iHow this transcript is madeUnGovr transcribes the official recording with automated speech-to-text, separates speakers by voice, and matches voices to the seated roster. Names and attributions are AI estimates and may contain errors.Verify any quote yourself: click anywhere in the transcript and the official video jumps to that exact moment, so you can check any quote against the recording.Scheduled start 6:00 PM · clock-time estimates pending review
0:01 – 0:088 turns
Agenda Discussionitems moved / continued / pulled, click to expand
the public to address the Planning Commission about items which are not on the agenda this evening. Are there any? I don't have any blue cards. Is there anyone in the audience who wishes to speak at this time? Seeing none, how about online? No one online. We will close public communications. Turning to the
consent calendar, we have the minutes of the September 2nd meeting. Are there any corrections or changes to those minutes? Hearing none, we will accept the minutes as written. Disclosure of site visits and ex parte contacts. Katrina?
I have visited both sites for items two and three, no ex parte contacts. And I will recuse myself on item four because I live within 500 feet
Thank you. Jonathan?
No site visits or ex parte contacts.
None on my behalf.
OK, I have visited both sites and have had no ex parte contacts. We will now open public hearing item two. And could we have the staff report on that please? Yes, you may.
Just one moment. Make this bigger. OK, the request here is for a variance and design review permit to exceed lot coverage to give you the address first. Sorry about that. Oh, this is not my project. I think Lucas knew that. I'm sorry? There we go. I want to make sure, yes. No. I thought I had it, Lucas. Here you go. I'm sorry? There we go. Thank you. So this is a variance and design review request for a project located at, oh my goodness, 201 Lark Ellen Avenue.
The request is for a variance and design review permit. To exceed lot coverage from 42.35%, where 35% is permitted, the staff report in your packet includes a request for reduction and required driveway setback as well. However, after a deeper dive into the municipal code it was discovered that 24 feet are not required in this case. And in fact they're not required for driveway depth unless a garage entrance is perpendicular to a driveway.
So, there's an additional correction also on page 7 in the second to last paragraph where it states that the existing residence is 1,416 square feet. The correction is twofold. First, the number 1416 is incorrect. However, it's meant to be for the residents as well as the garage, the total structure and the accurate number is 1201 square feet. The proposed increase in lot coverage is resulting from two proposed additions, including a dining room and garage extension. The single-family residence is part of an existing duplex as you can see here on the screen.
Staff is recommending that the Planning Commission deny the request based on the inability to make findings as described in your staff report Um, which details that the subject site and existing residents are similar in shape and topography to other property in the vicinity. However, the actual lot size and residence itself including the garage are greater than those in the surrounding vicinity at this currently.
staff analyzed 16 surrounding parcels Developed in this duplex development and the analysis it again. This is in your staff report includes the subject parcel and the average lot size was found to be approximately 4,000 square feet and the average size of existing residence is 908 square feet The project site lot size is 5,500 square feet plus. And the residence and including the garage is...and here's that incorrect number. Well, the house itself is 1201 and you know what?
Sorry. is 1504 square feet, 1201 for the residents and 303 for the garage. Therefore the subject site is not denied of privileges enjoyed by others in the surrounding area which is one of the findings And the Planning Commission this evening is required to, or is charged with making all of the findings included in the code for approving a variance. The topic of the existing non-conforming garage There is a non-conforming garage and the topic of this came up before the meeting this evening Historic files indicate that there was an interior remodel potentially without benefit of permit and this Interior modification encroached into the existing garage, which was originally built to code Which is required to have an interior dimension of 20 feet by 20 feet and so As the City of Ojai Community Development Department is currently proactive when it comes to code compliance, and this interior remodel will be investigated separately from tonight's meeting.
So with that, again, staff was unable to recommend approval due to not being able to make the findings. And I'm going to turn it over to you. We do have an applicant here this evening who has provided us with something that he's going to talk about this evening. What I put before you is pretty much what he'll be talking about. But I'd like to turn it over to you now. Thank you.
Thank you, Maura. Do you have any questions for Maura before we turn to the applicant?
0:08 – 0:1534 turns
I didn't think I was going to have any, but I have one more. And this is based on what the applicant's letter said and it has to do with site coverage. It's 35% is the site coverage for the R1 zone. R2 zone, sorry. 35%. And the site coverage has in the code a note that says maximum percentage of the site area that may be covered by structures. And he pointed out that in the past, driveways were not included in that. So can you update us why it is now?
Absolutely. So a couple of years ago we had a planner who was investigating the details for a project that was coming before the Planning Commission regarding lot coverage. And it was found, and now we have to use because it is in the code. In the definition section of the code, site coverage includes driveways. And so yes from there forward, and it's been a couple years now, driveways are included in lot coverage when we're looking at additions or even new built developments.
I've encountered in other instances that there would be a lot coverage requirement, but then also like a built structure minimum. We don't have something like that though?
No and- It's just the
lot coverage offsets and then I guess the overall built square footage.
Well, so it's all added up. The individual structures and the driveway. And so the theory is looking back since we weren't here when this section of the code was created was to prevent mansionization. It's very common mansionization. So to build out the lot and it's not uncommon in different cities that the driveway is included.
Thank you,
well an uncommon or not it is in our code. So thank you
any other questions
Yeah, I just a little bit of housekeeping so on their plans Let me make sure I've got my numbers straight here on their plans. They show the APN ending in 475
so the APN that's in your staff report and is incorrect. The APN that's there was for the site, which is then it turned in... The lot was probably split and so there is a corrected staff report. However, it's not the one that you received in your packet. So yes, the APN is incorrect however you are looking at the project site.
Okay.
So the 38.2% existing includes the driveway?
Yes.
The current overbill status includes the driveway? Yes, yes it does.
So in addition- And does
the nine... Sorry, the 42.35%, is that just for the kitchen build up?
They're looking to expand the garage and a dining room. And those two plus the driveway equals 42.35%.
I mean, I do kind of wish that the site plan was bigger on this because it's kind of the most important thing in this plan. But he can get up and tell us but it seems like what they're saying is that a proportion of this is if you're just expanding the garage into the driveway then it's not changing the site coverage. I mean, that portion of expansion wouldn't be changing the site coverage.
Oh, that's right. Is that
what he's
saying? That's absolutely true. So
that's why
I'm just trying to
understand the numbers based... What would the new numbers be based on that
thought? We do have numbers on your site plan and so on page T01 we have an existing lot area, an existing residence of 1201 An existing garage of 303, and we have an addition of 215 plus 184. Just a second here. So the driveway, the existing driveway is 622 square feet, and the proposed driveway would be 437 square feet. So the proposed lot coverage is 42.35%. OK.
That's
the existing, that's the proposed lot coverage plus the driveway that would be remaining after it was encroached upon by the garage. Did I say that right? Yes. The driveway, the leftover driveway
Really the only the only additional Site coverage would be the side,
right? Honestly,
I
think so
It seems like the
reason why I thank you for bringing this up. The reason why this is included in the staff report is because initially staff was looking at a reduction in required Back out area in the driveway But since that's no longer or isn't, it was never a real issue. The expansion to increase the lot coverage is yes only the dining room however we still end up with the same square footage.
We have let's see
0:15 – 0:2214 turns
I just feel like this is the only drawing we need. It's very small.
Just a second. 1791. Lucas, would you mind doing a lot coverage calculation for me? We have 5564 for the lot size. May be 17-19 for coverage. Let's see. It looks like the log coverage doesn't take into account
that. Oh, here's the driveway 11.
17- 19 but I'm not sure. That's not right. Just a second. Sorry. 2%. Oh,
I see. So they did do the math down there.
Proposed driveway and addition.
Okay, never mind it looks like it was done in this
yes, and it's and it is the forty two point thirty five Yes,
so otherwise it would be
more. Okay?
Okay Do we have any other questions for staff before hearing from the applicant
No,
okay in that case I would invite the applicant to come forward at this time and
Good evening, everyone. My name is Eugene Vander and my wife is Sheila Vander and our son-in-law is Paul Vander and behind is Wade Elson who is our designer. And I passed out this to make it easy for you to kind of follow along and take questions whenever you like, either now or at the end. We moved to Ojai from Michigan and into our home at 201 North Grand Avenue in 2021. Our home is a duplex built in 1973. We live in the south half of the duplex.
And Maura has already alluded to some of what I'm going to say. After some changes made to the house many years ago by former owners, long before we moved to Ojai, the house's size increased to its current size of 1,201 square feet. The owner increased the house size at that time in part by chopping into and taking a trunk out of the back of the garage so the garage is now smaller and currently non-conforming to code.
Our proposed garage extension will correct this deficit and make it conforming. Excluding our driveway, our current lot or structure coverage is 27%. Our house's current size is 1,201 square feet, and the garage is now at 303 square feet. Note that our house is a single story residence and the additions will not add a second story. So the purpose of today's appeal is to gain approval of a structure increase from 38.2% to 42.35%.
And the description of their proposed variance, there's three things. One wasn't mentioned and I will mention it but it's very small that I want to get all out there on the table. The first one is we want to build a 215 square foot addition to the south side of the house in order to expand what currently is our really small kitchen and a very small dining room.
The second one was to increase the garage by 184 square feet, by extending it nine feet towards the front sidewalk to make the garage conforming. And as I've heard before, this will actually not increase structure coverage. It simply exchanges driveway structure coverage for garage structure coverage. In other words our garage is a little bit bigger, our driveway's now a little bit smaller.
None of these expansions will infringe on front, rear and side required setbacks. The total proposed structure will be 42.35% including the driveway and not too far in the past if you exclude the driveway we'd be proposing 34.5%, which is less than 35% which used to be the standard, is still the standard but now we have to include the driveway unfortunately for us.
Reasons for appeal to be approved. Oh, I'm sorry. There was one other one Expand the front porch by 17 square feet by simply extend the roof out a little bit That wasn't mentioned today, but I did want to put it out there. So that's a Front porch extensive of 17 square feet reasons for appeal to be approved One is legislative intent 35% lot structure coverage used to exclude driveways in Ojai.
City code introduced in the early 2000s included driveways towards a 35% structure coverage, but the city apparently never enforced this into the last couple of years. The city did email me and my wife that this driveway's a structure code was an attempt to prevent the mansionization which Maura just mentioned It was designed to prevent the mansionization of Ojai.
I don't know exactly what that means, but I can tell you a fact our house is currently 1,201 square feet and it's not currently a mansion nor will it become one after these proposed additions. So the city's legislative intent was never meant to apply to small houses like ours perhaps it was bigger houses. I really can't speak to that. I just know that we're not a mansion Number two is also what you might call dead law.
After over 20 years of not enforcing this driveway structure rule, it is reasonable to possibly consider this as a dead law. And last but not least, how will this affect our neighbors? Pretty minimal, extremely minimal. Bumping out a garage to make it conforming makes only one foot further out than our duplex neighbor's garage. So you hardly would even notice the difference from the street.
The south side addition will face Gregory Street, and those neighbors are on the other side of Gregory Street since we have our corner lot. And those neighbors and our rear neighbor will be shielded from this addition by our existing fence and wall and landscaping. And when we set this up, we made sure with Wade our designer that the pitch and height of the addition will be in line with our current house.
We've spoken with all of our immediate neighbors and none have any issues with our plans. Thank you. I'm not sure if there's any questions at this point.
0:22 – 0:2822 turns
Where is the curb cut currently in the plan? Like where do you enter or what do you get onto the driveway?
Um, it's basically right in front of our garage. In
front of the garage?
There is a two-car garage that is shorter in depth but width wise there still legitimate 20 feet and the driveway flows from that garage right to the street we don't have any interface with Gregory with our driveway does that answer your question
yes sir
It's on Lark Ellen, just above the curve.
OK. Yep, got it.
And certainly Wade, more of our professional design houses, if you have questions for him as well, that's why I asked him to come.
Mm-hmm. Yes, it's actually like here
It seems that we have have to consider the issue of Setting a precedent in terms of giving a variance to one neighbor that's not being asked for or given to other neighbors.
Eugene, you can probably take a seat. OK.
OK, we'll return. If there are no questions, we will return to the commission. The garage expansion obviously does not impact Cover lot coverage, so that really is no longer an issue before us. Is that correct?
That's correct. It didn't even need to be
discussed. OK, so really all we are deciding is the expansion on the south side of the dining room.
That's the expansion that will increase the lot coverage to 42.35%, yes.
Do you have any? Any more questions for staff? Yes,
can I respond to a comment that you had made earlier sure Because I've I've had this come up before with variances and I want to make sure that as you're reviewing these I realize what staff is identifying in terms of our recommendation moving forward but you have made the statement saying that this would be potentially precedent-setting and In the variant section of our code it identifies in 10-2.2607 precedences, each application is reviewed on a case by case basis and the granting of a prior variance is not admissible evidence for the granting of a new variance so that basically takes away the idea of the precedent piece yeah each one has looked on its own merits
okay thank you yes
my question for staff Is there any different weighting or consideration on corner lots in the city code that we should be aware of?
They have the same setbacks and lot coverage. Generally, often a corner lot is larger but I mean there aren't different requirements for a corner lot now. Not that affects this situation.
And did I understand correctly that If we rejected this, we currently have a garage that's out of code. But nothing would be done with regard to that garage because it's been there for several years.
Well, two things. One is when I was giving my presentation, I stated that code compliance is now proactive and this would be investigated outside of this meeting. However, secondly the applicant stated that the garage expansion would be to create a conforming garage so there would no longer be a non-conforming situation. Something was I'll say that the garage size would no longer be a non-conforming situation
0:28 – 0:3436 turns
Any difference between permeable driveways or paved or concrete or you know some other material in any sort of a Consideration there at all on
coverage? The code does not differentiate. The driveway area is required to be a certain width, and in one situation, a certain length. And it's not differentiated when it comes to site coverage in the definition.
So yeah. Well, I have a paper copy of our code because I get to write in it and with suggestions of how to update it. And this definition would be first on the list because it doesn't say if you have alternative materials that it could be waived.
I think the reason for that is because there's still cars being parked on it. It's still a place to be covered. I'll turn this over to you. Sorry,
I mean, I'm more I've seen more of the I've had more experience in other jurisdictions where that's it really is a lot about the permeability of the site more than like Something that can be on top of it, you know, so even the less permeable material in some cases Might not be considered law coverage But As I said, those codes that I've interacted with have a more robust sort of like layering of there's this for law coverage. There's this for actually building coverage. So it's a little more specific which I think is to Katrina's point.
I just think it's unfortunate that we're at a variance level issue here. I agree with staff that we can't support the findings for the variance, but with that said, I think that our site coverage... We need to look at that definition. It hasn't been used this way in the past. I know that as a matter of fact. And also with the new laws that are in place right now, if you convert that garage to a second unit you don't even need parking.
You know, so it seems ridiculous that it's a variance to me given all the new laws that we have. People can put in four units on a lot and not have any parking at all. They have to park on the street. There's no driveways. So our code is because of the new laws, it's making these just so archaic. So it's unfortunate. The current code, in my opinion, it's there in black and white. And the variance findings I don't think I could support. So I would agree with staff on this.
Would you put that into a motion?
Well, my motion would be to approve Resolution. Denying variants VAR 2601 and design review permit 2607, and direct staff to prepare a resolution approving requested variants and design review request. No. No. No. Try again. Oh, OK. To approve the resolution in front of us denying the variance and the design review permit. That's the motion. Is there a second?
I will second that, yes.
Further discussion? Sherry, would you call the roll? Roschmidt. Yes. Chesley.
Abstain.
Stewart.
Yes.
Murphy. Yes
That was a hard one.
Hold on, hold on. Did we open this up for public comment?
Pardon?
This is a public hearing. Do we open this up for public comment?
No, we didn't.
Right. So we
do need to do that. And we do that now?
Yes, that's part of the actions that we need to do. OK.
Public comment.
I know we
went
back and forth with
questions. I have no loose lips on this. Sherry, is there anyone online? No. No one in the audience. Seeing none, we will close the public comment. Thank you.
But now I would call it to vote, because now you've actually officially taken action regarding that. Now
we have to do the vote again? Yes. OK,
Jerry,
would you do that vote again?
Roy Schmidt. Yes. Chesebro. Abstain. Stewart. Yes Murphy. Yes
Thank you. OK. Moving on. Oh,
the lead?
You said
the lead though? Yes So basically you're saying no to our grant request. Correct
0:34 – 0:4011 turns
OK. The next item is a design review permit for a residence located at 802 Grand Avenue, and could we have the staff report please?
Yes. Where's my share screen? Oh. It's not sharing.
Did you do share screen?
Well, I thought I did.
Do we have new equipment?
No, it's me. It's you. OK.
Is this your thing?
There we go. That's
it.
Thank you, seems to be a common occurrence. So this project is located at 802 Grand Avenue and the applicant is proposing to convert an existing 308 square foot garage into an art studio Which would eliminate required covered parking for a single family residence. For background information purposes, the current enclosed garage is substandard. The Municipal Code section 10-2-1404 requires a two car garage or carport with minimum interior dimensions of 20 by 20 feet. And the existing garage is approximately 14 by 22 feet, so accommodates a single car and it's up here on the screen.
The applicant is requesting to replace the required covered parking with uncovered tandem parking in the existing driveway and screen from view by an existing gate. You can see that also on the screen above Section 10-2-1406D of the code includes that requirements for enclosed garages may be waived by the director provided that the area devoted to parking is visually screened And this process would require a director's exemption.
However, the code in section 10-2-1403 requires that the Planning Commission review and consider tandem parking which is what's being requested in this case for the alternative parking. Section 10-2, 1802 regarding multiple permit applications requires that when you're filing more than one related application concurrently that the final decision is made by the highest level of authority which is you in this case, the Planning Commission because again they're proposing tandem parking to replace the covered parking.
The driveway here is 12 feet wide. There is a pop-out window that interrupts the width by one foot, leaving 11 feet clear where 10 feet is required for a single family residence and due to... Let's see. Oh, there was a question prior to the meeting regarding The reality of access and clearance for cars here. And so staff did talk to the applicant as well as the architect before the meeting, and I know that the architect is here. I'm not sure if the applicant is but What was determined or made clear is that there is a ditch on the east side of the driveway. That does not interrupt a 12-foot driveway. What does interrupt is a popout window on the side of the house, and again, that's one foot so we have 11 feet clear where 10 feet is required.
There was a question about some items, and you can see them in the photos in your plans regarding some items that are leaning up against the house. And those items are literally just leaning up against the house. It was indicated that they're trashed. Anyway, with this information, the gates are able to open up all the way and accommodate vehicles going through adequate space.
Because of the ability to screen the parking and to replace the non-conforming garage, staff is recommending that the Planning Commission approve this request. And we do have the applicant as well as the architect here. Yes, we do have the applicant as well as the architect here if you have questions for them or, of course, from me. Thank you. Any questions
for staff? No. OK, the applicant is welcome to address the commission.
0:40 – 0:4524 turns
Hello, my name is Micah Sessing. I am a representative and designer from McLeod Construction. Also our client Denise Connors is here. The driveway, just took measurements today is sufficient for a 10-foot clearance as Maura was saying. The garage is currently not being used and in a very dilapidated state so she would like to use the space and fix the garage and turn it into an art studio so it can be enjoyed.
Any questions for the designer?
No. I have a question. Is this site in a hazardous fire area? We all are. Yeah, yeah, yeah.
And is there plumbing? Can I just respond to that? There are areas that are, but this is not.
OK.
Is there plumbing in the garage? There's no plumbing proposed.
The topic of accessory dwelling units was brought up in the last application, and it was discussed between staff and the applicant when they initially submitted the application. If this existing non-conforming garage were being turned into an ADU for instance we wouldn't be here talking about tandem parking. They wouldn't have to provide any parking at all. But they are, as Micah already said, they're not providing any and there isn't any existing plumbing in the structure.
Yeah it's you didn't want to sink Just an art studio
OK, no other questions? Thank you. We'll open it up to public hearing now. I don't have any cards. Is there anyone in the audience wishing to address this item? Is there anyone online?
No.
Then I will close the public hearing. We will return the discussion to the commission Anybody got any comments, questions, problems? Motions. Well,
sorry I don't know. I just have a question about consistency and it would just be interesting to hear from the last project that we just discussed to this project where we kind of have to make a choice between non-conforming garage or making one conforming or whatever. It'd be interesting to hear a little narrative or perspective on that.
So the last project had a potentially unpermitted interior remodel that made a garage non-conforming. This is an existing, non-conforming garage built in 1957 I think that was built this way. And we're not looking at something that I thought you might be bringing into this and perhaps you're not is also like lot coverage But there are no additions being proposed in this situation. So we're not looking at lot coverage. We're looking at Turning a non-conforming garage into a studio and having the parking outside yeah, and with it being a required screening
Yeah, I know the purpose of my question is to get what could be perceived as a contradiction on the record. So I think your comments cover that. Thanks. Thank you.
And also this one is not a variance.
Correct.
So there's very specific findings for a variance and this is all accommodated within the code itself?
Right, and the findings are included in your resolution and staff report. Staff was able to recommend approval based on findings.
So we're going from outside parking to continued outside parking, basically? OK. Is anyone ready to create a motion?
I'll make a motion to approve the resolution as it's stated.
I second.
Further
discussion? Hearing none, Sherry could you call the roll?
Rai Schmidt? Yes. Chesebro? Yes. Stewart? Yes Murphy? Yes
0:45 – 0:509 turns
Okay moving on to item four
OK. Could we have the staff? Yeah, hold tight there. Let's let Katrina
move.
There we go.
OK.
All right. Staff report. Thank you. Good evening, Commission. My name is Lucas Seibert. I'm the Community Development Director here for the city of Ojai for the audience before me as well as the audience online just to state the record. The item before you tonight is a item that was continued to a future meeting where the commission had taken an action to bring forward a resolution approving what is a phasing project for cottages located at 312 West Alisa Street. So, the project that was discussed on September 2nd at this meeting as a public hearing item. This item is up for discussion tonight There is a resolution before you tonight that does identify and capture what was discussed at the September 2nd meeting.
In addition to that, staff took it a step further and take a look at all of the questions that were raised at that meeting. And as we have done in the past and remaining consistent with that, responded to those questions. Provided those as a part of the attachment that you see before you tonight for clarification just to provide additional context for the record for this item. Just to give you a little bit of history for this, for you just as a reminder, as a refresher, as well as for the audience.
This is the cottages project, which is a part of a 12-unit four phase development that is ongoing. Currently they finished the first phase are working on the second phase and in doing so they recognized an opportunity for the fourth phase to run parallel with the second phase obviously or not obviously but To provide additional context, the fourth phase is really meant to place two units and then to stub out utilities because the issue with utilities as the complexity of this project just continues to be very interesting considering it's 12 units.
Is the utilities actually go through phase 3 which cannot begin until phase 2 and potentially phase 4 depending on your determination tonight are done. So what that means is the action that you're looking to consider for tonight would be having phase two, which is currently under construction run parallel with phase four And having conversations with the applicant I see mr. Becker is online He's available for a question. He may have something to say tonight he may not Having those two run concurrent there is some time savings Then it is in the tune of about three to six months Is what he's he's thinking in his estimates and talking to the?
the on-site manager Additionally, there was additional context provided regarding the foundational work and the noise and kind of the way in which that foundational work is to be completed. I did a little bit of research to kind of understand how those pins are placed into the ground which was provided within the staff report tonight as well. So with that if the Commission has any questions of staff, I'm certainly available to answer And then obviously we'll need to open it up for a public comment as well.
And then I would also invite the applicant to Respond as well tonight
Okay Do you have any questions at this time for staff? No questions okay Jeff, would you care to address the commission now or after public hearing?
Good evening planning commissioners and city staff. I'm sorry I couldn't attend in person. I am traveling on the East Coast but happy to answer any questions you may have.
Okay thank you I will open it to the public comment section. And I have a card from Anita Cram.
0:50 – 0:579 turns
Good evening, everyone. So I'm going to read some public comments. I said, and it's you know the neighborhood surrounding the cottages among the flowers do not want these to proceed simultaneously. And there's really not a good reason for it. It's not best to do it all and just get it over with its bedrock there. You know, this drilling is not going to be easy. It's going to be very noisy vibrational you know it's going to be coming at us from multiple sides the original phasing plan sought to deter that happening they were thoughtful and good in their deliberation process So the develop and also in addition to that, you know This approval was not done correctly. The development director had no authority to approve by decree That switch You know this their CEQA that was You know That should have been the guidelines for this also conditions of approval were not followed with it
Anita are you are you referencing? 2007 approvals
I am. copious documents involved in this project, and I have gone through all of them multiple times. And the CEQA negative mitigated declaration requires for historic resources that the cottages be mitigated for the loss of a historic resource to the city which is also to the state and to the national level. And so there was no authority to change The look of the cottages from the historic nature of them to prefab Samara units from Japan. That was, you know there was no authority to do that and you know the settlement agreement also you know one of the reasons for doing this or the big one is to prepare us all for what's going to happen at Mallory Way where those were not even approved The authority for Planning Commission to approve those is not there because the settlement agreement is very specific about the interior of the Mallory Way historic bungalows and any additions there that has to go to City Council.
They're the signatory to the settlement agreement for this whole project, so You can't backtrack and say, oh well we're going to do the cottages first. And then we're going to get approval for the Mallory Way bungalows because that has not been properly approved. These developers have a pattern of just foraging ahead with things and hoping that forgiveness is easier than permission. They did that with the creek.
And, you know that still is not settled with the state and for them to say oh these are ready to go in place. Why did they even have them built before? You know some of the documents say oh we've got these Summer units ready. They're sitting. We're ready to bring them. We're ready to drop them in place. Why? I mean, there was never approval. There was never approval to change the phasing. So this seems to be another one of the cavalier approaches to just do it and not care about the process. And it just has to make we the public question what is going on here?
And what's going on with the city? Why do these developers feel so confident that they can go in and do these illegal things, and do things that just aren't fitting the order of the process or the... you know, and it'll be okay. You know, hey, sell the Samara units and start over when the time comes. I have no sympathy for that. They knew what they stepped into when they stepped into this project. They stepped into a time-honored loved place in the city of Ojai that is of historic nature, that trees are dying because of this whole process And nobody seems to care up here. And I have no sympathy, and I don't think you should either for the developers.
Thank you, Anita. Is there anyone else in the audience wishing to address this issue? Is there anyone else online? No. Jeff, do you have any further comments?
No, as we did at the last meeting, we detailed out Our hopes to get some of the underground done and to improve the fire road, which is going to be required. It's been provided to the city related to phase two so we're gonna need to do that before the phase two can be occupied. Other than that I'm happy to answer any questions you guys may have.
Were you going to have to rip up some finished road if the phasing continued separately?
That's the access road off of Aliso, which the fire department is requiring that be installed prior to phase two being occupied. Phase two is three units and so we would then have to come back obviously trench and remove part of that road to put in some of the utility feeds because they're coming off of Oak Street versus Aliso. The road is off of Aliso, but we're having to kind of cross a portion of phase three and phase two to intersect the phase four units so we'd have to do some backtracking and removal
And just remind us that how this phasing helps with that Jeff
Well, if there's a number of reasons the the phasing Gets those utilities in at least the conduits and so they're stubbed in but we're not asking to occupy phase four by the way We're just asking to try out the Pen system, which I think the city put some links on there for you guys for that. Which one of the major savings with that pen system is it's basically a week install versus a number of months installation that you would normally face or at least a month and a half on a standard foundation.
But that's one of the critical things with it and of course the fire lane, which is an access lane off of Aliso The west side of the property all the way to the rear of the cottages.
0:57 – 1:1135 turns
I mean, could just for argument's sake couldn't the utility work go in and that have nothing to do with the Summer systems? To avoid any sort of like infrastructural forwards and backwards movement?
You could do that. One of the issues is the road which we need to put in extends through to where the Summer staging would occur for the lift, you know this is a big crane lift that's going to have to happen so I don't know whether the fire department would allow us to just put in a portion of the road I just recently asked them that, with the assumption that maybe we could move forward with phase four.
But there's a section of the road that goes in as it lays now that's going to be used for staging. So you wouldn't want to stage it over a new paver install, especially with the size of the equipment.
OK.
Thank you, Jeff. Go ahead.
Jeff, a couple of questions for you. How many total months less construction does your proposal grant the project?
Just to clarify, how many months to
reduce? Yeah. The idea is that the actions we're taking, shifting the timeline here a little bit allows you to finish the project in a way that's a little bit different than contemplated originally. Is there speed up? Is this a 30-day improvement, 60-day improvement or is it neutral?
No, it's probably four to six months You have savings to shorten it, so that's one of the motivations. And that's one of the reasons that we did our homework and searched out the Summer units in those designs so those could be craned in, so you're avoiding all the typical construction framing and noise issues that would occur.
And so if I'm a resident and I live here or near here, how do you communicate with the neighbors today? What's the process if I live here and I want to know what's going on, what's coming up looking 30 days down the road or something like that. How do I follow this and how do I understand what's happening around me?
Well most of the neighbors have my home and cell phone number And have for years. So many of them I talk to on a every couple of week basis, depending on what's going on. We've had a lull recently because we modified phase two reduce the size of those units and those plans and permits have been processed through the city so those are just getting ready to get started again.
So the majority of them we speak related to that, but phase three and four which would be coming on maybe another six to eight months from now. We'll be noticing our occupants at the buildings and then any neighbors are involved because we have some common fencing that we're replacing. I don't know if you've been out to the site Brad, but I'm happy to walk you through it You know, there are some common things. Utilities and fencing that we've cleaned up as part of it.
It's been a bit of a quagmire as far as utilities go. A number of the neighbors were backfed through the project.
Do you keep any sort of complaint log of neighbor comments or anything like that?
I have kind of ongoing email, yeah. But it's mainly communication relating to different things.
Yeah, and I'm kind of skipping around a little bit. But just a few things. You know, I'm not being the architect on our commission here. I'm just thinking about the people and the humans. And so it would seem driving the pins in is going to be disruptive, of course. It sounds like did I understand earlier this is a two-to-three day process?
It's like five to seven days,
roughly. Five to seven days and do you photograph for instance the interior of the neighboring houses or anything like that so if somebody had a crack or a damage claim or something that they believe was caused by the installation of these pens that we would have kind of a before and after image?
We certainly could talk to the building. There's two neighbors that are pretty close to it. We can communicate with them about that. These are, you know, these are not like pile drivers. That's one thing I don't know if you watch the video on it but these are not like big steel beams for instance they are steel pens So, you know, I've now gotten to see him in action at a job site in Santa Barbara. So the noise level is really it's somewhat similar to, you know, framing nail gun. So it's a little bit different than maybe a big massive pile drive which I've done that in Ventura and that definitely shakes things
And an arborist, I assume has somehow been engaged or maybe the question is have they been engaged to consider the impact of the pins going into the ground near any adjacent oak trees or anything like that?
Yeah we had Bill Mellet on this project. So Bill has looked at the plans he was part of the work and review a bit when we first started working on these two units for phase four
And on the city side, we've got Jan Scow who has been visiting the site
regularly. The Summer units are actually smaller so they were able to save more
trees. I have a question for you Lucas. How many years old is this phasing plan? How many years has that plan been around?
2008 was when it was approved by the Planning Commission. So it's
an 18-year-old plan?
Yes, this project has been going on since early 2000s. Yeah,
I'm familiar with that. But it's an 18-year-old plan. And I guess one of the questions I have, you know, this thing could have been born and graduated from Nordhoff by the time we're done. The new places may be historic. As I understand it, the agreement allows some flexibility and some adjustments to be made in that plan where the city deems or you deem those are necessary. Correct?
So this, you're talking about the settlement?
The settlement
agreement provided for the moving of forward of density in terms of the number of units as well as four different projects. This project is included in that. As well as two ADUs that were included in that as well. The way in which those have been processed are consistent with the conditions of approval that were adopted. Within the conditions of approval, as a reminder, the phasing plan includes a condition that talks about Phase 4. Prior to Phase 4 moving forward it shall come before this body. That was the vision with the Planning Commission then as part of the phasing plan.
For review and consideration. So that is what we are doing now in doing that they've skipped a step They skip phase three and really phase two at this point because phase two is under construction Or at least going to start construction once again, it had started construction then paused and now it's under construction again The phase four piece is as we see it, as staff sees it and as part of the resolution consistent with that phasing plan in terms of that condition of approval which I have in my notes here what condition that was specifically but it's like condition 28 or 30 something within the phasing plan. Those conditions were a part of the original approval. They were basically a tiered-off piece to that original approval that went before City Council.
So this is, instead of it going to City Council as the original project received approval in 2007, this is looking at the way in which the phasing plan is being modified slightly.
Yeah and what I'm trying to do is just get the framing correct actually. This is an 18 year old plan That we're learning could be sped up. There are trade-offs, more concentrated construction time means more noise, dust, et cetera, et cetera. But it does seem like on the whole this is part of the settlement issue so the issues kind of closed in a certain way and we're talking about phases that we know we have some flexibility around But it does seem that if there were more communication to the community, some kind of formal documentation on probably both parties' side, photographing the houses, making sure that extra level of consideration is taken for the way people's houses are built. I know even with the last couple little shakes, you know?
I know people who have a crack here and there. But it seems like with a little extra consideration there, the big win here really is we're still sticking to some form of the phasing. We're speeding the development up and honoring what essentially existed in a long negotiated document. Is that framing largely correct?
Largely correct. Yes,
yeah
to the to in response to the comments that's come in from the public I recognize The concerns and considerations that have been brought forward The applicant this has been an interesting and messy project since the phasing plan went forward it's I wasn't here obviously for that instead I'm picking up the pieces since 2019 when I started That being said, through the settlement agreement which council brought forward and took a really I would say a positive step forward towards housing an affordable housing mind you in terms of how this whole project and the phasing of this project in particular Has been handled the I think the important thing to note here. The comments that came in have been responded to by more than one question response document It's it's pretty clear that there's disagreements with the way in which those are being responded to but we have been thoughtful in terms of those responses and You know the the commenter is not the only one living in in the construction zone.
That is very uncommon In the history of me working in different cities and jurisdictions This is the first time that I've seen actually having an active project where people are actually living in the active construction Zone, which creates some conflict for sure
Mm-hmm
I think, Brad, you're also getting a little bit more at like not so much maybe that the city needs to be communicating or responding always to. That's not the focus we're getting at but more that maybe a formal regular monthly update from the development team to the neighbors and community like hey this is what's scheduled this month and this is what we're doing You know, we finished this last month and just something that actually gives a bit of clarity and like involvement to the narrative. This
is an 18 year old. Plan People don't learn that in a consistent manner. And when their lives are impacted in one way or another without that consistency that you talk to, I do think there's an extra lap, Jeff, for you and your team. And hopefully the net-net-net is you finish an 18 year old project five months ahead of schedule. If somebody got a crack on the wall, you guys had a drywall person come in and repair it on your dime.
1:11 – 1:1922 turns
Yeah, I mean, I think that it would seem advantageous to finish the project sooner than later.
Yeah, yeah. I just think a communication framework would be very helpful here because even that timeline may slide. You never know. But what's clear to me in the comments and reading everything, what's clear to me there is a gap in communication. And I think closing that gap is part of the project here.
It's interesting, the one piece to the gap that I think was glaring and it was a glaring piece that came up almost a year ago to the day in September of 2025. And that is several of those conditions of approval were not being followed in their truest form maybe kind of like in a gray area. Having a conditions of approval compliance officer coming online and actively going out to the site and working with the general contractor to ensure that those conditions are being followed, being read to. And then basically step by step. Now that's being handled on the city side, the conditions of approval side but to be fair you know individuals like the resident that just spoke just a few moments ago they're not aware of that unless they're reaching out to us specifically You could add a condition that encourages the developer to hold monthly meetings or something that feels reasonable To to identify how the needle is moving on this project.
I Would like to hear from Jeff in terms of where he he stands on that
a report or a meeting or just Do you have any thoughts on this?
Oh, I have a lot of thoughts. You know we have so many different players involved in this project consultants related to you know all the different conditions on I'm sure the city staff can relay those to us. You know I do meet with Lucas quite a bit on the project but yeah I don't have any real problem Adding a monthly update. Our focus on this thing is multifaceted, we want to get it done quicker.
We took over the project in 2014 that's when we acquired it so all those planning approvals were done long before we got involved with the site but yeah happy to have a monthly meeting I talked to some of the neighbors weekly I don't have any problem with an added condition of some sort of a monthly meeting or narrative that you guys could even be copied on. That's fine with me.
Yeah, I think that would be very helpful. It's Uncle Ben from Superman. With great power comes great responsibility. And I think you do have a responsibility to the people who live there. They've been pretty consistent from what I've seen in their commentary. And I think getting that lane open and communicating and allowing the speed up of this project It makes me inclined to recommend that we move forward and approve it.
Would you like to put that into a motion? I was
afraid you were going to ask me that. Now, I have to collect that into some thoughts. OK. I don't know if there's any other discussion that's
needed
before we go
into further discussion.
Let me just look here because I want to be precise And I'm going to look at attachment A.
How about using that?
Yeah, I'm looking at attachment A is what I'm doing here. Maybe, Lucas, to save us some time. Attachment A, the four-page resolution. Does that capture the spirit of the framing?
Yes, I would if I could make a suggestion in terms of kind of the rough language of this additional condition if you are going to be considering it. It would read something like the property owner applicant shall provide a monthly meeting progress report for the benefit of the community.
Was that meeting or progress report Or
was that? A monthly meeting progress report. I framed both of them so they could either be a meeting or progress report, but it would definitely go out to the community and we have access to those community members that are living in cottages as well as within that surrounding area as well.
What I've experienced with like large developments sometimes is that they'll have a sign up, you know. You sign up for their email list basically and then that thing's gonna come out, you know? And they put some effort towards this explanation and now we actually even then not just the whatever eight to ten to fifteen people in the vicinity but anybody in, you Keep tabs on what's happening, which I think is something that a lot of people in the community might be something worth thinking about at a larger scale.
So that feeds into that but it's just a matter of access, I guess. A meeting seems a little onerous to me. Too
much, I mean monthly. I
think just getting the information out there sounds like everybody knows how to get ahold of Jeff if they have questions about the information so as long as that information is set forward Is clear on how one can
remove meeting and to say progress report that report doesn't necessarily have to be in person in writing or in person, but it definitely provides
To be clear. We know everybody can get ahold of Jeff isn't good enough That doesn't work for the residents So I think we do need to pit a pin in it that says there is the monthly report And the monthly report is delivered to their residence And and I do so, I'm gonna try to wrap this into a motion So I'm going to I'm gonna vote that we adopt Move that we adopt resolution 26 as drafted and recommended by staff With the following modifications one is the 30-day report delivered to residents and people impacted by the project and The second amendment I would make is photographing before and after homes or sensitive areas which could be impacted by the pen driving And I think let me just speak, I think those are my only modifications
1:19 – 1:2217 turns
Jeff what homes are near where the Summer units will go in
There's two residential homes that face Mallory. So they don't have the addresses at this time, but they face Mallory. Those are the closest to the site.
Right. Can you just invite those homeowners to photograph their Residences, in case there was a problem.
I think the motion could be modified to say that the developer and the impacted owners will agree on a way they can drop photos to him or create a drop box of before and after. Yeah, I
think we're assuming that they're going to be agreeable to him going, or even a representative going into their home. So I think providing that additional layer of an option is probably appropriate.
Yeah, so just one last little cleanup. Sorry. In the 30-day report I think it should be required that there is a statement estimating what's happening with this speed up time. I think we should be specific around that because a major benefit to me is we're changing the Game plan a little bit here so that you can get this 18 year old project on five months later Play it out that there would be a report where you suddenly discovered. Hey, there's another five months We found another bad hookup to the city that we didn't anticipate on plumbing or tickets eat us or whoever And informing the residents of the timeline a little bit. And to me, that's best efforts not legally binding timeline it just simply a comment by Jeff and team.
You're not putting that in your motion are
you? I do believe there should be an estimate on that timeline speed up And I'm putting
that
in the monthly update.
In the update, they'll include an estimated schedule and update that schedule each month.
OK. Is there a second?
I'll second that.
Any further discussion? Hearing none, could we have the roll call please? Stewart.
Yes. Chesley. Yes. Murphy.
Yes
Thank you. Thank you all. You're welcome.
1:22 – 1:264 turns
OK, we are Done with our items two, three and four. So we are moving on to future agenda items. Do we have any comments on future agenda items?
There are so the good news is is that we have items for the next two meetings at least and it looks like Potentially for the next three all the way up until Thanksgiving There's no bad news, that's just good news So what we have going on is a miscellaneous application for code interpretation For the use not listed in the zoning and that is really a tattoo embody piercing studio. There's already one additional one that's off of So this one is proposed on 305 East Matalaha and certainly will have information in a staff report identifying the process requirements as well as So they'll be details in there. That's as far as I'm gonna go Not giving anything else away, so you have to stay tuned for the staff report as it comes out obviously if you have any questions we encourage you to To reach out to us because it is a little bit on we this is only our second one in the city.
So And then they additionally is a proposed tentative parcel map for 216 Park Avenue a subdivision That will be creating three lots where one currently exists, so it's taking one to three. I Don't know we'll have to do the full research But I don't know the last time they've actually had a parcel map that's come forward before this body So it's been a number of years. So we'll provide some some background on that as well and chair Murphy will need to recuse I Right, and nobody to necessarily talk about recusals at this point. And then on November 4th is a DRP for 923 East Ojai Willow. You saw that maybe three or two months ago as a concept or just kind of like introduction item so you'll be seeing it with revisions based on the comments that were received.
In addition to that, and there's even more information on that one. I'm not going to give it all away You'll see in the staff report Additionally there is a minor CUP for 315 North Montgomery Street Ojai routes That is a return item from the 90-day review back in June or July Anyway, it's coming back and hopefully we'll have good news to report We're still working behind the scenes to ensure that that turns into good news 18th And it's kind of a question mark. It's the Humane Society at 402 Bryant Street, they're looking to do an expansion and conversion of some structures so you'll be seeing that but it's still yeah we'll see if that's ready to go by then hopefully it is And then you see the other future items. Those are all either incomplete, or we're waiting for information.
Some of these have been incomplete for a number of years and we're still working with them to try to get those things resolved. With that, that is all we have for the tentative agenda for Planning Commission in terms of upcoming meetings. We don't have a logjam but we certainly have like a steady flow of projects that are coming in so.
Good. Anything else with a director's report?
Director's report. Yes, I have some information. Some fun information, some introductions as well. So I'll first start with the introductions. I want to introduce Addison Hernandez. You can stand up, Addison. You don't have to come to the podium if you don't want to, but you are welcome to if you want. Addison is coming to us. We had recruitment for an associate planner, he made the cut and we've brought him on. We're super excited. He started a week ago and we didn't waste any time. He's already getting his hands dirty in terms of different projects. He is reviewing researching and he's certainly diving into the code as we call it right? The deeper dive in terms of the research so Super excited to have him here, and you'll see him in the future in terms of giving presentations.
So we're looking forward to that.
1:26 – 1:303 turns
Welcome aboard, Addison. OK.
All right. I have more. This is one of those rare times where I actually have some more information to divulge. This past weekend, myself as well as staff to my left, Mara, as well as Addison attended the annual California APA planning conference. The interesting thing about this conference is that the focus from what we could tell was mainly on housing. It was mainly on housing but there's always these little nuggets in terms of what comes out of some of these workshops and seminars And just to give you a wiki leak on some of the pieces, like for instance there was a seminar on CEQA and the title was CEQAs dead. Long live CEQa. And what we found from that is in fact it's not. It's just from a housing and affordable housing standpoint there's a number of exemptions that developers have the opportunity to apply so While CEQA on other projects that are not affordable housing related are certainly going through a full EIR various review processes Housing related affordable housing related projects or not In addition to that, guess what?
The same line for housing is the Housing Element Update. So we are getting ready and I've already started attending subcommittee meetings for SCAG And you are likely to see reports coming to you for evaluation of our, basically our programs or housing element. To make sure that we're hitting the mark. We're already working on some of those through subcommittees to make sure we're hitting the marks on some of those bigger ones and then you'll see that we've actually done a lot of really good work within this sixth cycle but leaning into the seventh cycle is going to be just as tiresome and demanding as the sixth cycle was So, stay tuned because that is coming. It's two years out but I can tell you right now two years is coming very quickly.
Let's see anything else on that? Do you want to add anything? No? Ah, one more piece regarding what happened at the APA conference. So with the general plan update the city council included a climate action plan piece and I had the opportunity to attend one of these seminars where there was two different cities that actually spoke about their how they took a climate action plan from start to finish One of them was actually a county and then another one was a city in LA. The way in which they approached the situations were very interesting and very thought-provoking, so we're looking to work with the consultants to try to mirror some of those approaches so that we find success and when we make sure that the community is well involved and well informed on this moving forward.
With that, that is all that I have in terms of updates.
OK. Thank you. Commission member reports?
1:30 – 1:321 turns
Anybody go to Mac? I went to MAC and I was pleasantly surprised and very interested in all the updates from all the county offices and different organizations in the county. Some of the items that were reported at MAC have already come and gone, so I won't report on those but there's a few and I'm sorry for all the people that already know this already because it's probably been told at City Council The Ventura River Watershed adjudication meeting is at Kent Hall, October 19th.
Ojai Library is closed as of July 31st, reopening spring 2027. Miner's Oaks in the Ojai Valley... Ojai... Is there one in Oakview Library? And on October 10th, what is today? 7th. Lisa C., the author will be at downtown Ventura Library So that's kind of interesting. She writes very delicious novels. VCEmergency.org, they encouraged everyone to sign up on VC Alert for any emergencies. They're preparing a disaster guide and they would like feedback from the public.
Let's see, the Ventura County Public Works Agency has a Vision Zero Action Plan. They just received a $900,000 grant to create a plan to reduce traffic fatalities and serious injury in the unincorporated areas of the Ojai Valley. Oh actually, of Ventura County not just Ojai Valley but... So if you have any input on that Fabian Campos is the project manager and public Comments are encouraged and there's going to be a survey out and an interactive map If you want to go on the Ventura County website There was all kinds of different things but those are the major ones I wanted to report
1:32 – 1:333 turns
Thank You Katrina Next, we would be honored to hear from our city council liaison, Mr. Whitman.
I don't have a report but thank you guys for giving your time to the community.
Thank you Andy. OK and with that, we will have adjournment at 733. Thank you.