iHow this transcript is madeUnGovr transcribes the official recording with automated speech-to-text, separates speakers by voice, and matches voices to the seated roster. Names and attributions are AI estimates and may contain errors.Verify any quote yourself: click anywhere in the transcript and the official video jumps to that exact moment, so you can check any quote against the recording.Scheduled start 6:00 PM · clock-time estimates pending review
0:00 – 0:039 turns
It's 6 o'clock, and I'm calling the Planning Commission meeting of September 2nd, 2026 to order. Could we have a roll call please?
Roll call, called by Weston Montgomery
Show transcript
To the flag of the United
States of America, and to the republic for which it stands, one nation under God, indivisible with liberty and justice.
Is there anyone here wishing to address the public communications portion of the meeting? That would be communications that are not agendized. I have no cards. Is there anyone online, Sherry? No. OK, we will close public communications and move to the consent calendar. We have the minutes of the Planning Commission of August 19th Are there any changes or problems with that agenda?
OK. In that case, the minutes will be approved as distributed. Disclosure of site visits and ex parte contacts
I've visited both sites that we were discussing today, but just briefly today.
No expertise?
No conversations. I previously visited the Flowers Amongst the Cottages but have not visited the other sites.
No ex parte and did not visit the sites.
Okay, I have visited the site of the cottages among the flowers previously Drove by it today And I have driven by the other site we'll be looking at The Planning Commission is going to be reviewing a The approved phasing plan and consider an adjustment to the cottages among the flowers. Could we have a staff report on that, please?
0:03 – 0:1011 turns
Hold on. I have to recuse myself. I live within 500 feet of the project.
Thank you.
All right. Good evening, my name is Lucas Seibert. I'm the Community Development Director here for the City of Ojai. The item you have before you tonight is a review of progress report for the Cottages Among the Flowers and more specifically the consideration of phase four construction concurrent with phase two. And this might sound familiar, because this actually was a project that came before this body basically almost a year ago to the day where this body considered this matter.
I would say during that meeting and knowing that we have a new commissioner, I probably should walk through the project, the phasing, a little bit of the history. I think all that information is provided within the staff report. Just going to give kind of an overview I'd like to do something called setting the table for the discussion. And then as a public hearing, we do need to open this up for public discussion to allow for the community to speak and then you can close that public hearing and then deliberate.
Let's start with the staff report and just kind of an overview. Up on the screen here is the four phases to the cottages, so the cottages was a project that was approved by City Council in 2007, and then the phasing aspect to this project was approved by Planning Commission, this body, in 2009. There were conditions in both instances that are together a part of the project. There was conditions for the construction of the project, and then there was conditions for the phasing of the project. Within the phasing of the project was a condition number 27 that specifically identified prior to consideration of phase four. I'm paraphrasing this. It's to come before this body as scheduled as a public hearing. So we are following that condition for consideration tonight.
On the screen are the four phases. The first phase is the phase that was recently completed and is identified within the yellow highlighted area, and if I can take my cursor and kind of show you there's two buildings that were a part of this phase. And then as a part of the settlement agreement There are two ADU style building or units that are on top of this five-car garage that you're seeing here.
So the yellow is the highlighted for phase one, the green is the highlighted area for phase 2 which has and is currently under construction right now so that area is here Phase three, which has not started
yet
because it requires phase two to be in full completion is highlighted in blue. And then the area that you're seeing here in red is phase four. Now phase four is the one that's up for consideration and discussion tonight. Phase one included four units, phase two includes three units for renovation. Three also includes three units and then four includes two units.
So what this body is up for discussion tonight is taking phase two, which is in the green and having that go concurrent with phase four. In 2025 when this first came forward as a discussion item, I believe it was in September of 2025 The ask was basically the same with a slight caveat. They had initially looked at doing access for utilities along Aliso, after this body considered the matter and approved it they realized that in doing so There was no way that they could connect utilities to Aliso, that the only way that the utilities could be connected would be along and through Oak Street. So once they realized that, that would cut directly through phase three which was a non-starter. So essentially they had abandoned that approval recognizing that that would require an additional review by this body and potentially other changes for consideration.
So that was withdrawn, but interesting enough there was also an appeal that was filed around that same time. And the appeal was dismissed challenging the phase four piece to that puzzle. So tonight for consideration is looking at taking phase four and basically having that run concurrent with phase two. So that's pretty much it. I should mention the settlement agreement. So the settlement agreement was a part of a bigger project. This is one piece to a four-piece, basically four slices to the pie.
Those other projects, one in particular is just north of here as a part of that settlement agreement which is Mallory Way. There's a project off of Montgomery that was included in that settlement agreement, as well as one on East Ojai Avenue. Those are not for discussion. That was put in this report so that you as the body were aware of that settlement agreement as it exists.
With that, if the commission has any questions I could certainly answer them.
So the phasing plan which was agreed to by the Planning Commission in 2008? Correct. Was part of the settlement coming up with a phasing plan?
The settlement agreement came forward in 2023. This project has been going on for... So the phasing
plan was just part of the original project approval?
Correct, so there was the approval by City Council in 2007 and then the phasing plan which is approved by this body in 2009. And then a long period before we ended up getting into a settlement agreement, essentially. There was a legal battle that was going on as well off and on.
The settlement didn't touch any of the phasing that had been pre-approved? It sort of
just carried that with it? No, it was basically saying to carry out the projects that have been identified. Cottages, Mallory Way, South Montgomery, East Ojai.
0:11 – 0:1612 turns
Would you explain to us, or perhaps you would like Mr. Becker to explain to us the need to make this change?
If I could have Jeff or Vim come up and speak to the ask.
Good afternoon, planning commissioners and city staff. There's a couple of reasons why we'd like to move forward with it. One is that the system that we're using for these two units, the Samara units, it has an interesting ground frame system which is the foundation system. It's a pinned foundation system. which has not been done here locally and frankly we haven't done it.
It's been permitted and submitted to the state, and it's been permitted by the city already so one of the main reasons we want to do it is to actually install and try the system out for these two units because the fourth project Lucas mentioned Mallory Way has 20 plus of these units that's going to be installed and we're not quite sure how this is going to work with our Ojai land given the rocky terrain. So, that's one of the main reasons. The second issue is that we have two of the Summer units are completed Most people haven't seen those locally.
We'd like to install and drop those on the units, and give everybody an example of what the larger project will end up looking like because that'll be in front of the council at some point in the next six months. The third thing, Lucas if you could bring the map up of the site? So the kind of the pink shaded area there, this is on the original approvals with a very large duplex. That pink shaded area is a fire lane.
Part of phase two requires that we complete the fire lane by the Fire Department. So those are pavers, that's a whole paving system so it doesn't make any construction sense for us to go in finish the fire lane with phase two which is these three units here And then rip it up. So we've already sleeved underneath the improvements, the common improvements that we did over the last 18 months so we can do that top end but to put in the rest of the system and the parking and then rip it up which is ultimately what we'd have to do.
So that's another issue. In our plan or ask Is that we stub in the utilities underneath these units, but we're not going to hook these things up Until we're done with phase three Because all the utilities that are coming in or coming in off the east side of the property through the middle of phase three You know, we have to trench through there. So some of that trenching will be occurring for phase two But we won't be completing that until we get to phase three so those are the basic reasons and You're
trenching for phase three and two at the same time?
No, two.
For two?
Phase 2, yeah. All the water, one of the reasons we stopped previously after we got approval about a year ago was that our original approvals and discussions with the Water District, Casitas was going to have the water systems for phase 4 off of Aliso. They were going to go along that. Right. That area and I'm not sure if you I sent that scan of the utility I Sent it to Sherry
that wasn't included in there.
Okay anyway, those are utility map but originally we thought the utilities were going to come off of off of Aliso and unfortunately the engineers wouldn't approve that because there's Issues with that line, too many T's off of it in that area. So the water lines will all come off of the end of Oak over here on this side, on the phase three side.
Have residents moved into phase one?
Yeah, the first two. First two we're just starting with the two ADUs at present.
And do you anticipate filling phase two before starting with residents before starting phase three?
0:16 – 0:2233 turns
Probably, or it'll be in conjunction with that.
Dust seems to be a very large issue for the residents in that area. Are you able to do anything beyond wetting the ground down to keep that from driving everybody crazy?
Well, it is a construction site. And we are doing our watering a couple times a day. It's tough, especially at this point. We've had a crazy hot summer so it is a tricky deal. Most of the heavy grading and all that has been done. And that's one of the other reasons why we went to the Samara units not only for this site but also for the larger units because those can be installed without all kind of crazy grading that you normally would have to do, besides the fact that they're built offside. So you have the less noise and you don't have the pneumatic hammers all the things that come along with construction.
Could you explain a little bit more about what the foundation is? You mentioned a pin foundation, but I don't know what
that is. Yeah, it's called a ground frame system. So it's like large pins that are driven in to the ground different sizes depending on the size of the unit. And so these are drilled into the ground at different angles And then they are tied together above ground with a metal pan system. And then your unit sits on top of it.
What's the reason for going in at angles?
Is that earthquake? Yeah, engineering, earthquake, engineering.
Do you have any questions for Jeff? You covered
initially, I think.
You were mentioning how for phase two, this red line from. Is that the water course or is that a road you were saying? That kind of starts on Aliso and then...
Yeah, that's the road. The kind of the pink area. And then the storm channel is kind of to the east of that just up against it.
So can you clarify that because the diagram looks like it's a part of phase four I guess but you were saying it's part of phase two.
Oh, yeah. The fire department has required that be completed before phase two units are occupied.
All the way to the end or just at the end of phase
two? They've all the way to the end where the turnaround is. I don't know if you can see it on your map here. There's a Deadman there for fire.
Uh-huh. Yeah. And I guess if we had the utility plan, we'd see where those lines were coming through there.
Is that the deal?
I've
got staff making copies of these so that the community can see this as well
Utilities General at the site, you know that's reliving the utilities of the 30s and The electrical feeds were also feeding some of the neighbors overhead So those are all being put underground phase one is already all underground But the rest of the phases obviously will all be underground
How will you be bringing or from where are you bringing the summary units in is that going to be on the
So that's another-
On that road from Aliso.
That's a great question because that's another one of the reasons why we want to do it. These things are installed with a massive crane, and so they're lifted up. And so we've had their crane operators that are used to dealing with some of our units, and it'll probably come in off the vacant lot side to the north off of Mallory Way. It can stretch, I think it's 140 feet.
But that's where they'll be coming in and dropping it.
So it really won't impact the cottages among
the flowers? No, there's not enough. You couldn't get a crane in there at this point.
OK.
I have a question about the Summer units. The external finishing of them will be similar to the older style cabins?
Yeah, on these two units it's cement fiber siding but yeah, it's a wood siding appearance. But they meet all state fire codes and all that.
OK, but they blend in with the other.
I had the opportunity to go and view the Summer units last year when we were looking at this, and they were really very nice. Great.
Cool.
Any other questions for Jeff? Not at this time? Not yet. OK. Thank you, Jeff. At this point, I will open the public hearing. And I have a card from Anita Cram
0:22 – 0:287 turns
Good evening. So I have a couple of comments from the beginning. First is that pavers do not need to be put down for a fire truck to get down that road, you know there's fire truck access on it currently. Second is drilling into the ground is going to be no less intrusive than what they're doing now to phase two So this is going to be a tremendous burden on the people living in the neighborhood, not just those at the cottages. People are already at breaking point from all of the noise, the trucks, the disruptions.
And that's why the phasing was set a long time ago was to keep in mind of the impact that this was going to have on the neighborhood. These cottages, in the conditions of approval it says that a professional historian is one who has to make the decisions about. It's in the conditions of approval for the Cottages Among the Flowers that they are the ones who have to make the decisions about whether or not anything that's done at the cottages matches them historically because remember these cottages are eligible for federal state and local historic landmark status Due to the loss of that, there are mitigations and one of them is that a professional historian must be involved in making decisions. That professional historian is the only one who can decide if these Samari units are comparable to the history of the cottages.
In addition, the settlement agreement This is being proposed to use as a test for Mallory Way. But Mallory Way, as the developer said, is project number four in the scope of all four of them so there's plenty of time between... There's no need to rush phases to have that particular You know, models sitting there for a while before they actually get to even being able to do it at Mallory Way. And in addition the settlement agreement that Lucas mentioned of 2023 has specific language about the interior of the Mallory Way bungalows so the approval of these Summer units at Mallory Way was illegal In the context of the settlement agreement, because that's a binding agreement. And the only people who can change that are the signatories and the Planning Commission nor the Development Director are a signatory to that agreement.
So that is a big problem for the city that they broke the conditions of approval or I'm sorry, they broke the settlement agreement when this body approved Summer units for Mallory Way. They're not a signatory. They can't do that. And the language is very specific. I sent it in as part of my comments. The language is very specific in the settlement agreement about Mallory Way and what can and cannot be done in those units. So all of those are moot, all of those approvals of Summer Units. And the development director should have never approved by decree that he could make a significant change from ground built up Homes for cottages among the flowers to these Summer units because again, the conditions of approval. This is a CEQA mitigated negative declaration It is required due to the loss of historic resources that these things be considered So there's a lot of problems with this and I think you're putting you know The city and everyone in jeopardy by moving forward when all of this has been broken In the process in the way, this is gone and the neighborhood really needs consideration on you guys just deciding to do these two Units concurrently it they won't be happy.
Thank You Anita Is there anyone else in the audience who wishes to speak to this issue I Have you filled out a card, sir? I would. Is there anyone online? No. OK. Then we'll wait for this gentleman. Thank you, sir. Ellen, what is your last name?
According to this documentation of the Melhoff me HL h a ff
Thank you.
I have several names and aliases. Thank you So the only question that I have about the proposed Four stages is I'm a little confused on the pictures The pictures only are showing it looks like construction diagrams are not given me an interpretive feel of The the area and the different things like it doesn't show windows. It doesn't show that the bushes it doesn't show termite Infestation or bugs cockroaches dirt debris leaves any of that other stuff? Thank you for having me speak
Thank You Alan Okay, I see no other people wishing to speak so I am going to close the public hearing and Bring the discussion back to the Commission Do you have any questions at this point?
Lucas, can you respond to some of the Items that were brought up in about the historian Anita's yes comments both about the history the unit choice and approval So
0:28 – 0:3315 turns
if you're looking at the so there's a couple things that I'm not necessarily on the line with in terms of what she's identifying. And then these were also brought up in 2025, so because of the multiple questions and comments that were provided by the community we put together an FAQ. That FAQ is attached to this. I don't know if you remember but at the end of that meeting when you made a determination I had made the promise that I would put together an FAQ So that is included in here as well to kind of help inform the review and process overall. Speaking specifically to, like for instance, the settlement agreement from 2023, it has a lot of different pieces to the puzzle of that four pieces of property throughout the city as a part of the settlement agreement for and working with Becker, obviously approved by City Council.
The conditions of approval specifically if you look at those, you see the conditions of approval from 2007 that specifically identify and were approved by City Council Then you also see the conditions of approval that were a part of the phasing plan, which requires the triggering of review by this body if Phase 4 is being considered. It also has language in there that speaks to the completion of Phase 3. Well here, Phase 3 isn't even being considered simply because we are still working on or the developer's still working on Phase 2.
In terms of process and procedure, the reason why it's before you is that specific condition, Condition 27 calls for this body to review and consider the progress report and then Phase 4. So because Phase 4 is being leapfrogged, it's before this body for consideration. That's the first piece. The second piece is the historian piece. There is a specific condition, she is correct through the mitigation that was a part of this project there is the requirement for historian.
It's my understanding that the developer has a contracted historian that is in constant review. I know we have in-house conditions of approval compliance officer That is out there regularly monitoring and making sure that the conditions of approval for the entire project, including both the phasing conditions as well as the conditions that were approved by city council in 2007 are adhered to.
So yes, all those pieces are in play.
I understand that Mallory Way is landmarked. Is there-
Hold on, hold on.
Is there anything similar for cottages?
Mallory Way is not landmarked.
The 25 units or something like
that are? It's being considered for landmarking, yes. This body as well as the Historic Preservation Commission had reviewed Mallory Way and then forwarded their recommendations to city council. So right now it's sitting and waiting for review by city council.
OK. Is there anything similar going on at the cottages
In terms of?
Historical. Landmarking, review. Is there any consideration?
Yeah, the site is not landmarked, does not contain a Mills Act. But through the M&D that was prepared for this project and certified in 2007 by city council, it does identify a number of conditions as mitigation to not moving forward with a landmark ultimately.
And have those mitigations all been met
Yeah, they're working on those mitigations as we go along. Now I would have to check in with the compliance officer to see what the progress report is on those. I know he's working on that kind of independently.
Jeff, do you have anything to add at this point?
Yeah, we have a plethora of consultants that are involved. So you know we have RENCON consultants and their historian as part of the project. We just had them out there last week in 105 degree weather reviewing phase two including all of our work that's going to be involved in phase two All of you guys are happy to go take a look at it. It's they're sitting on stilts Two of the phase two of those units that are in phase two So yes, we do have a consultant the city's code compliance officer Eduardo is out there probably twice a week Just doing his site visits so okay Thank You
0:33 – 0:4761 turns
The implication was also that there is some relation to the historian and the approval of the Samara units. So can you maybe give us a little more clarity on
that? So the Summer units were approved as part of a director's exemption, so let me just walk you through what that process looks like. So the director's exemption provides for projects that don't warrant planning commission or city council review to be done At staff level the interesting thing about how these directors exemptions operate is notification is provided to the Planning Commission as well as City Council as required by Essentially a policy that was adopted in 2019 and So, the Summer units are smaller in size than the two units that you're seeing up there for phase four. They're in the five to 700 square foot range and the reduction of those saves a number of trees on site so we saw them as being smaller consistent with the overall development for the cottages And then the fact that they were saving a number of trees that were on site.
Obviously, the trees have grown over the last 15-18 years so those trees that may not have been considered to be mature now qualify as mature protected trees. The historian piece I'd have to look at that condition again but I know we have well not we but The developer has a historian under contract on site doing regular check-ins. I'm not sure how regular those are, but
Do they prepare reports and submit them to the city, or
is there a process? Yeah. I haven't had them preparing reports but I do know they're making direct contact with Eduardo and our co-clients. I see. OK.
I was curious what extent the state bills, I think it's 35 and 330, had to do with the development because it looks like that bill really puts a lot of pressure for more housing units
You're talking about SB 330 and SB 35, which are basically ministerial review processes as it relates to affordable housing. And just basically multifamily development. And that's not involved? No, neither one of those applications are applicable here.
I'd like to ask an unrelated question, but it came to my attention in attachment F page 3 of 8. This is regarding the existing drainage ditch or small river however you want to look at it And it indicates that there should be a report to be done for this. What is the status of applying for the lake and stream bed alteration program, and to the fish and wildlife, a separate application?
Has that been completed? Are we clear on the protection of that drainage ditch?
Yes, Judy we have a another consultant Pax Environmental that is working with Fish and Game on a We have an application already but they're working on a Mitigation review I guess I'd call it for lack of a better word. So In fact, I just got a copy of it yesterday the draft so they're reviewing it with the landscape Architect for the project which is Bill Mallett
What kind of mitigation would that be
It's basically I would say They're summarizing what we have done already, but they also which is the planting of local wildflower seeds But they're also looking at The Mallory Way side because of all the eucalyptus. And so with that project, that kind of grove of eucalyptus will be removed. Some of those will be or most of them will be removed because they're invasive. At least that's what the report is recommending.
If a grove of eucalyptus is removed how does that change the amount of water in the channel? The ditch?
I have no idea. It's way above my pay grade, so I'm not sure.
Will that be taken into account then in this final?
Yeah, that's part of their whole report.
And does that report come to the city?
Yeah, the city would be getting a copy of it. Yeah. Okay. Yep.
Thank you.
You're
welcome while you're up there Jeff I was hoping because obviously some of the concerns are about The intensity of work on this site. It's a main concern it seems like and so I was hoping you know You're talking a little bit of what's happening with phase two right now Which is that the buildings are lifted? There's excavation happening for the foundations all three are lifted to her lifted
Two of the three are lifted, the excavation's already done.
Excavations done?
Yeah those were done by hand too so
primarily by hand. Is the third one also need foundation new foundations?
Yeah it's there's a resident in that unit so ultimately when we get to that that'll be the same thing but See, yeah the the you know the Trenching and all that stuff Will occur at some point. You know once that resident has to relocate uh-huh
and so the So then the So basically you're moving into maybe forming and pouring foundations on those buildings okay, right and then I guess if this were to, well no. So then and then if this were to get approved what would sort of be can you kind of take us through the scope of work for the phase four zone just to understand what's kind of happening concurrently on these two areas?
With this system, the screws are basically screws. Just imagine a giant screw. These are drilled in with a pneumatic gun system so you don't have the kind of crazy lifting of dirt that would occur. So just by the nature of this design it's actually less of an intrusive sort of install that you would have with trenching down three to four feet
See you have to there's some tree removal though. That's first.
There's a tree removal Yeah, yeah one of the larger trees fell down last year unfortunately, okay But yeah, there's some tree removal still. Yeah, but it's a total different animal than that was originally approved back in 2007 we actually acquired this in 2014 just so you guys know and So one of the reasons we went with these units is, as Lucas noted, was the size. It's much more in keeping with what we have there with the units versus this massive duplex which basically was lot to lot.
Roughly how long does it take to put in the foundation for the Samaras? How
many? Well, the ground frame group told us two days. So that's a whole different animal than what we're used to experiencing. That's one of the main reasons why I'm in front of you So we want to try it out and see how it works and see if it's if it's viable. I mean, so I've seen it in person At another location but you know that's a different soil condition. So we want to see how it does here And this tomorrow units would just be dropped in. So these are two units those would be actually in one day
So is there any? So the trees need to be removed. Is there any other site grading that needs to happen before the pins go in?
Most of it's actually already been done in that area, yeah. This is up against kind of where we have a sort of temporary walkthrough So there'll be a little bit of removal, scrub and other things. But it won't be the kind of typical thing that you come in and have to do a lot of grading. We're not going to be doing that.
I like the idea of getting the landscaping started earlier with this proposal. Well,
they're still going to have a lot of site work to do around it after this. They're just going to kind of be sitting there waiting.
No, the landscaping was going to
start. They won't be occupied. You know, they'll just be sitting there as basically sort of like the unit that was in the parking lot. You saw
Maybe in response to Jews Comment is a question. Is it does it stop once the Samara phase forward? Does that work stop once the Summer units are dropped or is there other work that would then continue to happen? Well before that before the utility trenching
I think I read that you're going to do the landscaping
some of the landscaping we want to do to tie in the path and So, but that's actually a lot of that is part of phase two. So you know there's a whole path improvement that even gets done to the phase one right now It's it's just the existing one that was in place which has a gravel. Where's that?
It's the one it's above the road
You can kind of see this line here Oh
This path yeah, okay, okay Okay. And then, right, so then they're basically at that point theoretically they're sitting there on site waiting for the utility work to start once phase three begins. Which is six months out, a year out?
Probably a year out, maybe a little bit longer.
I guess then a couple of questions. What if, as you said, theoretically these pinned foundations should kind of go in pretty quickly? But you also don't know for sure so what- You know, what kind of What's the what's the is there like? What's kind of the backup or the you know because if we're sitting here like oh it's gonna be two days and then you know It's like three months four months for whatever reason probably not but like I think that could be
a one The one I looked at they did in a day. Yeah, so That was Santa Barbara County So
Did they have rocky soil?
I don't think it was as rocky as our soil. But yeah, they did have some rocks
What what do you do when you hit a rock
with this group shortened? They shorten the Those rods so he basically can work around rocks Oh, you know if they run into one they shorten it and they actually
Put it one another one in somewhere
different size a different length Yeah So it's a pretty interesting system
You haven't done any There hasn't been like a test pit done or something to see
sort of what's Not yet generally
there.
Yeah, I mean they have our souls report and they came down Uh-huh, and they're gonna come down Assuming we you know get it set up
So the water will be is going in In phase three will be connected up. Well that main that Phase two buildings will have water Well, they have water after phase three is finished or how does that work? They'll have water
as they're finished. Oh, yeah. Yeah phase two will have water
Okay, so it's already it'll be connected that far. Yeah, and then yeah that goes across the digital phase four That's them.
Yeah, we'll tie in face for at the when phase three is completed as that's being completed. Okay
What else is left to do in phase four? If we approve putting the Summer units concurrent with phase two, is there anything left to do in phase four other than to connect the utilities?
That's really it. That and you know, maybe some additional cleanup on the trail because there's public improvements on that trail You know that becomes a public right-of-way So Public Works will get their say on that
0:47 – 0:5228 turns
So they yeah just kind of putting in another way I guess so that the trenching that work That does have to happen now, because you want to be able to cover it with the fire road. So it'll be-
Our plan is only to stub it to the outside edge a little bit past the outside edge of the units, the two Summer units and then it will just sit there. Right but- We already have the feed stubbed over the area that will be the fire Turn around those are already stubbed because we put in a whole Channel system there and the whole concrete bed there that has a couple feet of dirt on top of it So those already those stubs are already there now.
So these blue and magenta lines are already running under where an orange I'm already running under where the The fire roads gonna gonna go
Yeah, they're stubbed there. So you've got those already in the ground. Some portions of them. They're just not tied into Oak Street because that's a much longer run.
They're just under that? I see. There's like a section underneath the road
to get connected to on either side. Exactly. Yeah, we have a new sewer line stubbed underneath there. Electrical, gas and Edison. And we have current temp for the sewer line that goes across to phase two because that all gets cleaned up as well. This is 1930s where people just put stuff in the ground and it's all vintage. It's all very old.
Do you have approval already to pull all these lines from Oak Street?
Yeah, yeah. We've already gone through that process. We just wrapped up with Edison. OK. Casitas has been done for quite a while as well as Ojai Valley Sanitation along with all of their fees which are substantial.
Do we have further questions?
So then the real, okay so the pipes are kind of already there. So it doesn't really have anything to do with the fire road because I guess yeah it doesn't have anything to do with the fire. The
fire road is really related to phase two.
Yeah it's happening in phase two but the work that's gonna go underneath it has already done anyways.
Yeah at least the utility lines are we have those in place.
Yeah. So then really the reason is mostly just to get, to test it out and do a display? That seems like the main
goal. That's the main driver.
Which if it can happen in a couple of weeks seems like not a big deal.
But
if it's... Oh, as far as the foundation being installed? Yeah. That whole process. I mean the units are ready basically to get
dropped in. The units are wrapping up the middle of this month.
So theoretically this whole thing is actually phase four would be almost, I mean a large chunk of that would be finished before phase two is even like halfway kind of done potentially.
Well we still have to schedule everything so that you know we haven't done any of that right so you know we're probably a couple months out yeah getting it organized Getting the units, because they have to come up from the factory. That's where they're at now. And then the crane system and all that, and the foundation system. So there is work to be done.
Work on your end, not so much work on the site. I
mean some work on the site. Just organizing it all.
Okay, so the crane system comes in on the street behind the two units. Yes. Yeah,
if you walk that site we have a we have our On that side, we have kind of a construction section that's all fenced off. Becoming in that area if you've been over there, you can take a look at it. It's fenced off. OK.
Thank you, Jeff.
Thank you.
The public hearing was closed earlier. Anita? It's been open the whole time. She was never acknowledged but she had her hand up. We asked. There was no one online.
0:53 – 1:0017 turns
So
Lucas
you could reopen the public hearing but if you do that, you've got to open it up for everybody to comment so
that I did that once it was It was a mistake
Hi, might I identify that given the context of what we're talking about? I would recommend that you just open it up for the public.
Okay, the rest of you will stay seated, right?
It provides the opportunity so if you are commenting you do need to fill out a speaker's card
Well this person is online Okay Sherry could you Locate that person online, and I will reopen the public hearing at this point.
She's on. Thank you very much. I very much appreciate it. This is Teal Rowe, Ventura County. Commissioner Murphy, I really appreciate you bringing up the watershed because that's always been my concern with this entire project. And the map that's on probably you're looking at it. I'm not looking at it now but the map of the project just for the record. I want to make a record that that's a wind river and a watershed that's been feeding Ojai for history.
The other thing is that what I hear is, and I was online and I did raise my hand. And Sherry, I heard you say that there was no one online when I was online. I just want everybody to know that for the record. And what I hear since then, which I probably wouldn't have said then, is what I hear is you're getting walked through a project And I'd like to remind you all, and I do appreciate your service. I know you're sitting up there as a service to the town. It's a beautiful thing that you're offering.
That this project is based on an agreement that was made. And I think Anita Cram actually mentioned some of the things in that. I missed it because I came in a little bit right when she was talking. And I'd like to remind everybody, and I'd like it for the public record. And I do not want this to be erased in any way that that agreement that was negotiated for this project that I hear the Planning Commission being walked through at this moment being led by the planner is based on 600 Ojai signatures That we're a referendum, that we're against this project in the very beginning. So this project and this decision is I'm asking to stick to the phases which were agreed upon which are based upon public Interests, public caring hearts in Ojai that signed the referendum that were against this project.
And I ask that you stick to the phases. I asked that you do not whatever you're doing tonight stick to the phasing as it's written in the agreement and There's not a project being walked through without the agreement. That agreement is based on the people of Ojai, and I thank you very much for your service.
Thank you, Teal. At this point, I'm closing the public hearing. Lucas? The directions, our job tonight is to review the approved phasing plan which obviously we have been doing. Approving the change in phasing require a resolution. I didn't see one inherent, and so I'm wondering what that process
is? I think the cleanest way if you are... So there's a couple of... Just back up here for a second. So you are reviewing as a part of that condition of approval, the phasing plan. Because there's an interest in concurrently working through the phase two and the phase three at the same time so that's where we're at tonight. And based on the information you've heard tonight, that's really kind of what you're looking to draw conclusions from.
But in addition to that, you've also heard from the community virtually as well as in writing and in person. You as a body are charged with reviewing it and then considering it. Now, you have a couple of different options. You can review and consider and move forward with the phase four concurrent with phase two. Which I would recommend if you're doing that that it also be done by resolution similar to what we did with the project recently where there was a determination made and then we brought forward resolution for clarity in terms of the action.
There are other options that you should also be aware of, which is that you do not have to consider this. That you can deny the phase four approach and then have them move forward as the phasing plan identifies. That is an option that you have. You've considered the information and you've chosen not to move forward with phase two or in phase four, I'm sorry, and move forward as the phasing plan identifies. You have that option as well.
If you make that determination tonight, I would also recommend that you direct staff to prepare a resolution to come forward at the next meeting.
We would need a resolution with either option.
Yes, I think in either sense you probably do need a resolution. So we're just
going to direct you to prepare a resolution depending on what we decide?
Correct.
Okay, thank you
I guess the other option would be that you take no action, and that you just basically effectively denying the request at the same time. But just identify that you've reviewed as a part of the condition but are not, I guess it wouldn't necessarily be a no action, it would be a denial essentially at the same time so I retract that statement. It would be one of these two options that you're looking at.
1:00 – 1:0518 turns
If I may just to add to that the condition 27 that we're looking at And I agree with how Lucas laid that out Says prior to the commencement of phase for the Planning Commission shall have the opportunity to review the progress So as you're describing if there's no action taken that condition remains in place and that opportunity comes down the road At the end of phase three
OK. Does anyone care to tell us what you think of this?
I mean, I'm a little torn, I guess. Yeah, I think that on the one side It's, I think what's a little hard to know is how do for us to know what will happen. You know the, I think as rightly has been pointed out the phasing was set up to you know kind of stage things for the public interest. You know for people living around it to reduce the intensity or hold the intensity of action on the site to a certain level and
It was also intended to help give the current residents time to move within the projects.
Yeah, so that makes sense too. Well, yeah. I mean this doesn't really impact that element because there's nobody living there and there won't be anyone living there.
But that was part of the...
No, I mean in the units. Judy's comment was about how the phasing was established around the ability for people in the units to also be there for longer periods of time if that's accurate. So phase four, there are no units there currently. There's no one living in those units, so it doesn't really play a role in this. The intensity of work does I think and I just think it's hard to know what on the one hand these units seem like that should be pretty straightforward and maybe it's really simple but trees still have to come down there's still some site grading that has to happen.
The number of
trees that are being removed is significantly reduced, but there will be trees removed still. Yeah Okay, but that's that was
just fewer trees. You were yes. Okay?
Yeah I mean well, I mean, I think that's the point right it's like okay There's less of something the foundation system is far easier than digging a hole Forming it pouring concrete or putting the rebar and pouring concrete It's still work though, you know So I think that's why it's not exactly clear to me 100% what I'm yet to be convinced. You're still struggling with it? Yeah, I'm yet to be convinced that we should just say yeah let's do it.
Do you feel like convincing him?
You know, with the phasing part of it I think it's a good point that these are new units that are not occupied. The other piece is that while there might be concurrent work done, it may...it's not nearly to the intensity of phase two. It's dramatically different in the And a lot of the grading in the site and so forth has been done, which caused a lot of that issue I think. The other piece around it is that if it's done, the project will be done sooner.
And you know, I think there's something to be said for that. That it'll be done sooner and then it'll be normality or whatever that would be that would return
sooner than two. It's an interesting point, something I was kind of thinking about but for some... And I don't know why, but for some reason the community has not noted that. That doesn't seem to be maybe as much of a value to them and I'm not sure why. I guess we didn't... But for some reason because I thought that too it's like this is a system that they're looking to use is you know, it's an efficient system no matter what
It's going to happen at one time
or
another. And by moving it forward, you are increasing the intensity of the action for probably a few days to a couple weeks. But it does get the whole thing done sooner, which I would imagine would be a huge benefit to the community as well.
Yeah, I can see that too.
1:05 – 1:1026 turns
But I think one of the pieces, with that, I think getting and structuring the road construction and so forth and getting those pieces done. I would take that on face value. That would be something it would help to help the construction so you don't have to redo the work of laying out that fire.
And it allows him to put residents into phase two The
original phasing plan
Did not take into account the surprises that were going to come along. For example, the movement of the utilities from Aliso to Oak Street. So I think you have to be flexible and try to Get things Done efficiently and that does seem to me that this refacing would do
so if we directed you to prepare whatever Resolution we've directed to prepare Basically, then we would still have time. We've you know, we'd still come back and vote on that resolution next time
Or just sign it if we if we direct what the resolution
You can take an action and then direct a resolution to be brought forward for, so basically you would be then approving the verbiage that is provided within the resolution. Just as you do with a draft resolution that's a part of the
packet. If we approve it tonight does that give the Becker Group the opportunity or the ability to go forward with planning?
I would say that I would have them hold off until you take official action on it at the next meeting with the resolution, either way in terms of how you operate. Yeah.
OK. I think the chair is ready to hear a motion.
If I can free you. I would make a motion that we request a resolution to vote on in allowing the program or the phasing to move ahead on this project
concurrently
with phase two
and
four
Is there a second? I will second that motion. Any further discussion of it?
Yeah, I mean, I think what I would just say is, you know, I would kind of encourage the community to think about the discussion we've had tonight. Some opinions, some questions still. I think if they could find a way to respond to some of the things that maybe we're not 100% on, that would be a useful thing between now and then in the next meeting when we were to vote on this resolution.
Could you give me an example?
Well, I think in particular this idea that hey this project might be able to be done quicker. Might that be a nice thing and I think I'd be curious to get a response on that because To me it would be as someone who works in this field I think this does seem like a positive, because let's say there are issues. Well then you're tackling those issues now and you're getting it done sooner which although I can appreciate the desire while you're in the midst of construction that you don't want it to intensify also having it done sooner has its virtue so yeah.
OK, I think we are ready to call the vote. Hanson?
Yes.
Chesley?
Yes.
Murphy? Yes
OK, do you need anything else from us to prepare the resolution?
No, I have the information that you provided in terms of the verbal and working with legal will prepare a resolution for this body to vote on.
1:10 – 1:2014 turns
OK. Thank you, everyone. We will now
move on to item three, which is a tree permit and zone clearance.
Hold on. Let's wait for Commissioner. She's coming. Right. To be seated? Yes.
She's coming.
All right.
Oh my, more. You didn't kill enough trees, Maura? This is two inches thick you know.
I remember one like this. There's one like this, but not this one. It's
similar.
OK. This is much more detailed than
what we
have.
OK. We are ready for the staff report.
Mara's pulling up her PowerPoint, but yeah, she'll be giving the report tonight.
OK. Share screen? Thank you, Chair and Commissioners. Tonight or for this project it's a review and recommendation to the Community Development Director of a zone clearance and tree permit for projects located at 824 Foothill Lane. So the Municipal Code Section 10-2-1903 is regarding a zone clearance application which is required to be submitted and reviewed by the director for compliance with code standards for a structure to be either erected or remodeled in conjunction with a building permit.
So this is considered a non-discretionary or ministerial permit. These applications are reviewed for compliance with fixed objective written standards including setbacks, height, density parking. There's no subjective judgmental or personal discretion and pursuant to 41107 When five or more oak trees, sycamore heritage trees, these are considered protected trees, are to be removed cut down or relocated on a single parcel of land the applicant is referred to the Planning Commission through staff for recommendation to the director and subject to mitigation measures.
So the mitigation measures Or before I get to the mitigation measures. The current proposal requires its own clearance for the development of a approximately 4,500 square foot single-family single story residence with an attached 728 square foot two car garage, a detached ADU, an in ground pool and a linear fence slash site wall. The proposed construction meets all of the zoning standards applicable for director approval of that zone clearance.
If it wasn't for the removal of more than five protected trees, you wouldn't be seeing this zone clearance here tonight. It would be reviewed by the director. So requiring Planning Commission review and recommendation is To the director is regarding the nine protected trees and they're being requested to be removed to accommodate this new single family residence.
Pursuant to Section 10-2-1802 of the Code, an applicant for a development project which requires the filing of more than one application shall file all applications concurrently and unless this is waived by the director, the permit processing is done concurrently. And the final decision is subject to the highest level of review authority, which in this case is the Planning Commission.
Because as you see here up on the screen a tree permit for the removal of more than five trees is referred to the Planning Commission for recommendation to the director and the zone clearance is ministerial usually considered by the director So these permits are part of the same project, and that is why we are here this evening. So section 41107 of the code is regarding the protected trees and states that if the protected trees are being removed for reasons of convenience, personal taste or to facilitate new construction which is what is the situation here. The trees are to be replaced with trees of suitable type size and number And they're generally required to be replaced with like species if you're removing an oak or a sycamore.
The number, type and size of the replacement shall either be equivalent to the appraised value which in this case is 119,600 or The total sum of the diameter of all of the tree trunks together, of the removed trees which in this case is approximately 125.4 inches. If the site can't accommodate that number of trees then the dollar value of the replacement may be paid as an in-lieu fee to the city's tree fund and that's at the discretion of either director or in this case the Planning Commission So the applicant's tree mitigation proposal, and by the way out in the lobby as well as in front of you tonight is an updated tree plan and information by the arborist. And I received that after the packet went out so that's why I brought it in this evening.
If you have something similar in the packet, this is slightly different and so that's why you have it So the applicants proposal is to replace the nine Coast Valley Oaks with nine Coast Valley Oaks The The nine that they're proposing to replace with are two at 24-inch box, three 36-inch box and four 48-inch box. The replacement is approximately 31 inches in diameter with a cost of approximately $8,815 which is less than the value and diameter of the trees are being removed.
Here is a plan that shows where the trees in red are the ones that are replacing the ones that are being removed And with that, the Planning Commission is charged with back to this slide making a determination as to 1, 2 and 3. The code states that the following shall apply and that's one, two and three. The trees being removed or to be replaced with suitable size with like species which is what is happening.
are to either be at the cost, or I'm sorry. The trees are either to be at the cost of the ones being removed or the diameter and they're doing kind of a portion of both if that's what they're proposing. And again number three is if the site can't accommodate the trees then a fee can be submitted if you so choose. And with that, we do have the arborist here and potentially—and we have an applicant.
That concludes my presentation. Thank you. If you have any questions?
1:20 – 1:278 turns
Pardon me, Madam Chair. Yes. Thank you. Do you have questions for the staff? No, OK. In that case we will hear from the applicants
I brought some old school plans in case anybody's curious.
Much easier than what we're looking at when you reduce it for 9 by 11.
Hello, good evening everybody and thanks for the opportunity for me to provide a little more clarification. And thanks Mara for the presentation on our client's behalf. My name is Brett Ettinger I'm an architect my own firm and what I'd like to do is just walk you through a few clarification points if I could that may help aid in your decision-making and may also help to clarify some potential issues that some folks in the crowd might have.
Mara is correct. We have a project that is requesting to replace the removed oaks in like, in kind and in number with nine. Nine replaces nine. The nine as Mara explained are large in size right off the bat we're able to fit four 48-inch box three 36 inch boxes and two 24-inch boxes. If it's possible to bring up that tree replacement plan slash tree protection plan, it would be very helpful for me.
I'll keep talking in the meantime The process was a little confusing for me, so I apologize for not having everything in the planner's hand earlier. But once we were told that we were exempt from a discussionary design review, I kind of got excited, dropped the ball and so forth. But we nonetheless have hired a really good landscape architect. Her name is Kaylee Grubb with Arcadia Studios She was born and raised here.
We do have a comprehensive landscape plan, and she was able to—that plan could make its way up here soon—she was able to find proper space to enhance our existing remaining 23 oak trees On this one acre site, she was able to find a location for nine additional trees. Hard for me to talk without that plan but I'll try my best. The trees that are being proposed to be removed six of which are on the west side of the existing home There it is, thanks so much.
And they're labeled, they're shown in red there. I should point out that in Jan Scow's tree report five of those six are called out in fair health condition. Five of those six are called out having poor structure. If we could go to the two more sheets to the photographs? I think you should have those photographs in here.
I don't have the photographs in my PowerPoint. However, there are photographs in the Planning Commission's packet.
Okay if you can happen to find those photographs trees 309 to 314, those are the six in question on the west side. They are, once you get those photographs in front of you, you'll notice they're leaning dramatically to the east or over the existing home as it exists right now so they're over and encroaching over the roof.
So excuse me sorry we are looking at attachment C It's on the last page of attachment C and it's LT3. Go ahead, Brett.
Okay to go? So those six trees that are modest or smaller in size are already encroaching over the existing western edge of the home. And as you may all be aware, Ventura County doesn't like trees to be hanging over rooftops these days and especially if you try to get new home insurance They're actually flying drones over your house right now and telling you to chop the branches from above your tree.
So those trees, our plan there is to plant two additional trees at the southern edge of the existing oak tree canopy on the west side and one on the northern edge Selectively prune back what's left. This is a very dense oak woodland with no structure, it's just complete shade over there and the idea is to resurrect or make healthy again that oak woodland on the west side while retaining privacy toward the neighbor to the west and for our clients in their home We are also proposing for four of the replacement trees to do something that does not exist right now, and that is to add four trees to the front yard.
That's a wonderful thing because most of the trees, if not all of them are in the back and only subject to the enjoyment Our client right now, but we'll be planting four new oaks out front for the enjoyment of all a foothill lane in the immediate neighborhood. The other three oak trees that are going to be planted I've counted I told you about six so far are three in the back two on the northwest corner and one adjacent to the large specimen oak tree on the right in the northeast corner. Those are to enhance the existing oak canopy in the back, provide necessary privacy for the neighbor to the north and for our clients and to otherwise enhance and distribute the trees around the site that they otherwise aren't doing right now.
1:27 – 1:337 turns
Brett, are the proposed trees the ones that are in yellow? They're hard to see on this plan. In yellow on this plan? Yes. They are in yellow? Yeah, okay.
And then there's a really hard-to-see legend here that calls out the size of each of these. So there's one, two, three, four... How close is the closest tree to the house? Proposed. Well, they're far away from the house you can see there They're around the perimeter of the site, pretty much on this one acre site. There are some existing trees that are somewhat close to the house that we're retaining. Can you speak into the microphone? I'm sorry, trying to point at the same time. I'm sorry about that.
Yeah so there's three wonderful specimen sycamore trees. I'd point but you wouldn't be able to hear me. The big green one right there near and that's what we've designed the house around. We've located the entry off Off the knuckle of that big statement sycamore tree, that one right there. So that dictated our design. There are two other sycamore trees on the eastern edge there of the motor court that are wonderful.
There's a statement oak right there that's wonderful I think the whole neighborhood enjoys that and then there's some big mature oaks in the back or the northern part of the property you can see 1 2 3 4 they're big they're mature they're real specimen trees All of that into account, why in addition to the six that I told you about are we proposing to remove?
What about those other three? They are the three red circles up around the pool right there. And they're smaller in stature but nonetheless they're important trees this is a very odd House right now, although its presence at the street is wonderful and charming. In the backyard it's the oddest graded site I've ever seen in my 35 years of architecture. When you're in the house right now, it's all glass with sliding doors. And 10 feet to the north, it steps up about four feet, the paving and the landscape and the hardscape. So when you're in the house, you feel like you're in a pit much to the disenjoyment Our clients, so we are proposing to extend the living space north. Bring the grade down so that they can have an outdoor living space that's actually useful for them if that makes any sense?
And so as a result, we're taking these four foot walls and moving back careful not to touch the bigger oak trees to establish a lower grade and then enhance their visual beauty from the house and from all around. So that's why those three smaller red trees are being proposed, so that totals nine but six of which I would say would probably have to go anyway if the fire department has any say. So technically we're at three that we've designed the house to necessitate the removal of those three trees.
The house itself, just real quick. We take special care on all our projects to be super respectful of the natural environment. This house is deliberately only one story and it's made up of several volumes probably eight or nine volumes that are all separate and have different size to break down the massing of the house and keep it low-key with lots of shadow In between all of these volumes are low roofs with glass elements that actually form framed views of all of the landscape, specifically the oaks.
All of their beauty into the house and vice versa so We took a lot of care and design in this house. So that it wasn't a big massive two-story home It's a low key very restrained house with appropriate traditional material. It's all white plaster our own sort of special stew of white plaster that really allows for beautiful shadows and sunlight And is a great backdrop, a horizontal backdrop for these beautiful vertical trees that we have on the site.
So it's probably way more than you needed to know but I wanted to give you a little reason and I must apologize like I said we didn't expect design review so I didn't have a chance to do what I normally do on all of our projects when we go through public design review and that is to meet with any of the neighbors to talk them through our design Did not have a chance to do that. So I apologize to you and I'm available with this big set of drawings to meet any of you after To walk you through our landscape plan our architectural plan And our grading and drainage plan to further elaborate Any things that I might not have talked about here to give you a little more information on why we've done what we've done Thank you for your time
Is the landscape artist who planned where to put the replacement trees here?
Yes, I have it here. They're there all over the world. I'm
asking if the person is here.
The landscape
architect is not here, no. Thank you. OK, do you have any questions for him at this time?
1:33 – 1:3821 turns
I just have a question about the mitigation proposal. OK, we haven't.
Are
you going to address that or is
there? I believe Jan might be here. There he is right there so he will be able to answer any technical objective questions that you might have.
Maybe we could have him. Thank you.
Good evening. I'm Jan Scow, I live in Ojai. I am the arborist for the project
So I just had questions if you could walk us through the mitigation so I do I see that your appraised value is 119 thousand six hundred of the nine trees to be removed and And then that is 125 inches of trees being removed. And the replacement trees is 31.1 inches, so that leaves a total of 94.3 still to mitigate, inches to mitigate? Yes
correct.
Okay and then on the trees that are planted So so then the 94 inches what is that represent in value?
Okay, so if you Calculate this using 24 inch box trees which is fairly typical They they are they cost a specific amount If you divide that Multiply that I'm sorry multiply that times the number of Inches each one of those trees is a set diameter And so you come out with the dollar value So
what would that dollar value be?
It is the number on here, which is Is
that the 8000 number?
Yeah eight thousand eight hundred and fifteen. Oh
So that 94 inches equates to 8,815 using 24-inch boxes? Yes. OK.
Yes, they're not all 24-inch box. However, you kind of rounded it Rounded the dollar amount I'm gonna leave it back to Jan but
yeah, so we're not talking about the trees that are getting planted. We're talking about Just a mitigation value. So we're so I'm using 24 inch box oaks which cost about $205 wholesale That price varies all the time. So it may be 220 today Basically, we're establishing the equivalency in stem diameter So the trees are 2.2 inches in stem diameter and a 24 inch box tree We're arriving Dividing that into that 96 inch number to find out how many trees we would need to meet that stem diameter replacement value So and then once you've got that number multiplying at times the dollar per tree, and that's where the $8,800 comes from I Would Interject here that I don't like this system very much But it is what it is.
Yeah, because I was just confused because it when you talk about the dollar dollar value It's a hundred nineteen thousand six hundred appraised value of the existing trees And then you subtract what you want to put into the tree fund, which is $9,675, which leaves a total of $109,925. It's a big number. You can massage these figures any way you want to.
That's why I don't like the system you guys can decide that The applicant has to pay the appraised value. You can subtract the value of the trees planted from that. That's certainly one option Frankly, I think doing it that way or you're kind of punishing a little beyond what needs to be punished But that's not my call so If you're doing if you take the appraised value completely away and Just do a stem ratio, you know stem size equivalency You come up with a very certain number if you put that stem size Equivalency aside and ignore it and just do an appraisal. You come up with a very specific number. They are very different Obviously
right? That's what I'm noticing. So the
ordinance leads you there and You guys get to choose how you rule on this. Is that sort of clear?
1:38 – 1:4415 turns
It's clear to me, I just wanted you to talk me through it because I was seeing it... It
can make you crazy.
Yeah and it is a big number but I think for me it's more important to have replacement trees young ones that can establish well In our climate and not, you know have more of the younger trees and fewer of the big box trees.
Right? I agree with that. I would also say that The money that is part of the mitigation It would be my hope that that money would go into planting small trees around the city That money would go into the city tree fund. So it would plant small trees and Yes, small trees are better 48 inch box trees are not nearly as good as 24 inch box trees in my opinion but that's Again, that's not really my call the bigger trees look better to start with they just they don't excel As well in my experience
Why are you replacing all oak with oak if indeed that kind of tree ever gets a disease or pest?
No. So personal opinion aside, the ordinance calls for like species of protected trees. The Coast Live Oak is the most Obvious tree and Ojai. It's 95% of the Oaks probably They're tough trees. They're good trees. I personally believe in replacing them with themselves I think Marma spoke briefly and she called them coast live or Coast Valley Oaks It's actually coast live oaks are what we're talking about which is Quercus agrofolia Valley oak is the other species that we have here and that's not involved in Although we could plant valley oaks, I guess. And some of those maybe here and there.
But again, not my call really.
You're good? OK. It's really hard for a layperson to see all those oaks so close together and wonder if they're growing into each other. And will these new ones increase that impact?
Okay, a Couple of things first of all the new oaks are being planted or not being planted in any crowded situation There's
the one on the south Is that southwest corner On the left the front left corner close to oh Yeah
yeah
It looks like it's being planted right in the middle of that grove.
It's a little bit near the other trees, and I didn't have anything to do with this but I don't particularly object to that but I do see your point as far as the crowding on the west side of the property where some of those trees are being removed That's the way they grow in nature. They all started out as acorns and they fight it out So that's a natural woodland right there. It's Normal over the years some of those trees will Thrive and some will not thrive and some may end up dying ultimately, it's just competition this normal It's very good habitat For whatever that's worth.
Mm-hmm Okay Any more questions OK. So it's our job to look at one, two and three and tell them what we approve?
Is that correct? Tell them what actually you're making a recommendation. Yes. You're going to look at one, two and three and make a recommendation to the director who will then process the tree permit and zone clearance application.
Yeah. OK, we're going to open the public hearing and I have a card from Leonard Claff.
1:44 – 1:4917 turns
I'm sorry it's a discussion item not a public hearing.
Discussion item, sorry. Discuss OA,
Leonard. Whatever it is. Leonard Klaif, K-L-A-I-F. I live in the city of Ojai. I am... I was confused when I looked at the proposal and the report and I'm a little bit even more confused now. My concern is on page three of nine of attachment A section two community development department conditions Two, and then the III. As I read III it says that in the future the commission or the director or the planning commission will decide whether to impose in lieu of fines in the event that there are not replacements So, and it's not clear to me that the replacements that are proposed are actually part of the plan that you are requiring as a condition of your approval.
If you are in fact requiring that there be nine replacement trees Then I guess it's fine, but I would ask that you make—that you decide. The concern is that in lieu of a fine can be waived which means that maybe they'll pay in the future and maybe they won't. And maybe it will be a public hearing at the Planning Commission or maybe it will be at the desk decision by the director.
That can't be. That negates the entire strength of the tree ordinance. So you either have, I would suggest you make sure that those specific trees in a specific locations are part of the approval and that you decide on a fine or at least that there will be a fine If those pleat trees are not replaced because otherwise it's worthless. Thank you It just is very confusing the way it's written
Thank You staff, would you care to address Lenny's? confusion and our confusion
So The third one, III states that if the site, I think this is the one we're talking about. Yes. If the site cannot accommodate the number of replacement trees, the dollar value of the replacement trees may be paid as an in-lieu fee to the city's tree fund so at the discretion... I'm not
sure of my concern. You stop reading that. At the discretion So what I wanted to highlight
is
that it does say may not shall so yes, it is
at the discretion and what is Recommended though and what is being requested? Is that the Commission make a recommendation to the director that will be clear. And so whether it's a fee or a number of trees or or both That direction is clear and yes That may does exist But that doesn't mean that the direction won't be clear when we leave here this evening to the director
Thank you.
And is that clear? Yes. OK, thank you.
Since the site can accommodate that number of trees, I think this number iii is irrelevant, right? OK.
Yes, yes, that's correct.
Will you remind me, does the tree replacement... Does the ordinance talk about tree replacement having multiple trees? Like if there was one tree being removed you would have to replace with three or something like that. Is there anything like that in our ordinance and I think there's something like that in the county. So no
this is it right here
okay yeah
There have been occasions where you see conditions of approval that lean into that as a part of a discretionary review. So, that has been conditioned in previous projects just not something that's earmarked within the current ordinance.
1:49 – 1:5438 turns
Okay.
Next
person?
Yes. The next card I have is from Larry Steingold.
Larry Steingold, resident. Lenny stole my what he said the same thing. I read this and I'm going if a site cannot accommodate the number of replacement trees required, the dollar value of those replacement trees may be paid as an in lieu fee. Right? No problem. at the discretion of the director of planning. So I read that as saying, it can only hold four trees. We're only gonna... We don't have to force them to have six and we can waive the fee everything so we can sort of take this and make it disappear.
But in my way, I'm thinking if there's 34 inches of the boxes why not just make them produce 125 inches of new trees? And he can plant them all over the city instead of cash because now we have more small trees
Have you seen that property?
Oh, yeah. No no not but if we place it there the idea is replacing
in the
city Then it
goes back to instead of the small trees.
You're talking
about money in in lube
Well, I think if nine trees are thirty or eight thousand small boxes then We get 121 inches for 36,000 and here we have more trees than that can be replaced. I mean, that's the way I read it. You can do... Maybe I'm wrong, I'm sure but it just seems to me that it would be easier for them or for us. They're taking down nine crowded trees, heavy trees, that's fine and they can replace them with money which nobody wants to do. We want more trees so if it's inches then just replace 120 something inches worth of young trees
The money goes to the tree fund, correct?
It goes to the tree fund and that
buys small trees. But enough money to generate 125 inches to replace the trees. That's what I'm saying.
That's what they calculated.
Okay, because I thought it was 34 inches?
No, then he calculated that there's 43 boxes would make up the remaining dimension of tree diameter and that accounts for the $8800 which would then purchase 43 24 inch- All right, because this was very unclear.
Do we have a tree replacement plan in the city exactly where we want to plant trees?
Yes. Well, by neighborhood.
It is by neighborhood and then there are specific trees within those neighborhoods through the community forest management plan. Yes, but in terms of the number size Those are all kind of at the discretion Within the boundaries of the Community Forest Management Plan that the Public Works Department Is guided through right so those? The the approved tree types to be replaced and then obviously it's also got the truth the trees I'm being cut off I'm done talking So, it's it's an interesting way of looking at it because you do have specific types of trees for each of the kind of carved out neighborhood areas so
Yeah, so I guess my concern or my hope is that the tree fund doesn't just sit there forever and no trees being planted anywhere. So it would be nice to have a proactive like okay we got 9000 coming in where can we plant trees? Like we're going to plant trees.
Yeah, and I just checked in on the balance of that tree fund. And we're about $33,000. Yeah,
what is it sitting there for? We could have trees in the ground.
It can be used for that very purpose,
yeah. What does it cost to install the trees though? That's part of the thing too. I was thinking buying a wholesale tree as one but I would guess it'd be more than 200 bucks to plant a tree of that size.
I know that the arborist has spoken about that in other meetings. Do you have a dollar amount for installation?
It's like three or four times. And does the
public works, does that come out of this tree fund to pay Public Works for the time?
A couple of questions. The amount to install a tree on
the property? So, the typical value to actually deliver and plant the tree is equal to about the cost of the tree if it's in a difficult location that's really hard to get to or if it's a very large tree that takes a crane then it might be three times the cost of the tree but in this situation It would be about, it would double the number basically. Okay,
because I think in a replacement plan it's going to be accessible to the front of the property or in the front part of the property so it should be accessible.
But it's not?
No no no, if this money was to be used for planning in the rest of the city. So it'd be about twice that amount.
Can I go now?
Thank you.
Don't leave the building
1:54 – 2:0012 turns
You had asked the money, I don't remember which Commissioner had asked about the But you know a public works cost that's already covered through the general fund What we're looking at here is $1 amount to purchase the trees purchase, correct
Okay It is additional work. I mean, you have people, but it might be, I don't know. You've got enough to do, I think already.
Yep. Covered under a different bucket.
OK.
Chair, are there any other comments? Is there
anyone online before we close? Two more cards came in. Is this a new one?
That's a new one.
Here we go. Okay, Alan?
Thanks for having me speak again on the matters at hand. So I just have two comments or concerns. One is the dirt and the roots that are adjacent with the oak trees or the evasive trees sometimes people say they're going to remove a tree and place it somewhere else The roots are still showing, and there's a lot of removal of dirt that could be a potential problem. And then also the endangerment of animals and the removal of insects and evasive creatures that are next to the oak trees. Thank you for letting me speak.
Thank you. Michael Inabi? What is it? Inaba.
Yes, ma'am. My name is Michael Inaba. I'm a local resident and another arborist. And I wanted to ask questions about a follow-up on Ms. Ray Schmidt's question about the money. I think that's important. And also your question, Ms. Murphy, about the density of the trees. I think we're missing some really important points that add context and reason to this presentation.
The number of trees is not always advantageous. A whole bunch of flammable, sick dying trees is a fire hazard but if we have fewer healthier more maintained trees we actually have trees that resist fire so we have to take our mind off the you know more trees is better mentality and then when we look at mitigation if we have $33,000 in a fund What we're missing mostly in the valley is the education component because trees are planted but they're not cared for. And we end up with trees that can lose value or stall, I can point out several on Grand Avenue that were planted over 15 years ago. And they still look like they could fit in a 36-inch box.
They've gone nowhere. And so the benefits we think of when we're considering planting trees, those can be lost—the whole effort, all of the theater buying, moving, planting, disposing of the waste. That can be nothing. It can be lost because we're not thinking, what is this tree for? Where is it going? And so when we look at a development proposal like this, it's really important to look at the site and what it can tolerate, what the irrigation is going to mean for the growth of those trees.
Because if it is an oak woodland, it cannot be irrigated. If it's an oak woodland and you impose irrigation even upslope You're going to create overgrowth and as the arborist described, you'll have natural attrition. And I wanted to point out one of our other... We have several double standards in our reality as arborists. One is that natural oak woodlands are fine and if we apply that mentality to wild dogs well Wild packs of dogs roaming the street are fine, right? We know that that's not the case.
We know that dogs in a pack have to survive its survival of the fittest and when we put our landscape trees you know when we take an oak woodland and we impose the residential standards human safety fire safety all of that We end up in a situation where we're telling the trees, just fight it out. And if you fall on the house bad on you will clean it up and then that creates a cognitive dissonance where we're like wait a minute You can't have a tree fall on people. You can't have a tree fall on cars But we're actually asking for that If we're not willing to recognize that when we have trees May I go on a little bit more? Okay When we have trees on a residential site, we want to manage the tree density. We want to manage the tree balance. We want to manage health, growth, longevity because when we manage that kind of performance, we get a longer lifespan for the tree.
We get a better return on investment for our money and we end up with better trees that are actually safer for the property. That's what I wanted to say.
Thank you. Thank you Michael. Is there anyone else? Anyone in the audience wishing to speak to this? Oh, here we go. Another one. Catherine?
2:00 – 2:0620 turns
I'm not very good at this, but I just think it's a disservice to the community to replace the trees for a lot of the reasons that the last arbitrist just mentioned and to allow And the reasoning behind it, because the people who bought the house don't like the position of the trees is not a valid reason. And even the architect said I think this whole decision is way immature because he said probably most of the trees the fire department would take down anyway. Why don't we get a report of that and find out if that is true?
So I just wanted to say that.
Thank you, Catherine. Is there anyone online, Sherry?
Teal is online but she does not have her hand raised.
Could we invite her to raise her hand? Maybe you can tell her how to do that, Sherry. Teal, you're back.
Thank you, Commissioner Murphy. I am online and I did not raise my hand. I do not wish to speak but since your offering, I will say Ojai's Tree Ordinance is there for a reason. Please follow it. I really appreciate Commissioner Schmitz Math, because the way that I see it, 40 inches is well, I'm just rounding way off. But to me it looks like a third of the inches of trees are being replaced and a tenth of the financial is being put in. The math to me does not make sense and Ms. Schmitz First comments, I'm still wondering. But because you all know exactly what you're doing in this natural world of oaks, I thank you for letting me speak.
Thank you, Teal. We will close the discussion and bring it back to the commission. It does feel to me like We're just sort of finding some places to stick some trees on a lot that already has big, beautiful mature trees. Don't know if that's our decision though.
You mean you'd rather see all of it go to a fund? Yes. That fits for the...
Or at least more than what's here. Putting a tree into that woodland area, there are a couple of them there that just doesn't make a lot of sense to me. So I guess-
There are some placements just to fit the nine trees on this site?
I think that's what they're doing.
I was thinking of the landscape architect, dispersing around the perimeter. Many of them seem to be in a good location to kind of enhance the property around the perimeter.
Some of them do?
Yeah, several. There are two of them that are part of that adding...
When these two up here mature they're going to be very close together.
I can respond on Kaylee's behalf. We had many discussions together, and she's got like almost as much grizzled experience that I have and she was very careful to place things and she sized them appropriately understanding that she didn't want to just stuff something in there that wasn't going to be healthy in the long term so she did take a lot of care in her positioning. Thank you.
Thank
You Brett I guess I'm okay with the nine trees where they're planted. They have no problem with that. I guess my My hiccup is the mitigation fee Yeah So the nine is fine for planting and I think it's great that he's going With at least some 24-inch box because those are the two inch trees. I am understanding
Yeah,
yeah So there's also a 36-inch box and 48. Yeah, so I mean those are going to be four. That's fine but I'd like to see more 24 inch boxes. But I guess my issue is just the mitigation fee itself.
Is there a possibility to reduce the number of trees that are being planted? Increase the amount of fees in lieu. Is there a Combination their Compromise
well if we read the code it Again, I is that they be replaced with suitable size and type. And then double I is that the number type and size shall be either the equivalent to the appraised value or the total sum of the diameter of the trunks to be replaced. So there's a shall there as to that it's either now can it be a combination of those two? I'm going to interpret that as yes.
But there is a total there, ultimately.
2:06 – 2:2032 turns
What does the code say about... Does the code just say that as long as the mitigation proposal utilizes I forget the acronym. The Tree Association, whatever the ISA standards to calculate- It does
say the
ISA standards. Yeah. And so what we know is there's several ways to come to different numbers with the ISA.
It does state the ISA standards.
ISA standards, so whatever is... I mean there's two ways to go about it. We can say this should be... You could do another calculation I think which is what Teal was asking and what Katrina was asking going from 100 and... Whatever it was 119 thousand to 8000 Is using two different maths, right? Like at 119,000 you're using one math. You're using a math that's about the diameter of the existing tree canopies and how that relates to an equation related to that. And then you're equating how much to pay based on the new trees.
Exactly.
So it seems like maybe something... Sherry. Thank you Teal for your comments. So I think that this is this is probably the crux and I guess we'll get to continue talking about this maybe but So the question is there, I think the question for us is do we feel this is a Well, I don't know what's within the rights of this body in the sense of like well, this is one way that is accurate according to the ISA. There could be some other which I think Jan was probably right would be sort of oppressive to whatever it'd be like 60,000 or whatever it would be to kind of make this work with the other form of calculation But, you know, Commissioner Rice-Smith is like well this also seems kind of like inadequate if we think about what it means to plant the tree and why is there $36,000 sitting there?
You know how long has it been sitting there. I mean not that these are exactly our things, you know. Yeah
a lot to take in. This body doesn't necessarily always review these so this is kind of a special circumstance and you're being kind of edumacated to a certain degree and learning how some of these standards and we'll be talking about this as well yeah in some more depth as the next item comes forward Might I offer a suggestion here? You have the opportunity to provide a recommendation. You could lean into more weight being placed on the dollar value as it's identified here, recognizing that the 119 and shaving that down to 8000 is bad math and having and working with the applicant to come up with a number that is much closer Or a combination of the two because it does, the provisions within the ordinance identify kind of replacement and or dollar value.
So you could look at both of those in sizing that up. You could certainly provide that recommendation to go back and have that conversation. I
think it'd be nice
to know what it
actually costs to plant one of these.
So if he's saying it's double for say a 24-inch box, right? For me that would be easy enough. I mean we have an arborist that said it costs about the value of the tree for a 24 inch box then take his $8,815 which is the actual cost to buy the actual trees and then double that figure for the cost You know physical planting of the tree. I'm okay with that
Sounds good to me
What does that number look like so if we double let's just do some fun math here seventeen
thousand six hundred thirty
Yeah, so it comes out to be about 17 and change right? Oh
I think that might be less than the sanitary sewer hookup fee.
Per unit, yeah.
Just to let the commission know someone from the audience that was speaking earlier who happens to be an arborist said he wants to speak again. What? Michael Inaba, arborist is in the audience and he'd like to come forward again.
Please come. If you can help us get to an answer, we would appreciate
it. I want to give you some ammunition, some tools for the tool chest. So what we're talking about, Vice Chair Chesley, is two different numbers. The 100 and 117? 119 119 hundred nineteen thousand that's an appraised value. That's calculated by a number of Calculations we use in the secret business of arboriculture, right? The other number you have is eighty eight hundred and Yep. OK, the 8800 figure that is a nursery cost installed as I believe?
No just the box.
That's just the trees all right so let's break this down there's a few different things first planting planting a 24 inch box is a one-man job sometimes two if they're not real strong right A guy can dig that hole. A guy can move a 24-inch box, you just tip it on its side and walk it over. So that's one guy. If you go up to a 36, that's the biggest manpower alone can plant. Now you've got to dig a cubic yard of soil minimum out. You create a pile of dirt that big.
And that has to go somewhere. You're taking away functional ecology, shipping it off as trash, right? So that is more than the cost of a 36-inch box. When you get to a 48, you need a skip loader to move it or a little bobcat, something that will pick it up, restrain it and haul it to a site. Two guys cannot move that even on its corners. Right, so that requires a backhoe generally because you're moving cubic yards down to a depth of greater than 48 inches. Well no it depends on the soil
How big is a tree in a 48 inch box, I mean
diameter mm-hmm Three and a half four inches. Maybe three and a half It depends on the nursery stock and the species
Okay, so you're saying that that would be More than double it'd be very expensive
right? So when the bigger box sizes they go up astronomically Depending on location because they have to be delivered to a job site on a flatbed if they can be moved from the street typically To the planting site, then it's not really a big deal. Normally with a jobsite You've got a skip loader on hand you've got equipment If you're talking about taking a big box and putting it over a house, cranes are several thousand a day.
Right? Because you have to have a crane positioned in the road. You have to get public works to say yes, you can close the road. Lift this thing up over the house and drop it into the backyard somewhere. So you haven't even put it at the planting site necessarily yet, and you've already spent thousands.
As I understand it, the smaller the tree, the better the chance that it will survive. What is the comparison of the 48-inch box compared to a 24 in terms of survivability?
Well, there's a term... I'm going to go... Okay. I'm not on the time limit right here? No. Okay. If we go back to England because English are considered the world's best horticulturists according to The English but they're world class. Now if we go to England they say it's a year for every trunk inch. If you planted 24 which is an inch and a half or two, 2 years' time to establish that tree If we go into a 48 inch box, three and a half inches maybe you're talking three four or five years to establish that tree. A lot of it depends on the site soils irrigation early maintenance all of those things make a big difference right? And so one of the nursery Aphorisms or sayings that we had was that in the right spot, a 15 cannot grow 36.
A 15-gallon pot which is a 17 inch plastic bucket, five foot tall when you buy it maybe can outgrow a 36 inch box by year three. If everything's done well. And so that's the real trade off with the larger box size, you're paying more for the size at planting but it actually takes longer to get its feet and takes longer to produce that big canopy.
What do you have to do watering wise to make this new plant survive? Without an irrigation system and I'm again looking at that Grove. You cannot put in an irrigation system Because you would endanger the existing trees so How would you go about getting those two trees in the grove to live?
You're asking excellent questions So the big concern, you know from an arborist nurseryman is If you install a foreign tree into that ecology, you're going to need to irrigate it. So the trees that are already there are already established. Their root networks are already established. They're basically looking at the newcomer like what kind of lunch did you bring?
And they're gonna take that lunch. Competition. Right? And so that's what you have to think about when you've got an established grove and you're going to stick a newcomer in it. Do we have a class counselor that's going to make sure they play well together? I don't think so. So there's a lot to unpack there, but it can be done. The question is should it be done?
And that's where we come back to the number of trees on the site. Does it make sense? One of the other tools I wanted to put in your tool chest is that there are two different trees available in a 24-inch box, more than that. But in this case, there's a single trunk street tree that we're all familiar with. We drive around, we see six feet of trunk and a branch and canopy on top of that. There's a reason for that. The nurseries grow that for line of sight so vehicles passing can see around the corner, right? That's the way we do public space trees in natural groves We want natural forum trees which are a little bit harder to find in the nursery business but they're available and you can get them from 24s all the way up even 15 sometimes Doesn't really matter.
You can make a 15 and natural but once you get into the bigger sizes, it's really hard So you want to start off with a natural forum tree that hasn't been stripped of all its lower limbs And the big reason is in a landscape where you don't need that six feet of vertical trunk You have to protect that six feet of vertical trunk from sunburn for several years. Most homeowners don't like the look of that, and if they don't do it then that tree gets handicapped. The way the public works trees, they had little red leaf plums out there for 15 years. They were sunburnt from their first year and they never went anywhere. And it's like well they're sunburnt you know? Stick them in the ground, kick them real hard and walk away.
So we really want to make sure that the Planning Commission thinks about are we putting in a natural forum tree for a natural environment or are we putting in a lollipop that really belongs on the street? And that's something that you can ask the landscape architect to specify and you should think about that for the use of the tree because a low branch tree can be much more versatile in a home landscape where you don't have to have that six feet of trunk that is so vulnerable to all those other problems.
Okay?
Thank you, that was very informative
2:20 – 2:2631 turns
Sure. Is there something in the conditions of approval? I didn't see it, but to guarantee that those trees live for a certain amount of time and if they do die within a certain period of time they would have to be replaced. So we didn't
provide you with conditions of approval because you're making a recommendation to the director so you can make recommendations for conditions Katrina,
are you talking about the existing trees that are protected? Or are you referring to the new trees coming in?
I did put a resolution here.
Yeah there is.
So you can add that as an additional condition. I think that would be helpful considering.
Yeah, I know we've done that in the past.
Conditioned anything regarding the exist the protection of the existing trees if they take a beating I Mean there were a lot of Things that the contractor is going to have to study and perform.
Yeah, there's the yeah the mitigation Pieces that are attached to the tree report you know the existing tree ordinance has requirements for replacement Now, what's interesting is if there's an argument to be made. If the tree dies, is it dying because of the construction that took place three years after the fact? And suddenly that becomes an issue for staff to evaluate through a tree report. I mean those are kind of some interesting scenarios. It's hard to tell. I'm not an arborist. I do not consider myself to be professional here.
By any stretch of the imagination so instead I weigh heavily on what we get from the arborist reports that come out So if there's mitigation that addresses that then I think absolutely we should be including that As a part of the conditions, if not, we should be asking the question of what that looks like into the future.
I Have another question for mr. Ettinger On the landscape plan Does the landscape architect? specify like what are the specifications on the tree apart from the size of the box,
oh you mean in terms of the shape whether it's an upright a street tree or
Well, whether it's a multi stem or you know like specimen or what's the kind of is there are there specifications on that? I
guess within the actual species that she specified the coast live oak No But she does take it into consideration and visit all the nurseries.
Yeah
look at form and structure and
sure
We won't put in street trees Recommendations was awesome.
Yeah
Does this plan say where the 24-inch, 36-inch or 48-inch boxes are? I believe it does.
The numbers are highlighted in yellow? I see that. It's hard to see. I can't
read that. She basically placed the bigger ones in the open spaces, mostly in the front. OK.
She didn't want to bring in a crane.
Yeah, crane would be pretty expensive. And the arborist report does have a very specific and concise tree protection plan, too. You know what we normally do on our sites because you know not all subcontractors pay attention to those fences they get knocked down as we actually print out little plastic signs and paste them all over the place that you know you have to stay outside these tree protection zones and thou shall not move them etc so usually add those signs to our sites
Thank you. It is kind of interesting, we have a Conditions of Approval Compliance Officer now so that person would be charged with reviewing those conditions and going on site to ensure compliance.
Does anyone have a thought in terms of what you would like to move? Well, yes. We would be moving to recommend. Yes?
Making a recommendation to the director and Thank you, Commissioner, regarding the resolution. So it's a resolution that's making a recommendation to the Community Development Director to approve the tree permit and the zone clearance application as submitted.
Where is this?
So I'm looking at attachment A1 of 9, and that's the top statement on the top of the resolution.
Thank
you.
I think we can make, well, I could try to make a motion. Motion to adopt the Planning Commissioner Resolution number 26 with the proposed amendments to it. Increasing the mitigation fee to double what is proposed in the medication plan and Requiring a replacement plan for the trees that are to be planted if they fail within five years
2:26 – 2:3417 turns
Would you accept a friendly amendment
Yeah,
I would like to remove the two trees that are planted in the existing Grove
My only concern with that is as not landscape architects were arborists. I don't really know if we should make that I
think we're here Well, I'm basing my suggestion on the arborist's Advice one of the arborists advice
It is not a project arborist but he is a licensed ISA certified arborist and
Would you accept that friendly amendment?
And that's, I mean what's the goal? Because I guess we're kind of saying that we need a replacement plant anyways. So if those trees didn't succeed they would have to be...
But they could endanger the entire grove because you're going to have to water them for several years and that water is going to be used by the existing trees which is detrimental to their survivability.
Yeah
Well, from my own experience I've planted a tree very close to an existing tree and it's thriving. The existing oak is fine. It's in my front yard you can all look at it. It on the street. I don't know. I wouldn't want to take out any trees that they're willing to plant. Michael?
Thank you. So this is really something to discuss in the planning, you know, counter between planner and applicant. One of the things that I've come up with in my broader work throughout the county is when we're planting a nursery tree into an existing native oak woodland. We have to consider what the goals are and the requirement of planting a new tree means you're taking a tree from a nursery, probably in Fillmore, and bringing it up into Ojai Valley where it may or may not have seen 105 degrees.
It may not be ready for up here. Its genetics may not even be from an inland location population of coastal oak. Most of the coastal oaks are from much milder climates than Ojai. In fact, we're toeing the line of what it can tolerate. Most of you were here in What was it 2018 and 2020 where we reached 118 degrees? 2018 120 plus degrees in 2020 and we saw oaks brown out they completely scorched on the outside They're not set up for that temperature. It didn't evolve for that They may have never seen before in their lives Going back possibly hundreds of years. So we have to look at what the goals are of putting a foreign tree into this, and it's not just about stealing a kid's lunch like I mentioned before.
We have to take a cubic yard, a functional ecosystem, the rhizosphere Out, we throw it away as trash. We bring in typically heavy equipment and we dig out all of that material and we stick in something foreign, something from a nursery, something that may have grown up with a chemical agenda of you know, we have to fight Phytophthora. Well guess where the most phyto, guess where the most chemical resistant Phytophthora exist?
It's just like hospitals they live in the nurseries and so when we bring in a nursery tree, we may inadvertently import Diseases that can affect The local trees and this is something that we have to put on the scale when we're thinking about does this meet our goals? And That's why I think this. This is an important discussion between planners and applicants and But it's really important that all of us understand these kind of ecological fundamentals of if this is what we want to do, let's make sure we're taking two steps forward and not three steps back.
Okay? There is a big impact when you import trees. They don't always work in the given setting. What I brought up before about standards versus naturals, that's kind of a visual like slappy-in-the-face kind of thing. But there are other reasons why nursery trees have a hard time getting established in an oak woodland. And so because of fire safety, because of insurance, because of budgeting, because of maintenance costs, we want to think about all of this so that we are ending up with a better situation than we started with.
Chair?
Yes. Can I ask a clarifying question? Yes. On... So, Michael if you could just... Yeah. There's two points that are being included as a part of their motion now they're discussing at this point. One of them is a 5E replacement for Coast Live Oaks. Is that in your experience, does that seem like an appropriate timeline
For a 36 inch or larger, yes. For a 24 or three year period is fine. Okay. You'll be able to evaluate it three years if a 24 has stalled or if it's established. Failure to establish with the 24 is typically in the first 12 months. 36s and 48s are much more complicated, they can take a long time before they show their problems. You might remember as planning commissioners looking at the planting next door to Oh, gosh. What was the old French restaurant on Ojai Avenue?
No? On Ojai Avenue.
Suzanne's?
Suzanne's. So right next door to Suzanne's somebody installed a nice 36-inch box oak tree but they didn't water it when they put it in so it just went... And I was like, oh boy, that's going to be a failure to establish. Somebody caught it in time and turned it around and now it's all right. But that kind of thing happens a lot, right? You've got a landscape architect who says here's the design, an installer who says go plant this, and then the guy who goes to plant it says you didn't say water it.
So it's really you want to have this continuity, everything from the planning commissioners and planners to the applicant down the chain even to the maintenance to make sure that things go well. Everybody has got a job to do, right? So that's really what I wanted to mention. I wanted to back up a little bit on the monetary figure because When we talk about the value of those box trees from the nursery, a 24-inch box is $205,000 as Mr. Scow mentioned. A 36-inch box is $350,000, $375,000. $480,000 gets you know 700 something right?
I don't think that all adds up to $8,000 but I haven't done the math so you guys can punch through that and see if that is an installed cost or a purchase from the nursery cost Usually the arborist will put an installed cost Because that installed cost can be deducted From the the appraised value.
He figured out that there's 94 inches remaining they needed to write and then if you divide that by The 2.2 diameter which he's assuming in the 24 inch box Then that equals 43 boxes and that 43 times the 205 is the 8,000 no, no
2:34 – 2:4242 turns
That doesn't work out. But I'm happy to run through that math with you when we're off camera and private time. Well, it's
important... What's your thought? Because that's what we're working on
the problem tonight.
Right.
Microphone.
Right. And this is one of the things I wanted to speak to, that there's so much confusion about trees and arboriculture. So you have the 8800 figure. That's nursery growing trees coming up. You have 119K going out. And you have a gap of what is it? $110,000, $111,000. So that $111,000 is the value that's at most owed to the city in trees or in lieu payment. Right?
They're also planting the nine so we have to
we've already just we've already deducted that We've already deducted that. So we're down from the 119 to 111 Right one 110 so a hundred and ten thousand dollars That hundred and ten thousand dollars has to be dealt with somehow And that's really up to you guys
I would like to see the director.
I think it's even more complicated because that number that we're talking about is 8,000. That's only for the replacement of the remaining diameters.
No, no, no. That 8800 is the cost of taking the nursery trees and putting them into the property.
No, it's the 94 inches. So we've got inches and we've got the appraised value, right? I mean if you just go straight inches. So we have 125 existing inches.
I'm going to have to review this and I'll get back to you because I didn't read it that way. And it sounds to me like things got
switched up. But that's what he
told us. That's what
I wanted to
clarify.
I
think it was
just a confusion.
Because he's saying that there was $119,000 of the appraised value of the trees
to be removed?
Right. And that equates to 125.4 inches.
Okay, so Yeah, we have to there's a lot to unpack there because when we talk about replacement trees diameter two Square inches surface area Those that's that's a curve. It's not a straight line So the bigger you go in diameter You go up several times that
in value
3.14 times that in square inches of trunk surface area, and the square inches of trunk surface area are the metric we use for the appraisals. So that's where
it's
linked.
Yeah, that makes sense because that's why the deviation is huge. Exactly. But I think that's why it was a little confusing because He was saying this equation, the way it's written in this proposal is that what's being replaced is 31.1 inches of diameter, right? And so that 31.1 is then minused from the 124 that theoretically is being removed from the site and then the remaining 94 is being- Now we're talking diameter inches. Just diameter of inches, yeah. And that's how they came to this amount, which is the amount owed based on the remaining amount of diameter of inches that hasn't been accounted for. None of that takes into consideration the surface area, which is clearly why the deviation is $100,000. Well
and this goes back to the ordinance, which I love the idea of fixing it but I think it needs to be fixed the right way. Right. So when we talk about the cost of an inch, they say $100 per trunk inch. Well that only works at the low end because when you go to a 48, you're $700 and 3 1⁄2 inches. So now you're at $200 an inch, right? And it just goes up from there if you have a 10-foot box. You're going to be paying CHP fees on top of the nursery cost with a crane to install it. It's just astronomical but still that's part of our trade so you have to recognize that When you take all of these trees that are being removed and you just add up the diameters, you're not compensating for what's actually being removed from the site. Sure. You're taking one-third that value because the surface area of functional tree that's trapping carbon and all that is 3.14 times that.
Yeah. And that's inevitable. I mean we can't replace what's there.
We don't want to.
And you don't want to, necessarily. The options are hardball when it comes back to planners. It's either you reconfigure the property, the home, to save the trees or take the trees out and that's... We have to find ways to reasonably develop properties. That is a property owner's right, but we also have to find ways to identify where habitat exists to protect as much of the natural character of Ojai as we can, right?
And this is where we come into one of the other, I mentioned double standards. We love oak woodlands but we hate when trees fall on things. Well, oak woodlands fall apart all the time. They're under survival of the fittest. When we move in, now they've got a job. So those trees are now—we give them room and board. They have a job. We want shade. We want beauty. We want wildlife. We don't want surprises. No fighting, no biting.
And so we prune them. We fertilize them. We irrigate them. And we treat pests when we need to. We cable them if the branches are a little bit wonky because the previous owner didn't bother. And so there's a lot of our input that extends the longevity of what was once a wild tree, basically domesticating it. We get better longevity, better performance, more affordable cost to care.
It's a win-win.
Thank you. Chair? Yes. You have a motion on the table? All right.
May
I? Thank you, Michael.
We have a friendly amendment that has or has not been accepted yet.
That's true. Repeat the friendly amendment again? To remove
the two Oak trees, replacement trees from the woodland area.
On that western edge? Does that mean like put them somewhere else on the site?
I don't think there is anywhere else to go. I suspect that this was... Let's find a place to put nine trees. I don't know that we need to put nine trees in. I think that if we put in whatever the owner reasonably feels It's a friendly amendment. Is there a second? One more thing? Quick, very quickly.
This gentleman is not our project arbiter
2:42 – 2:4925 turns
I understand.
Half
an hour of time, he's very enlightened. I'm learning a lot from him but this doesn't seem like the process to me. I can speak to this man
directly. OK. Yeah. But elsewhere please? There is no second that Friendly fails. We are back to the original motion there is not yet a second on it.
I second
it. Any further discussion?
OK.
Roll call, please.
Hanson? Yes. Murphy?
No.
Chesley?
Yes.
Reischmick? Yes All
right. You have it.
Thank you.
That was painful.
I would call that enlightening. Yeah.
I don't
think it
was painful. We learned a lot.
And educational. Now we can continue it,
right?
Since we're here, why don't we continue the conversation?
Moving on to item 4, and I don't believe we have any cards for item 4. Is there anyone in the audience wishing to speak to 4? Anyone in line? No. OK, then we are going to go to the staff for your report.
Thank you. Again, Lucas Seibert, Community Development Director here for the city of Ojai. That's for you as well as the people in the audience and TV land. So what you have tonight for discussion is a, well it's usually kind of proposed modifications to the existing tree ordinance. Let me just give you a little bit of background information in terms of why this is before this body for comment before it goes to City Council for discussion. As a concept review, this is really kind of a concept review if you will. If you look at the way in which the attachment is worded it's not in an ordinance format instead it's got some red lines attached to it as the ordinance currently exists but in addition to that it has comments on the side to kind of provide some clarification.
this Tree ordinance itself was originally brought forward as a concept review consideration Before the City Council in February of this year at that meeting before City Council. There was a lot of conversation around Whether or not the revisions that were being discussed where had gone too far So and the community certainly was wrestling with a lot of the ideas that were brought forward so there were There was an opportunity to go back to the drawing board and basically from that came two workshops.
In this packet of information are kind of a summary of what came out of those workshops, right? So you've got that information empowered with the staff report, empowered with the concept review ordinance revisions that you're seeing before you. What's interesting about that in its... The community input that we received before both of those workshops, I was obviously there.
I don't remember if I saw any of you there but regardless the information that you see here is meant to help inform the conversation for tonight. We're not necessarily looking for a specific action but we would like to hear your comments And like what we did for instance with Historic Preservation Commission, we'll take those comments and then individualize those as we move forward before City Council in the future.
For the workshops, I should break it down into this. The first workshop was kind of an interesting intro to the conversation when we brought in a panel of experts. Those experts were biologists, licensed arborists and then we had somebody from Edison that was an expert as it relates to the processing of the tree Trimming I guess we could call that as it relates to Edison and the safety measures that they're looking at and they're Operating at a different level more at a federal level as it relates to how they do the trimmings So from that meeting, we learned a lot one of the interesting things that that was learned and and in going back and looking at the kind of the summary is there was consensus that of an interest in adding a tree to the tree protection.
That's why you see the black walnut included. It's an interesting version because it has started popping up on some of our projects recently, and it has kind of a bat habitat, obviously for certain types of birds as well. But the bat habitat is an interesting one because that was covered in a recent bio report that identified black walnuts as being certainly habitat. So you've got to be careful and considering any sort of removal those trees so That has been added as a potential tree as an additional tree for preservation there's type of tree in this area has dwindled over the years, so there's a potential for bringing that back as a protected tree. So that's one thing that came out of it. Another interesting piece that came out of it was an interest in looking at some sort of shared cost and kind of leaning into that.
I don't necessarily have that in the report here. It was certainly discussed Certainly more in the second workshop than it was in the first. The first, it was kind of generally discussed but when we went through kind of the code and provisions and standards that's really when we started hearing more of the understanding the roles and responsibilities from the city standpoint but then also understanding the roles and responsibilities as it relates to the community.
Both of those kind of coming together and recognizing a shared interest in cost. So if we're continuing to move the needle towards additional trees for preservation, and what those pieces look like, recognizing that that cost potentially goes up for those homeowners, and then recognizing that there's potential for shared costs. With that, I'll stop and engage the conversation here. If you have any questions, comments, certainly all ears we can start talking through pieces that you're seeing as potential revisions, maybe questions about what items haven't been changed or modified at this point.
2:49 – 2:5837 turns
Thank you, Luke. I had a question just about what are considered mature trees? It's in there a lot but I didn't see it in the glossary.
Yeah, I think there's a definition for mature tree and... Yeah,
I just didn't see it in the glossary and I was looking around through it but...
Attachment A page 2 of 10.
Oh. Yeah.
It's at the bottom.
Oh OK.
Yeah my
computer ran out. There we go. Not changing that definition. The interesting thing also is there was a lot of conversation and chatter as it relates to, and you know, Code Compliance has seen this on the weekends where tree trimmers go out that are not certified and do tree trimmings that are inconsistent with the trees health and then potentially spiral it into the point of the tree basically declining and then potentially needing removed at some point. So there is opportunities in doing that research, I was trying to understand there's two different ways in which to handle that kind of conversation.
The first is to lean in on the ISA certification period and you're seeing that within the definitions that are identified here ISA has a number of certified professionals. So there's ISA Certified Arborist Utility Specialists, ISA Certified Tree Climbers, ISA Certified Tree Worker with an Aerial Lift Specialist. Each one of those carry a certain amount of education and then renewed education so it's not just a matter of having it and then keeping it you've got to continue with that education into the future There was also an interest in both of the workshops that I heard of potentially creating Our own process, and it's been done in other communities where we provide the education that these community members or these members that are coming in that are doing the tree trimmings or tree removals or a combination of the two.
That they are and understand what our expectation is. And that could be something that is still added into this maybe as a policy and then covered generally within the ordinance itself. But it puts control into our hands whether that would be some sort of a certification, them signing something. There's a bunch of different ways in which that could evolve and develop so...
I just wanted to say I'm glad you put in black walnut because that comes up in CEQA. So if you have a a report done by biologists, they're going to identify the black walnut and it's going to be considered an impact if you take it from a CEQA standpoint. But then our code is silent on it so that it creates a conflict. So I like that you're putting it in so it's consistent.
Yeah, it's interesting. There was a project recently where there was a bio report that was put together and then that bio report talked about mitigation. And initially reading it, it spoke to the protected trees that we saw and then it brought up the black walnut and went into a pretty lengthy requirement. That's when I learned about the bat habitation, certainly for the black walnuts.
On page attachment D, page 85? It discusses how Community Development Department tracks the trees through the permits, what's being taken out, what's being added and reports to the Planning Commission annually. I don't remember this report.
Yeah, you're reading the second paragraph?
Yes, end of it. The
department shall start tracking newly planted trees of discretionary development projects and new construction projects. Like the Public Works Department, a community development department will track the trees per neighborhood as it relates to the target tree plantings per year. So we're learning something new as we go along here.
OK.
I bet Sherry has it. Sherry started it at one point, so I know a long time ago it was done. Yeah.
And at one point, we were tracking for Tree City USA a lot of different pieces and it got pretty in-depth. But yeah, if we are doing it, I'm not aware of it and it probably is something that needs to come before this body. And it's not
on a
GIS
map? And it's not on a GIS map
No, well, okay. So just so you know I'm aware of it now, so I'll be talking with staff about it
Is it Public Works who decides which neighborhood and specifically where in that neighborhood? to plant the new trees $33,000 is supposed to if it's in the public right-of-way Yes, absolutely Could we hear from Public Works how many trees they've planted in the last few years?
Well, annually, Public Works reports as a part of the Tree City USA. So yes, we track that specifically and that's reportable for us to continue to maintain
And the number of trees they plant depends on the amount of money they have?
Not necessarily, because they've already put into the budget the number of trees that they're anticipating.
Oh so it's limited by the Public Works budget to plant the trees?
Correct. So this fund could
just skyrocket if the Public Works budget doesn't...
Wait say that again?
We've got 33,000 sitting there. We're probably going to add several thousand more. If the Public Works Department is limited in their planting and how much they can spend planting trees That in-lieu fund is just going to continue to grow. I would like to see some accountability there, in terms of using the money in the fund to help them plant the trees or something. There must be some ways that this could...
That it could be tracked? Is what you're saying?
Well, accomplished and
tracked. So when this particular piece, the second paragraph that we just read out loud comes forward, we can certainly include an earmark as to what Public Works status is. I mean because they do this on the annual so we're aware of well, Public Works is aware of and tracks it on the annual as a part of our CityUSA certification maintenance.
OK, I guess we really can't tell them what to do. But I would like them to get the suggestion that they find a way to plant more trees.
Within the public right-of-way. So that the street tree inventory, that's what we're talking about? That's the reference? Correct. The City Works record of
all trees in the public right-of way? Correct And within parks and other public spaces? Yeah, public spaces
2:58 – 3:0846 turns
The public right away exists I think right underneath the utility wires We're suggesting that they plant in the very place that Is going to eventually require them to top the trees which is Again, not a healthy thing to do.
Now remember the trees aren't necessarily All going to be like for instance these are all based on neighborhoods streets have different varying types of trees not all of them are gonna be protected and What we're talking about, so just understand and I'm just realizing that I included the community forest management plan in here as well. Because it's equally as an important piece as the tree ordinance itself because this is a living and breathing document that does have tracking pieces in it and it is something that the public works department uses on the regular because it does identify the types of trees that are to be planted within the various neighborhoods In addition to that, there are trees that are recommended for planting and that was just recently revised in 2022 or updated I guess.
It also has trees that are hazardous trees that should not be planted. Right?
So you're saying that Public Works is likely planting shorter trees from the approved
list? I think they're being very careful. I think to what Michael Inaba had been speaking to, I think they're careful in considering the types of trees that they're planting, yes. Good.
And where?
Yep.
I wanted to clarify something too. The community forest management plan says trees planted in the public realm and the city-owned lands, so I think That this is also encouraging private property owners to plant trees that are on this list in there say their front yards anywhere where there's public view. So that's it like in the policy so it's an encouraging thing but it's it's a document that identifies neighborhood trees in the public right away, but also in the public realm and in the front yards
Public ROM would be, yeah, things that are visible from the public right of way. Yeah.
So we need a lot of education. I didn't know this existed before Friday.
You didn't attend the city council meeting in 2022 when it was revised significantly? I did
not. Didn't
know it was there. I was on the original committee to write this. I know they took it off when they revised it, but they kept the old council and the old Planning Commission But they didn't keep staff
your name. Your name is inside it isn't
it? Yeah
It's not on the cover
Okay, we will open the public communication
From what I just heard, Larry Steingolf. Are you saying that the city can tell me what... I understand flammable trees, invasive trees, I've got all that right? But essentially you can tell people what they can plant in their front yard.
No, you have a list from which to choose.
There's a list and you can pick one but if you wanna pick something else you can't.
Yeah, this is encourage private property
owners to
plant.
And tell you not to do the invasive stuff. I know, I got invasive, I got fired but when it says encourage it said the next step is we want to tell you and I just think that we should have some sort of stop there.
I would say encourages is the softest language that you can do without having the must or shall attached to it and certainly within a document like this. It's really meant to be a Guiding piece as opposed
to because we're going over the safety element and there's a lot of Now shalls. There's a lot more shall, shall, shall, shall which now requires more people to monitor, more employees, more this and there's so many more shalls it's like they should be more like really? I mean like more encouraging and I like encourage but somehow it's got to be stopped because I mean people are like there's too many Shiells.
Thank you Larry. Public hearing is now closed.
Let's see if there's anybody in the
online. Anyone online? No. OK, thank you. So you're looking for comments and no action, right?
Right. So the comments that I'm going to receive tonight, I'll take those in and then forward those off to city council.
Okay, do we have further questions or comments?
Well it just seems like maybe we have to address the monetary thing in some way. We're talking about the money piece? Yeah just because it's still I mean this is what we did tonight was directly out of here you know it's the mitigation on any of these Chapter 11. Yeah, where else? It is wherever it's brought up. It's the same. It's that it's those same I two I three I in conjunction with each other and so I don't know but it seems like it's not and then you have you know Michael, who even us having a conversation we couldn't... It was very hard to be speaking on the same terms. It's tough because... We sort of made up an idea that seems reasonable for the previous submission but we also have no idea how...
I guess what Judy was saying is like how do we know how Public Works decides how to budget The tree cost of install and how that plays into their yearly budget and their yearly schedule for everything. So it might be more important to align with that, the internal workings of the city than the ISA standards since they're Kind of complex, you know. Like yeah if we want to take into account the quality of the surface area of the diameter of the trunk based on the diameter of the trunk then it's a whole other conversation, you know?
People are spending up giving
us- Yeah when you have three different scenarios and all of them come into play with the exception of two III which has an if-then scenario kind of attached to it. It does create some confusion and then allows for some Basically expansion of the interpretation of how that is meant to be read I think we just saw the exercise tonight where it does. It's simply complicated It sounds like it should be simple Like AI was very simple you replace like for like for like that makes a lot of sense start diving into The trunk diameter and whether or not That's that number of inches is equivalent to what we're talking about from $1 standpoint Oh How do we get to there? And we're using a benchmark of a standard that we're entrusting those licensed professionals to come up with, right.
But they even have multiple ways...
Yeah, there's more than one way to slice it. So maybe what your comment is is to find a Like a comprehensive evaluation that is more simple than it is complicated. Because right now with three I's, I-I... It could be anything. It could be a number. Yeah we just talked about like at least three different scenarios in terms of how we arrive at... I think
it's okay to have a combination of planting and mitigation fees. That's all good. But the mitigation fee is complicated because you can't go strict diameter. Because if you have a 20-inch diameter tree that's not healthy,
this came up
recently.
No, but that's part of the calculation.
But that's part of the dollar calculation, not the value. But it's hard to evaluate. So if you're asking to replace by inch?
Well in the conversation that happened with Protana.
A previous
one. I'm sorry. Please don't use examples
that have already come before this body and talk
generally. Yes. One that we dealt with about a month and a half ago or something like that, a couple months ago. The arborist was saying, I can't tell when the tree is going to fall or not And so the difficulty is that the percentages and in the conversation in there, is that the percentages are problematic because they really you can get different opinions. But if you get a different arborist, you'll get drastically different percentages because of just intuition how it doesn't seem to be a science.
The value is based on an assumption of the health of the tree.
Right, the dollar figure but not the diameter. So there's two things we were looking at though. We were looking at okay, we've got 97 inches to replace or this appraised value to replace
3:08 – 3:1416 turns
And what he was saying is that actually this isn't actually about the diameter of inches. It's more about the surface area,
right? Right. So it's
a percentage that was problematic earlier. You know, it was actually the condition of the tree, what its worth and what would be worth
So I just caution being overly simple about it because it's very not simple.
It is
highly complicated. I kind of think we have to think about what are we trying to promote and create? Because it's like a little less about, then we could almost say This tree could be worth a million dollars. But what really matters is we need, we want something to go into the fund that will actually produce the planting of a tree and create the outcome we're looking for. We don't need $1 million. We only need whatever x for that because we just need to know how do we push this thing along?
That's an evaluation to like, I don't know. Yeah for us to understand how valuable these things are but the whole point is like with $100,000 you're actually not going to create the same value potentially of those trees because they're already creating all of the habitat and all of the things that gets lost with it right?
But in time it will. In time it will. Sure And that's what we want is you know, you know We have the mature forest right now. We don't have a lot of trees going in and so we're You know, we need to plan for our future So that's why we're talking about little smaller trees that will plant and thrive Yeah in the right
conditions
in the right
condition but like in the forest document there are a couple areas, you know like The The objective as well.
I think you're all hitting on a point that was brought up in both workshops, which is the canopy, maintaining that canopy. It was interesting too because coming out of that and I think you saw some of that within the summaries that were provided. There's kind of an understanding that I think everybody agrees that needs to be carefully considered. And then you're also hearing from some of the arborists saying that canopy isn't necessarily being completely diminished because the younger trees that you're having come in will eventually fill in. So there is something to be said about them being planted within the public right-of-way, because we control that. It's a little bit more difficult, especially the way in which the language reads currently where if an arborist comes in and says that the tree is hazardous For a reason that they've identified, they're not required to pay the fee or provide a replacement.
Now we can ask for the replacement and I told council this in the community as well especially whenever I'm meeting with people. We asked for the replacement when I first started here there was a resounding yes absolutely where do you want me to put it on the property? Let's find an appropriate location like whoa I'm not the expert here work with your arborist or your landscape architect to figure that out Now instead what we're hearing is, I don't have to replace it. I'm not going to. So the conversation has shifted so there's an opportunity that's been kind of crafted in here to put that onerous on those property owners to do that.
And so if it's hazardous and it's being removed that they still have an obligation to replace.
I mean, I think there's a lot of arguments in a lot of directions. But I kind of think that could be okay because I think in the end this is a small community. This is a small valley like we're all in it together you know like to say well I'm not responsible to put one tree back cuz like I'm not cuz I don't have to you know It's sort of missing the point because enough people say that and then yeah the tree canopy gets compromised
right so the the kind of the carrot to that approach is some sort of a Kind of offsetting fund That would help mitigate. So if it's like oh, geez this it's a highly mature tree It's 100 year old. Oh, it's being removed. It's it's hazardous. It got root rot something like that Like something that is significant right? Obviously your the idea is to try to get them to replace it. So we have that conversation and they say yes and Great, where does it go on the property? That's when you start working with an arborist or a landscape architect to sort through that. The council has already kind of identified an opportunity to find some way in which to offset some of that cost.
That could be part of the tree fund, because I think one issue that we will eventually run into too is like the public right away. Well it's concrete. We don't have, there's parks but do we have to fill all the parks with? There's a limitation as far as what the city owns and where plantings can occur. So we could still think about whatever the cost and whatever goes into that fund in the same manner. But if there's this overage, that's fine. That could go to planting a tree on an individual's property which is going to always have a lot more- Space. Space and garden or whatever to sort of support the argument a little bit.
In the visible
public space.
3:14 – 3:1922 turns
The tree fund doesn't currently provide for that opportunity. It could certainly be earmarked into kind of that carrot approach to offset. Yeah,
yeah. Well I don't know how does that get in
here? You know they say the best way to plant an oak is from an acorn right? So maybe, you know, in those instances where there are trees that come down that were hazardous at no fault of the owner, just false. That may be some kind of planting plan where you plant 100 acorns instead of an actual tree or something like that. That could be some kind of mitigation plan for the loss of that tree instead of just one-for-one replacement
And then you'd have to irrigate it.
Well, I have another idea that could play into the... would be the idea of creating a... because some of the things that Michael was saying seem very relevant. It's going to depend so much on how these individuals are locating and choosing the tree that's coming in, what that tree—the characteristics of the tree. Obviously the size but multiple elements of the characteristics.
Yeah, is it in a pot? Was it in the ground? Was it sourced from San Diego or was it sourced from just down the road. I think that there are opportunities within and this is, I don't know if this is really for the ordinance but kind of in the management thinking of it. You know, creating our own sort of like closed system with it and almost like some sort of oak tree or whatever approved tree farm that the city has. Or has some sort of ability to steward in some way to- Are you
talking like a nursery? A
nursery. I see. Yeah.
Interesting. Looks like the Nature Conservancy has that. Yeah exactly. I'm concerned
Sam. Because they are growing plants that you can go and buy from them. They
have their nurseries. They already got it.
They already have the nurseries now. That's a small-scale one.
But it's also good, Al West is promoting you know Arbor Day in a few places in the limited sense and you know became more of a deal for Ojai broadly if that day was made bigger and worked with the Land Conservancy and other you know kind of incentives with that there could also be you know Offering up a certain number of trees for wherever they wish to plant them in their property So there might be you know, there might be some incentives or ways of doing that
With with advice from the fire department. Oh, yeah.
Oh yeah Yeah are from foresters like Elvis was you know and so forth. So it's kind of cool. Mm-hmm
Have we given you sufficient comments to take this
forward? Well, yes. Absolutely. And I'll transpose those as we move forward similar to what I did for Historic Preservation Commissioner and we did for Historic Preservation Commissioner. Those are all going to be moving forward. I think the most important one is the fee structure, but we're so close to having reviewed it over the last month with two projects. It's kind of an interesting
situation. It's difficult to frame an ordinance in a positive way, because they tend to be thou shall not do this. So it's kind of a hard piece to do that. But having it more positively, I'm not saying more than it is, but I'm just saying taking a really positive or proactive thing into the ordinances would be interesting.
Yeah, creative approaches. I think the council and the community certainly saw that as a kind of way to go.
It's like design guidelines right? When you have it for the... If you have design guidelines for different areas and for the trees is just to have some kind of inspirational guideline for how we can become a forest management for the whole area. Great document, too. It was fun to read.
Yeah, I'm going to keep
that one. And finding out about the neighborhoods? I think that's really cool because I was looking in Topatopa and thought what was going on. And we've had a lot of trees this last year on our boulevard. So it's encouraging.
Good. OK, I think we will now move onto informational items Future agenda items comes up first. Do we have any?
3:19 – 3:2115 turns
Can I make a comment about the future agenda items?
Sure.
It has on here that, on September 16th, regulars- Are you
on the-
Oh, I'm sorry. I'm on your future agenda. Mike I can't hear you. You can't hear it. Can you hear me now? Yes, okay So the September so I jumped in ahead of Lucas because the two items for September 16th at your regularly scheduled September 6 meetings meeting Will not be on that date and they will be moved to hopefully October tentatively October
Both of those would be moved, leaving this with just the resolution that we requested tonight?
Yes. Well, the resolution, you didn't continue it to a date certain so I'll be working on the resolution. Staff will be working on the resolution and then bring it forward once it's
ready. When it's ready. OK. Yeah. So are we canceling the 16th?
I don't think there's any other items that are ready to go. Right.
So very likely?
Well, there are no items that are ready to go so you're looking at zero items for this meeting but I would need to hear from this body on a motion to cancel the meeting for the 16th.
I would make a motion to cancel our September 16th Meeting of the Planning Commission due to the paucity of items to consider.
Is there a second?
I'll second.
Roll call, please. All in favor? Aye. Any opposed? OK.
3:21 – 3:2619 turns
Is there any do you have anything else to say about the October 7th or whatever?
So, okay. So for October 7th There's the possibility of three items Assuming that the DRP and the variances are ready to go and then there's all these there's a tentative parcel map on 216 Park Avenue it's a subdivision it's taking really one lot into and turning it into three and
And that's a recommendation to City Council.
Correct. So I want to caution one of the commissioners, you might be within 500 feet of the project so just be aware of that. You might have to recuse.
Oh, I will check.
Well... We'll get verification.
While you're doing that, would you make sure that the notification comes directly to me and not just to the address? I don't get them when they go to the address. Long story, I'll fill you in later. OK, sounds good.
But we'll take care of that. Just let us know what you're talking about.
Director's report.
Yes, I have one item that I wanted to point out. I'm not seeing it in here. On the dais you should have a seminar that is... Ah! Here it is. Thank you. It was over here. Workshop that is directly tied to CUP's entertainment permits and on sale alcohol oversight it was emailed to me as well as I think a couple of the commissioners here and This is I think a wonderful opportunity for this body who sees these types of applications on the regular To kind of hear from, well it's identifying two individuals that seem to be well versed in these types of scenarios for an ABC permitting process. One looks like a restaurant owner and the other one is actually one of the district administrators for alcohol beverage control.
Informational and educational at the same time it is virtual. It is scheduled for October 28th Obviously bring this up again a couple of you have already identified an interest in doing it. I'll be attending virtually as well Is there a 330? $330 cost if
you're virtual
So the cost is being covered by the city. You already have a budget within the Planning Commission's annual budget, so it would be 100% covered. So don't worry about the cost. Just worry about the time and date and your availability and interest. If you are interested, you can let me know now. If you're still contemplating it, just let me know at some point because I will have to submit the list of individuals soon.
All right?
OK. Good.
Do we have a commissioner
member report? Lucas, weren't you going to tell them about the CEC adoption flex path. I'm sorry. I can't hear her.
Oh. OK, I can mention it. Sure. So the California Energy Commission has just recently adopted are you is anybody here familiar with the FlexPath ordinance that went forward? Well when it went forward, it had to go through two different bodies to get basically authorization. The first was the California Building Commission. It received that authorization, I want to say back in maybe May or April of this year Recently, as in over the last like five days it received official authorization through their resolution for the California Energy Commission. So now that that has taken place the FlexPath provisions can start we can start implementing those As projects come in so just want to make this body aware of it I know it's not something that came before this body but it is something that you as a commission should be aware of Because it's building code related, not zoning code related.
It would be helpful to get a report on that?
Yeah. Well I think there's two things that OK so I don't want to go into too much detail on it just a matter of information we can come back with something to kind of provide some education and update. Great.
And commission member reports? None? OK, we are ready for our city council liaison. Mr. Whitman.
3:26 – 3:274 turns
I actually wasn't going to make a report tonight but I do plan to raise the idea of taking a look at that $33,000 tree fund and make sure it isn't just sitting there, and get a report about the status of it, how it's being used. And look at the stakeholders that are involved with the community forest concept to get some parameters so it's proactively used as a benefit to the community forest.
Thank you. We appreciate that.
We're going to see it coming to us from different directions like the tree ordinance or whatever, but I think we need to say hey there's this money here and there is a lot of concern amongst a lot of the folks who really care about our trees Exactly what you guys pointed out that we have some, you know this fantastic number of really mature trees But not much in the intermediate age and so It requires some management Thanks.
Great. Thank you Okay We will call the meeting adjourned at 928