we are budgeting for this. Oftentimes, we think about construction as the end of the project but this ongoing maintenance and public safety concerns in ways that are equitable and accessible is something we need to think about so we wanted to express our strong, strong, strong and ongoing support for this project. Thank everybody who's gotten us to this place and let you know that we're willing to be engaged partners for the foreseeable future especially for some of this hard work making sure that the designs and the execution of this project are sustainable for all users well into the future. Thanks again for all of your contributions and we'll see you along the path.

UnidentifiedChairProposed · by role1:22:28

All right thank you very much for that public comment so that conclude public comment?

UnidentifiedUnidentified speaker 3Proposed1:22:33

That concludes public comment.

UnidentifiedChairProposed · by role1:22:34

All right back to board any further questions for staff on this? Seeing none, would anyone like to make a motion? Director Mead

UnidentifiedUnidentified speaker 6Proposed1:22:43

I would like to make a motion to approve the recommended items 1 through 4 on item 5A, the Santa Ana Valley River Trail please.

UnidentifiedChairProposed · by role1:22:51

Motion from Director Mead and do we have a second?

UnidentifiedUnidentified speaker 6Proposed1:22:55

I'll second.

UnidentifiedChairProposed · by role1:22:56

Second for Director Hartman any further discussion on the motion? Seeing none can we do roll call vote?

Roll-call vote Passed 12–0 motion? Seeing none can we do roll call
Show transcript
Director Rouse? Aye. Director Parodi? Aye. Director Patino? Aye Director Mosby? Aye Director Mead? Aye Director Lee? Aye Director Lavagnino, aye. Director Gillian, aye. Director Hartman, aye. Director Clark, aye Director Caps absent. Director Brown, aye and Chair Nelson, aye
UnidentifiedUnidentified speaker 3Proposed1:23:23

and motion passes.

UnidentifiedChairProposed · by role1:23:24

All right excellent

next item of business is Item 5B. Madam Clerk will you please read that item into the record?

UnidentifiedUnidentified speaker 3Proposed1:23:32

Item 5B, 2025-2060 RTP SCS Regional Growth Forecast Estimates. Recommended action approve the 2025-2060 RTP SCS Regional Growth Forecast Estimates.

UnidentifiedChairProposed · by role1:23:48

Welcome, Mr. Vaux.

CommentTom VoProposedself-stated1:23:52

Good morning again, Chair Nelson and Directors. Tom Vo here from the Planning Division at SBCCAC. Well to get the presentation loaded Okay okay sorry about that we're just going to start. Today Mia and I will be walking you through the final regional growth forecast that will support the next uh the development of the next Regional Transportation Plan and Sustainable Community Strategy.

This is a long-range plan for the region that gets updated every four years before we start i just wanted to use this opportunity to recognize your staff for working with us on this project over the last year Just quickly over, this is an overview of the presentation starting with the regional growth forecast background and timeline. We'll move on to talk about the growth forecast estimates at the county and jurisdictional levels.

There will also be a couple of comparison charts to show you different growth scenarios. And finally, at the end of the presentation we'll be asking for your approval on the final regional growth forecast estimates. All right, thank you Mike. So you must be wondering what's included in the regional growth forecast estimates? How is it being used and why is it important?

The regional growth forecasts consist of the future population households and employment for all local jurisdictions in the region As mentioned, the growth estimates are considered as one of the foundational components within the Regional Transportation Plan and Sustainable Community Strategy. Specifically these numbers will go into the land use and transportation demand models to generate different regional performance indicators such as traffic volumes, transportation modes, trip types and so forth.

These indicators are important to understand the future transportation needs for the region In addition to showing how the county is anticipated to grow, the numbers can also support funding and infrastructure planning for the region. This diagram provides a high-level overview of where we are in the process on the left and how the estimates are going to be integrated into the regional plan development on the right.

Once adopted, these estimates will be used again in both the Regional Land Use Model and the Transportation Demand Model to support the regional plan. That's why it is important for us to have the final regional growth forecast so we can start the development of the next Regional Transportation Plan and Sustainable Community Strategy. We started this update last June, and since then, we have been working closely with the Technical Planning Advisory Committee, the Subregional Planning Committee, the local input process, and we had a lot of one-on-one conversations with your staff.

This process is truly a top-down data and bottom-up local knowledge approach. Also, the growth forecast estimates were reviewed by Dr. Mark Sneed who is the local economist and the main author behind Caltrans' California Economic Forecast Report. And today we are here to seek your approval on the final numbers Now we can start focusing on the regional growth forecast estimates.

Looking at the countywide picture from 2025 to 2060, starting on the top, the population is projected to grow by about 75,000 or 17%. Households grow by roughly 38,000 or 25% at the bottom And employment growth by about 48,000 or 21% in the middle. Overall the growth projections are lower compared to the previous decades due to the anticipated changes in demographic factors.

How do these estimates look at the jurisdictional level? With that I will pass it on to Mia to go over the sub-regional growth forecast, growth comparisons and staff recommendation. Thank you.

1:28 – 1:343 turns

UnidentifiedUnidentified speaker 14Proposed1:28:44

Thank you, Tom. So we also determined sub regional estimates for all of the local jurisdictions at the city level as well as the various unincorporated sub regions of our county. We have more details on how specifically we performed these sub allocations in our report as well as the technical appendix. I'm just going to give some high-level overview of the trends that were seeing.

I'll start with households which is that middle column there We're seeing the most growth in the city of Santa Maria, the city of Lumpoc and the unincorporated Santa Maria Valley region. And then you'll notice our countywide growth there at the bottom overall. As far as population goes, we're seeing similar trends with Santa Maria Lumpoc as well as the Santa Maria unincorporated subregion having the fastest growth but you'll notice that the household growth tends to outpace the population growth across the county. This is due to a couple of factors The first is new housing development, addressing existing overcrowding. So that would lead to a reduction in the number of people in each household or household size and then we're also seeing smaller household sizes just due to demographic factors such as our aging population so there's more single older adult households and we're also seeing just smaller family sizes and folks having less children overall And so that's how you can sort of have these household increases that don't necessarily lead to a significant population increase.

For employment over there on the right, we are projecting jobs to remain concentrated in the South Coast which is the current trend. But you'll notice there's also quite significant employment growth in several of the North County cities and I'll just note here that these jobs are based on any job that's based in Santa Barbara County so it would include folks that are commuting in from other counties To work here in Santa Barbara.

It's just to put things in perspective with some comparisons the estimates I just showed and that we're seeking approval on today are displayed there in the orange our previous regional growth forecast which was done And then that green line that you'll see on the bottom is our estimates prior to that local input process where we worked with local staff to input the planned employment and housing projects.

So you'll see that the estimates that we're seeking approval on today in orange are about by 2050, 30,000 higher than the DOF estimates which is about 7%. But they're about 10,000 less than the 2019 projections. And a big part of that is due to the 2019 projections being pre-COVID And then the DOF-based projections don't necessarily have the same level of local detail and knowledge on development projects.

And then for households, by 2050 that gap is about 15,000 households or 9%, and still 5,000 units lower than the 2019 growth forecast. But overall you'll notice the trends are pretty similar and consistent so we're quite happy with that. For employment estimates, once again we see similar trends as compared to our 2019 forecast just a slightly lower projection amount post-COVID.

And for employment we were also able to project by industry. We have that data available at the subregional and city levels as well. So compared to the 2019 forecast as far as the employment sectors go, you'll notice that we're projecting more health care and education jobs. This is largely due to our aging population through 2060 and you'll notice that there's also a larger allocation of farm jobs on this has proved to be a very stable and fast-growing industry in our county post COVID So today we're seeking approval on these regional growth forecast estimates of population households employment for use in the 2029 Regional Transportation Plan and Sustainable Community Strategy.

And with that, we can take any questions you may have.

UnidentifiedChairProposed · by role1:33:42

All right, questions from the board? Director Brown then Director Musby.

CommentOjai TrailProposed1:33:48

Thank you for putting all this together. I'm curious to Of the multiple models that you used, what do you have like a confidence score for these final numbers? Yeah.

1:34 – 1:4927 turns

CommentTom VoProposedself-stated1:34:07

The answer is yes and no. So the confidence score that we have is so Director Brown, so I mentioned that throughout the process we use the authoritative sources from the Department of Finance And every year they have a very robust model and it's called the traditional cohort component models looking at specifically demographic factors such as what Mia mentioned earlier, fertility mortality migration and so forth. So their projections are more realistic based on the demographics how The region's going to grow. So we use that as the first scenario, which is the very bottom green line that Mia showed earlier based on that projection. We work closely with the technical planning Advisory Committee through your staff. They reviewed the number and they suggest you know changes to it.

And so with that we incorporate into the model And that's the orange line that you saw earlier, which is higher than the green line. And then through that process in the model there's a relationship between population and households. We use certain ratios such as population to households or population to employment to make sure that we look at the historical data and projection, make sure that those numbers match or within a reasonable range. So so with that we feel confident. So one, we work with your staff so that confidence level number one and then we use different ratios in the model looking at the historical trends and so forth to make sure that the model is to make sure that the projection is reasonable in the future. You

CommentOjai TrailProposed1:36:07

know I understand the projections and whatnot have you I don't know if I should ask you what the standard deviation would be or where you're at. But for a confidence perspective, what I'm asking is in the models that we have, we have an outliers OK? And I'm concerned one of those outliers is Vandenberg Space Force Base and the growth that they're projecting and whatnot. Are those in your models? Have they been included? And because we're trying to it's hard to project the future by using a past, it's not always accurate so I bring that up as those considerations

UnidentifiedUnidentified speaker 14Proposed1:36:49

Absolutely so we will be going back and updating this forecast in likely for 48 years. So if we see significant growth or get new information, we can input that and then update our estimates and I will say for employment there based off of a countywide data set that we purchased and so it basically tracks employers to the exact location. So we have a pretty good estimate of countywide jobs projected through 2060 that comes from our statewide authoritative sources, so it's highly correlated as well as we have really good data on jobs in 2024 and where they were in the county which is reflected in this forecast.

UnidentifiedChairProposed · by role1:37:37

All right thank you Director Brown. Director Mosby?

UnidentifiedUnidentified speaker 11Proposed1:37:40

And just looking at some of the graphs and stuff, they don't even align what we're doing with our arena or even currently right now what we are constructing in the town. So it's just I don't know how maybe these were age numbers that you got that you were looking at but I mean The base has been advertising that there are 10,000 plus jobs coming to the base. We're filling it in town already with SpaceX and the others and the demand.

And the complexity of this is that the numbers that are used here or the numbers they use there, the numbers used there we try to leverage the number of the reality and then trying to bring reality to groups like LAFCO. They go that's not true because look at this so it's like And I talked to our my staff and they like where you what there is using we're using the numbers that we have for us because then here you get in the numbers are getting from staff.

We have this circle and I try to break it down where we're getting numbers from 2010. You guys clue in because this is an important document that's used a lot of different ways. It's happening at the base and those 10,000 jobs coming plus in the secondary tertiary jobs are compounded on top of that. In somebody they're going to go somewhere and if we don't do it right, the pressures are going to be such anything housing is expensive now which you have 15,000 more people families looking for housing. You see what happens so I just I don't know maybe you can answer are they as it just antiquated is something is a be patient in four years will get these will go back and

UnidentifiedUnidentified speaker 15Proposed1:39:20

We're going to do the best we can I will say related to a long poke. From it if you look at the historical trend line for long poke it significantly changes with this forecast based off of that data and a lot There is more development coming to the city of Lompoc and the Lompoc Valley based off of what's happening on Vandenberg. And that's reflected in this forecast.

UnidentifiedUnidentified speaker 11Proposed1:39:50

I don't see it in here, I'm just looking right here under one page right here you're showing 25-30 on your whatever page number I'm on here 42-73 and I'm looking at here you're showing like nothing going on I've got 500 houses being built or being started right now and you're showing nothing for five years. So, I'm just saying these the numbers aren't reflecting other communities. I don't know what you guys got going on but it's definitely not reflecting what's going on in the community of Lompoc. I think I'm sure Santa Maria as well because you guys are getting an ORCA too.

You guys are getting the push as well if we're not gonna address what's happening I don't know why we're putting together a report that's not addressing what's happening.

UnidentifiedUnidentified speaker 15Proposed1:40:38

To defend the process, the cities of Lompoc and the city of San Marino are the two that through the local input process where we spoke with the community development departments considering all the projects there in the pipeline and expected those are the two cities that increased the most in terms of future population households I'm going to tell you right now that

UnidentifiedUnidentified speaker 11Proposed1:41:04

these

UnidentifiedUnidentified speaker 15Proposed1:41:04

numbers are way off.

UnidentifiedChairProposed · by role1:41:07

So, I got a question. I think it wasn't explained here what do we do with all this? What does this all mean? I think that's something that you need to kind of get back to what's so what would all those numbers let's say we adopt this we don't adopt the higher number or lower number we adopt Right. How does it impact anything?

UnidentifiedUnidentified speaker 15Proposed1:41:25

Sure, Nelson is a very good question. So at its very core the purpose is to inform our planning efforts so these numbers we put into our transportation models are land use models and that way when we look to see what when we plan for the future These populations, these households, these jobs inform what projects come out of that process. So for instance right now we're doing the 135 study and we're not looking at the population employment and jobs just today. We want to know what is expected in the future so that we could identify what are the solutions address those demands that are coming so that's the primary core purpose is to inform long-range transportation planning.

Most of the cities in the county use our forecast as well. They're not required to they can use whatever they want however This is a very thorough process. The state does, as Tom and Mia mentioned, prepare a countywide forecast through the Department of Finance that's based on demographics. They don't go to individual jurisdictional level so we use that as a baseline and build upon it based off of the local knowledge of just last night I heard the county has 5,000 units in the planning pipeline in unincorporated County So, you know it's those types of projects that then are added on to what will they produce in terms of households and jobs and population into the future. But ultimately the primary purpose is to inform long-range transportation planning.

UnidentifiedChairProposed · by role1:43:02

So that so it prioritizes how we do investments and the size of those investments on transportation.

UnidentifiedUnidentified speaker 15Proposed1:43:09

Right? So like for instance, our model as Tom Ramia mentioned when we run the model if we will start the Lompoc Valley study. We'll have the future. The model will produce show what are the future transportation demands the trips that these forecasted populations show into the future.

UnidentifiedChairProposed · by role1:43:31

So then you need to build out what the capacity, right? So when you add an extra lane, you need to add another intersection, those are types of things that come from this.

UnidentifiedUnidentified speaker 15Proposed1:43:40

Yes so for instance if you just ran a model based off the existing population in Lompoc Valley it may show that a certain improvement is not necessary however based off of what your forecasting for down the road and say oh you got a problem that's coming here what can we do to start looking to address that before it happens

UnidentifiedChairProposed · by role1:43:57

So for us as decision makers, we want more robust infrastructure. We want a higher forecast right?

UnidentifiedUnidentified speaker 8Proposed1:44:05

But you don't want to over build either. I get that too. The conversation we had earlier too. You know so this forecast is what I've seen here in SBCAG is we always tend to go higher than what is actually happening. So this is a little lower than last cycle's forecast, but it's much higher than Department of Finance. And so it is truth-checking. It's ambitious.

UnidentifiedChairProposed · by role1:44:35

It's ambitious and we were tracking more on the Department of Finance Yes,

UnidentifiedUnidentified speaker 8Proposed1:44:41

yes. We are closer than our trends are closer to the Department of Finance so I'm concerned about over you know and you have problems everywhere you can't solve anything you know but when you when you prioritize your problems if you're more accurate then you can prioritize your funding to address those problems more efficiently.

UnidentifiedChairProposed · by role1:44:59

Okay the next piece of this that I think is important for everybody is how does this impact RHNA? Because I think that's something we all want to understand better because we don't necessarily want to artificially adopt higher numbers and then force the state to force more housing on us. I think we want to adopt a number that gives us the most amount of flexibility, because remember RENA is just a floor. We can all do more but we don't want the state necessarily telling us you know, you have to zone these mental units. We want to have that autonomy within our own jurisdictions.

UnidentifiedUnidentified speaker 15Proposed1:45:28

So chair Nelson two things I'll touch on as a related arena. So first when the Rena process starts the Department of Housing Community Development works with us determine what is the regional need for housing to the end of the Rena planning period? So for instance in a six cycle we were looking at the 2031 and the first step in that process is what's your future population So as a baseline, HCD uses Department of Finance.

If regional forecast is within 1.5% of the Department of Finance they'll consider that reasonable and then you can have discussions to use your local forecasts. We're well beyond that we're outside of that range so In all likelihood, I don't want to guarantee anything but I would put high odds that it's going to use the HCD will use a Department of Finance. They used Department of Finance in the last cycle.

I'm not aware of other regions that didn't use Department of Finance so that is the first part. So the region-wide housing number will be based off of Department of Finance Number two. So it doesn't matter what we do today for that purpose, right?

UnidentifiedChairProposed · by role1:46:41

Okay.

UnidentifiedUnidentified speaker 15Proposed1:46:42

Number two after we receive a number actually we could start before that through this board will ultimately approve a methodology for how that region-wide housing number gets distributed or allocated to each city. And there are a variety of ways to do that. There's we have to seek to address this five objectives are defined in statute in that process, but how we get to that is completely In the last RHNA cycle, in the sixth cycle we used jobs as part of that methodology and jobs came out of the regional growth forecast. So the regional growth forecast did have an impact on RHNA.

There's nothing that requires us to do that again or this board may choose to use jobs or expect the population growth. That's to be determined and it's at your discretion.

UnidentifiedChairProposed · by role1:47:37

Okay, just want to make sure what we're getting done here today and how that ties our hands for future decisions of this board. So I was where those questions were super sorry Director Patino.

UnidentifiedUnidentified speaker 1Proposed1:47:48

I know except it has helped us with our general plan and our numbers. And so 20 years ago we thought we would be doing something at McCoy, and today we're not looking necessarily looking at McCoy because we are going to look at annexing and it won't be that far down on McCoy. So you know it's very fluid it changes and Mayor Mosby's issue we are finding is in the numbers in Santa Maria and the needs that we have are completely different than the needs and the numbers that we have coming out of Vandenberg.

And, and we met with them what a few weeks ago and they're talking about the kind of housing they need and they're informing us how many more people they're going to be having They're going to be doubling their employment out there at Vandenberg. So this is a bit another big number that we don't see necessarily see but that we're going to have to accommodate

UnidentifiedUnidentified speaker 15Proposed1:48:46

right and as mentioned the we update this periodically, we're never going to entirely accurate. We do the best we can and then update as conditions change so it's some of us not necessarily living document will be replaced but they'll be another forecast that comes to this board in a couple years that As we learn more, we adapt and similar when the board approved the last one. We are much more ambitious in our growth targets and then we had a pandemic that kind of changed everything so.

1:49 – 1:5522 turns

UnidentifiedUnidentified speaker 1Proposed1:49:18

And it helps us plan on how many schools where are we behind on that? How many schools we need? How much housing we need? How many fire stations we need how many parks we need and so that we can start planning ahead of time thank you

UnidentifiedChairProposed · by role1:49:31

Thank you, Director Pino. I have a question.

UnidentifiedUnidentified speaker 6Proposed1:49:34

So, I have two questions actually and the first one's probably going to show my ignorance so I'm going to apologize in advance. So this one okay good thanks appreciate that Director Nelson. So when we're looking at these breakdowns by the city these are obviously over the next 35 years right like the percentages for example like Built-ins at 19% household increase from 2025 to 2060 Do you like so and then the chart but the charts show regional growth by decade. I was just wondering if you have a breakdown of that by city by decade as well since you're kind of coalescing all of this data because I think that might address some of the issues that the directors are asking about, because then you might see this giant growth in like in Lompoc over the next 20 years might be 20% and then it shifts out after that.

So I was just wondering do you have this data broken out by decade by city? And is there any way to get that information to us? Because that would be helpful.

CommentTom VoProposedself-stated1:50:35

Yes, Director Mead. Thank you so much for asking that question. Including in your package today are two attachments. One is the report of the regional growth forecast. The second one is the technical appendix Within that technical appendix. You've

UnidentifiedUnidentified speaker 6Proposed1:50:52

had me a technical appendix I love it

CommentTom VoProposedself-stated1:50:54

so yeah wonderful the question is how long do you have? So, I can explain that to you but within that technical report we have all the detailed analysis of the model and then later on the second half of that it has autographs and charts breakdown of all the local jurisdictions every five years all the way from nine 1990 all the way to 2060. And you can take a look at that and see how the growth is going. Page

UnidentifiedUnidentified speaker 6Proposed1:51:27

27 of

CommentTom VoProposedself-stated1:51:27

the

UnidentifiedUnidentified speaker 6Proposed1:51:27

report. Okay, great because I think like to you know this idea that the average growth of Lompoc is gonna be 33% over the next 35 years but to your like to look at the data even San Maria as well to look at the data more closely over the next 10 years, 20 years might be a bit more reflective of that kind of the ebb and flow of how growth or basically right now growth and then probably the afterwards. So it's good to know that that data is included. I appreciate that my other and I just wanted to note this.

I was also at that Vandenberg meeting the other day in this report does note that Vandenberg is not planning on building anymore housing and I thought that that was an interesting tidbit because that does Um, well on the while they're talking about it but like who knows how they're going to do it. So I think that's an interesting piece that I'm kind of glad that was included in here because I'd rather say that they are not going to do it because then if they do great and that would be wonderful but then obviously the documentation says that it's gonna be on us This documentation says it's going to be on the city is to support the growth of Vandenberg and I actually very much appreciate that because as far as I can tell, that's what's going to be true at this moment.

And so like Lumpoc is gonna be building housing for Vandenberg. Bealton might be building unincorporated as well. So I was grateful that that was noted because, to your point about Rina, we're going to absorb that into our cities and so it's good that that was noted. So, I appreciate the technical appendix. Thank you for noting that and thank you for including that bit about Vandenberg as well.

UnidentifiedUnidentified speaker 15Proposed1:52:54

And we did recently learn supervisor Harkins right where the congressman car Carbajal had tasked Vandenberg to work with the county to also to identify some sites owned by Vandenberg that could potentially be used for housing. Yes,

UnidentifiedUnidentified speaker 6Proposed1:53:08

and that's

UnidentifiedUnidentified speaker 15Proposed1:53:08

a process

UnidentifiedUnidentified speaker 6Proposed1:53:08

that I was there and so you come up with a plan.

UnidentifiedChairProposed · by role1:53:17

Yes. Excellent. Thank you director me. Do we have any public comment or actually let me go down to Santa Barbara. Director Lee, Director Clark either one of you guys have any questions or comments? No. Thank you. All right thank you both. Any public comment on this item? If

UnidentifiedUnidentified speaker 3Proposed1:53:32

there are any members of the public on Zoom who wish to speak would you please use the raise hand feature and I will call upon you. And there are no responses.

UnidentifiedChairProposed · by role1:53:43

Okay excellent. Any further discussion or can I take a motion on this? Director Mosby

UnidentifiedUnidentified speaker 11Proposed1:53:49

I appreciate your report. Don't get me wrong, you know, I like numbers but the numbers are just not representing and I don't know maybe because you had the point of time a year or two ago, but they're not resent representing what we know is happening at Vandenberg in I get it. I understand your shot of time that you're doing that. They're off by significant magnitudes and it is what I find it ends up happening as at Lafco meetings when they use Rina's overriding considerations of findings effects to convert Aglan because of the demand arena.

And then when we see numbers like this that can be used against us and say well you don't need an annex, look right here. This is what this document says SB CAG. So granted there are numbers on paper but there are numbers that are used against communities in many ways. I mean I already know your number on page 27 in the back section there with law books doing 43-6 to 44-2. We're going to do that this year We're going to surpass that this year in population growth. So I see the numbers just so far off and I don't know is it take that long to correct numbers or data or the state? We know the state that you know, they could take 10 years to figure something out right

UnidentifiedUnidentified speaker 15Proposed1:55:11

now

UnidentifiedUnidentified speaker 11Proposed1:55:11

except for Caltrans. You guys do a good job

UnidentifiedUnidentified speaker 15Proposed1:55:13

if something like a carrier weight that way here. Is worthy of amending this. We're happy to do that. I

UnidentifiedUnidentified speaker 11Proposed1:55:21

just I appreciate you guys work and effort, but I just can't support the numbers are off so much. I would look like a fool if they approve something like

UnidentifiedChairProposed · by role1:55:31

this.

1:55 – 2:0220 turns

UnidentifiedUnidentified speaker 7Proposed1:55:37

Yeah things change. I mean everybody here is getting all hyped up on Vandenberg. I am as well We've gone through this before, where everybody got hyped about Vandenberg. That's how we ended up with Tanglewood being out in the middle of nowhere with nothing around it. We built a bunch of houses, Vandenberg decided they had other priorities and went elsewhere. And so there's a planning document that's...

and I get that you're not going to support it and that's fine but There's a lot of there's a lot of variables. We're talking about building a whole city outside it between Orchid and Los Alamos. I'm sure that's not Solomon Hills. That's probably not in the report. Yeah, 20 year project by itself. So you know, I hear and maybe it's because I've seen what it's done in the past but a lot a lot of hype about Vandenberg and I'm excited And I'll kind of believe it when I see it, when everything happens and I know they've invested hundreds of millions of dollars. That's this administration. Next administration come along and decide they're not interested in something else happens. So we've seen this yo-yo before. I think more than anybody else, the lawn poke has probably gone up and down with how the base reacts.

And so well, it's a planning document.

UnidentifiedChairProposed · by role1:56:58

Thank you, Supervisor Director Lavinio. Director Mosby?

UnidentifiedUnidentified speaker 11Proposed1:57:01

And in response that I understand, but we know new information that's coming along. And yeah if they're using data and forecasting these are numbers that are out there already. And yeah Lompoc was 5,000 the base came along rose to 25,000 in five years. And I've been on the roller coaster and seen the roller coaster. One of these and why we've been stagnant right now is because it's been said a lot even without the base law folks not growing, and we've been denied annexations for over 60 years.

So yeah, I get it but we have to get to sustainability in what's we've hit critical mass. We care carry on ourselves. And communities like Tanglewood established because communities like Lompoc get said no to. It would have been nice if Tanglewood had been inside Lompoc and in that aspect I'm saying it could have been, had the planning been lined up for that and not the door and a curtain closed. Sewer lines were put in and they were said oh well you don't need it because it's not happening but sewer lines are still put in.

UnidentifiedChairProposed · by role1:58:05

Okay thank you for the robust conversation I'll go ahead and get a motion for this item.

UnidentifiedUnidentified speaker 3Proposed1:58:13

Can we ask for public comment?

UnidentifiedChairProposed · by role1:58:14

I thought we did, sorry you have any public comment on this item?

UnidentifiedUnidentified speaker 3Proposed1:58:17

If there are any members of the public who wish to speak on Zoom would you please use the raise hand feature and I will call upon you. And there are no responses.

UnidentifiedChairProposed · by role1:58:26

All right thank you so I'll go ahead and take a motion on this item

UnidentifiedUnidentified speaker 10Proposed1:58:29

So I'll move that the 2025-2060 RTP SCS regional growth forecast estimates be approved by the board

UnidentifiedChairProposed · by role1:58:40

All right, is that the staff recommendation there? Okay. There's a motion by Hartman. I'll second that. A second by Brown. Any further discussion on the motion? All right seeing none, Madam Clerk will you please call the roll?

Roll-call vote Passed 9–2 motion? All right seeing none, Madam Clerk will you please call the roll?
Show transcript
Director Rouse? Aye. Director Parodi? Aye. Director Patino? Aye Director Mosby? No. Director Mead? Aye Director Lee? No Director Labanino? Director Julian, aye. Director Hartman, aye. Director Clark, aye. Director Capps is absent. Director Brown, aye and Chair Nelson, aye
UnidentifiedUnidentified speaker 3Proposed1:59:24

and the motion passes.

UnidentifiedChairProposed · by role1:59:27

All right thank you very much that moves us to our executive directors report

UnidentifiedUnidentified speaker 8Proposed1:59:33

yes Thank You Mr. chairperson members of the board Knowing that I'm between you and lunch, I'll be very very short. There will be no SBCAG board meeting or any other subregional meetings or technical meetings in the month of July so per the calendar that you adopted earlier and I hope you're all staying for lunch that's co-hosted by the Air District. I really appreciate their support in making the lunch happen and with that happy summer thank you.

UnidentifiedChairProposed · by role2:00:02

All right that's very short and sweet thank you Read more in her Friday updates. All right so now we'll move on to Caltrans Director Report from Aaron Hinkle, Deputy District Director of Traffic and Maintenance.

UnidentifiedUnidentified speaker 16Proposed2:00:16

Thank you Chair and Directors for allowing me to speak here today. I'm here excuse me Representing Scott Eades, my director. So first we have is the Buellton ramp closures I'd like to address the recent miscommunication we had in Buellton that's to say the least. Recent full ramp closures were incorrectly marked and proper notice was not given for them Caltrans we apologize for this indiscretion for the delays and the concerns that this caused residents, businesses and visitors to Buelton area.

The signage has been corrected and Caltrans Public Information staff have reached out to the City of Buelton and Supervisor Hartman's office to discuss construction notices through the remainder of the project. Additionally we are looking at temporary cameras to manage signal operation throughout the construction period due to damaged signal loops Our traffic and our maintenance staff are on notice and ready to address signal timing in coordination of traffic backups are observed and reported.

In the packet there was a fact sheet that you all have to review any questions on item one?

UnidentifiedChairProposed · by role2:01:42

I had a quick question. Is there any talk about maybe opening up some of those interchanges because it seemed like it was shut down for a large area not all the work has been done on each of those areas at the same time?

UnidentifiedUnidentified speaker 16Proposed2:01:59

So they can't typically we don't allow a contractor to close ramps in series. They have to skip them, they can't we have to allow people to be able to get into the communities and things so they shouldn't have multiple ramps in a row closed just answer your question Chair Nelson.

UnidentifiedChairProposed · by role2:02:21

Okay seems like there's a few that are right on Avenue Float well I guess it's every other I guess is what they're doing?

UnidentifiedUnidentified speaker 16Proposed2:02:28

Every other and that's in the contract and the lane closure charts of the contract for the contractor.

UnidentifiedChairProposed · by role2:02:35

All right

2:02 – 2:0817 turns

UnidentifiedUnidentified speaker 6Proposed2:02:39

I just want to make sure so it's my understanding that this project will be done like mid-August and the ramps will be open by then. I just wanted to get an update on is that still the plan? Like how are we doing on that, is that not true either

UnidentifiedUnidentified speaker 16Proposed2:02:51

way? I haven't heard any changes to the schedule okay well that's good but we can get back to you as we know more information

UnidentifiedUnidentified speaker 6Proposed2:03:00

great because right now like the understanding is the ramps will be open mid August and if that changes the sooner we know and the sooner we can let the public

UnidentifiedUnidentified speaker 10Proposed2:03:11

I just wanted to thank Caltrans for responding to our frantic outreach and you know sometimes government agencies don't admit when there was a mistake so we really appreciate that yeah this didn't work quite as we hoped and we're fixing it. So, thank

CommentDirector BrownProposed · by introduction2:03:35

All right. Direct Julian. Yeah, I just want to do in the last council meeting there was some concerns brought up about what's happening with ADA and cement and the closures of not so much closures but the work that's happening on in Guadalupe and asked Marge to basically send two individuals that forgot what Caltrans had We're going to be talking about the process of how we won in Guadalupe.

I'm glad to be Business Association which is new. They have new folks going on so that's where the some of the questions came on in terms of what are they doing? We had it on paper now there's a full explanation of what's going on in Guadalupe, so appreciate Caltrans and SPCAG staff for moving on that so

UnidentifiedUnidentified speaker 16Proposed2:04:40

thank you. And I'm glad you received that because yes I was reading my emails yesterday and I'm going oh my god

CommentDirector BrownProposed · by introduction2:04:45

well

UnidentifiedUnidentified speaker 16Proposed2:04:45

I'm texting Finn and emailing Finn okay We're going to go ahead and

move on to item number

CommentDirector BrownProposed · by introduction2:04:50

2. Item number 2 is the drainage work.

UnidentifiedUnidentified speaker 16Proposed2:04:51

What is the status of this? We've got it all so they thank you appreciate that Sir. I'm a single can do your item to North know how we kept them draining work drainage work is resuming on the pavement project between holy grade and built in payment work is expected to start in July. So that's when you'll see things Thank you by the way for whomever I think it was you probably mayor most before the pothole that was at 46 we got that fixed immediately so I appreciate We'll take care of things we try our maintenance teams do everything they can.

So recently as of this week I signed a speeds on survey that was done there at Robinsons bridge on 2.46 just east of home long poke city limits as result the speed limit will be lowered from 50 to 45. The signs are currently being ordered and will be installed once received there's about 3 or month or so And so the bridge design will still be able to move forward.

not transcribed≈8s of audible speech the AI couldn’t make out▸ listen
UnidentifiedUnidentified speaker 11Proposed2:06:22

That was that's good news because we I tried due to the shelter a long time ago to get it reduced. We got it from 55 to 50 and I was trying to get into 45 now, so I'm glad that the stats show to 45 and saving a couple lives would be awesome but I do appreciate the pothole. I mean like I said The next within 12 hours, I think it's patched. But I did have one question for you relating to some signage and I don't know why we're having difficulty they saying staff is saying Caltrans and I don't know.

We have to pull some on the highway with regards to parking rules that we have in the city and are saying that the Caltrans won't respond back to them. Michael maybe didn't ask him because they respond pretty fast when I asked him so If you can look into that on something with RV parking and stuff they said that they'd try to get your approval to post some signs and they're not getting anywhere.

UnidentifiedUnidentified speaker 16Proposed2:07:13

If if it's on the state right away, this city would need to pass some ordinance. We already did that. Um if you forward that to me I'm currently in transition so my office chief um is retiring as of tomorrow and so I can work with my staff to see what can be done and what we're not able to do.

UnidentifiedUnidentified speaker 11Proposed2:07:37

Okay, and thank you as well for the response on the cameras because I mentioned about cameras for the bridge as well and reach out to Caltrans and I'll see if the city can't do something as well but they've been a number of bodies they found below that bridge it'd be kind of nice to know what's going on

UnidentifiedUnidentified speaker 16Proposed2:07:52

understood But if you send me an email directly, I'll be able to take a look at that then. Mayor Mosby.

UnidentifiedChairProposed · by role2:08:00

Right. Is that it? That's it sir. I understand we have public comment on Caltrans report.

UnidentifiedUnidentified speaker 3Proposed2:08:06

There is a request to speak from Megan Dietenhofer. If you can please unmute yourself.

2:08 – 2:1522 turns

UnidentifiedUnidentified speaker 5Proposed2:08:14

Hi thank you this is Megan Dietenhoffer staff for Supervisor Hartman And one of the constituents that is a business on Santa Rosa Road wondered, and I thought I would take this opportunity to ask on their behalf if a sign stating businesses open during construction could be placed at the nearest especially southbound opportunity to exit to access Santa Rosa Road.

UnidentifiedUnidentified speaker 16Proposed2:08:40

We can look into that. Right?

UnidentifiedUnidentified speaker 5Proposed2:08:43

Okay. Thank you.

UnidentifiedChairProposed · by role2:08:46

Thank you. All right. Does that conclude Caltrans report?

UnidentifiedUnidentified speaker 16Proposed2:08:50

Yes, sir.

UnidentifiedChairProposed · by role2:08:50

Thank

UnidentifiedUnidentified speaker 16Proposed2:08:51

you, Chair

UnidentifiedChairProposed · by role2:08:51

Nelson. Thank you. Now we'll go on to our committee reports and go to Director Patino for CalCOG Board of Meeting update.

UnidentifiedUnidentified speaker 8Proposed2:09:01

Yes, Calcog met on June 3rd. In addition to their meeting they also had a legislative day where they were speaking to state representatives about the issues. The major issue was SB1087 which is the legislation on SB375 which is very near and dear to SBCAG because we've also done a white paper on changes to 375 and where we can go moving forward So CALCOG is very engaged on that issue and it's a hot topic at the board meetings as well as the staff level.

And in that legislation is moving through the process, and it's getting changed as we speak unfortunately in the wrong direction then. Our our position. So we're going to give an update on that as we move forward other than that on the agenda, they gave it a state legislative update as well as a federal reauthorization update and we're on board with Calcog in their positions on both of those items and that is all I have for that report.

UnidentifiedChairProposed · by role2:10:03

All right, thank you Director Pino and Director Patino and Director Kern. I will give a brief update on CalBans we had our meeting on June 11th. We continue to make some fiscal changes as we move from one exec director to the next and we're trying to right the ship here. We've definitely had some challenges especially with gas prices increasing but harvest season is is picking up and we're getting more and more vans out there to move ag workers throughout the state of California. And we're also hoping in the state budget that we get our Prop 4 allocation that was set aside for us which could help for our long-term solvency as well as our efforts to deploy electric vans were appropriate so that's what's going on with CalVans. And that takes us to Director Prodi for an update on

UnidentifiedUnidentified speaker 13Proposed2:10:50

LOSAN. Okay, I'm going to try and be brief here as well but I will mention that on Monday June 8th the LOSAN outreach team along with staff from LOSAN did host a community outreach meeting to folks in Montecito who there are several issues of concern with the Ortega siding project. So the outreach team came out and heard their questions it was a very passionate group I did attend that meeting and they, the outreach team will get back to them with their questions that they asked and right now that project is 30% in design it's not like a lot of questions they could not answer So, but we had heard that they were going to come to the regular Losan meeting that we hold.

I meet with Losan at the Goleta City Hall and so that was on June 15th So we prepared our room for a crowd because that's what we heard was where that was coming. And and that didn't happen, but we were ready if they did. But at that meeting it was pretty brief. We We had a third quarter fiscal report, fiscal year 25-26 reports on ridership, revenue on time performance grants budget and safety as well as approval of a release of requests for proposals for marketing services and an amendment to the Leesdale siting extension project. So it was a pretty short meeting

UnidentifiedChairProposed · by role2:12:35

Right. Thank you, Director Perry. I have a quick question about the Ortega-Sydney. I know I've been getting some comments to my office as well but that is being there's a different lead agency it's not being done in our county which seems really odd to me can you Director Kern could explain that or

UnidentifiedUnidentified speaker 8Proposed2:12:49

Director

UnidentifiedChairProposed · by role2:12:50

Perry?

UnidentifiedUnidentified speaker 8Proposed2:12:52

Ortega Siding, correct? Is that what we're talking about? So the Ortega Siding is being led by the Losan Agency as a construction project to add a passing lane on the railroad tracks so trains can pass each other going north and south because there's only one track. So they have to get off to the side. The fact that Losan is the lead agency on rail in our corridor They are out of Orange County, but they represent all the way from SLO all the way down to San Diego. So they are the lead agency on the project and implementing that and they got full funding to go get to construction so they are moving forward on that project.

UnidentifiedChairProposed · by role2:13:33

Interesting okay thank you. All right does that conclude your report? Okay and that's so that concludes now one minute reports there any directors that like to make a brief one-minute report before we head to lunch? I do.

UnidentifiedUnidentified speaker 4Proposed2:13:48

All right, please. Me? Okay well I want to invite everybody to a World Cup watch party tonight at seven o'clock USA versus Turkey in the city of Santa Barbara at the main library, the Michael Tobes Center. It'd be a great opportunity for the community it's a free event family-friendly to come and watch and cheer on the USA as they beat Turkey thank you

UnidentifiedChairProposed · by role2:14:11

Excellent. Thank you Director Lee, Director Brown and then Director Patino.

CommentOjai TrailProposed2:14:15

Yeah solving has a Utopia event 4th of July we're going to have parades fireworks and a lot of activities throughout the day so if you find yourself in Solvang it'll be a very patriotic day thank you all

UnidentifiedChairProposed · by role2:14:33

right thank you Director Brown, Director Patina

UnidentifiedUnidentified speaker 1Proposed2:14:35

Thank you. So we'll be having in Santa Maria will be having July 3rd come down to Maldonado Center. We're going to have a band, we're gonna have all kinds of things for the kids to play on and we'll have music and there will be a drone show for the fireworks that evening And then Santa Barbara County Fair is coming up July 3rd through 5th and then July 8th through 12. I don't know why they broke it up but anyway, I didn't believe the calendar but that was accurate so come to the Santa Barbara County Fair.

UnidentifiedChairProposed · by role2:15:08

All right thank you Director Patino and with that I will adjourn our meeting in our next regularly scheduled meeting is August get this right

2:15 – 2:152 turns

UnidentifiedUnidentified speaker 8Proposed2:15:19

Yeah, I do want to say that the main location is in Santa Barbara and the main location for the Air District is in Santa Maria. And so it was a change because of skipping the July meeting and December meeting. So that's so that was the issue there otherwise we would have all our meetings in one place or the other so we like to switch around.

UnidentifiedChairProposed · by role2:15:41

All right so we'll see you August 20th in Santa Barbara unless we fix that. Alright thank you.